ML20063L111

From kanterella
Jump to navigation Jump to search
Revised Operating Status Pages to Dec 1993 Monthly Operating Rept
ML20063L111
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 12/31/1993
From: Piazza F
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20063L107 List:
References
NUDOCS 9403040005
Download: ML20063L111 (2)


Text

- .-. . _. . . . . .- -. - - - . _ _ - . .- _ _ -

REVISED COPY co**************************************************************************

-UNIT 1 OPERATING DATA REPORT oc**************************************************************************

Docket No. 50-317 January 13, 1994 Prepared by Frank Piazza Telephone : (410) 2 60-3821' i

.i OPERATING STATUS -

l l

1. UNIT NAME Calvert Cliffs Unit 1 1
2. REPORTING PERIOD DECEMBER 1993
3. LICENSED THERMAL POWER (MWT) 2700 l
4. NAMEPLATE RATING (GROSS MWe) 918
5. DESIGN ELECTRICAL RATING (NET MWe) 845
6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 866
7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 830 ,
8. CHANGE IN CAPACITY RATINGS NONE
9. POWER LEVEL TO WHICH RESTRICTED N/A
10. REASONS FOR RESTRICTIONS N/A Cumulative This month Year-to-Date to:Date
11. HOURS IN REPORTING PERIOD 744 8,760 163,501 +

'12. NUMBER OF. HOURS REACTOR WAS CRITICAL 744.0 8,619.0- 116,969.0: 1

13. REACTOR RESERVE SHU.DOWN HOURS 0.0 0.0 3,019.4 I
14. HOURS GENERATOR ON LINE 744.0 8,599.5 114,578.4
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,986,093 23,035,968 290,314,819
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 662,384 7,646,012 96,473,546
18. NET ELECTRICAL ENERGY GENERATED (MWH) 635,795 7,334,896 -91,804,282
19. UNIT SERVICE FACTOR 100.0 98.2 70.1

-20. UNIT AVAILABILITY FACTOR 100.0 98.2 70.1' ,

21. UNIT CAPACITY FACTOR (USING MDC NET) 103.0 101.1 68.0'
22. UNIT CAPACITY FACTOR (USING DER NET) 101.1 99.1 66.4
23. UNIT FORCED OUTAGE RATE 0.0 1.8 8.7
24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):

Refueling, February 4, 1994,.95 days

-25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP: 1 i

N/A l

\

n i

9403040005 940215 DR ADOCK05000gg7 {

I

.--~~.

. - - . .. = . . ,

~a

., REVISED COPY.  ;

CQt*************************************************************************

UNIT 2 '

OPERATING DATA REPORT QQ**************************************************************************

Docket No. 50-318 January 13, 1994 Prepared by Frank Piazza Telephone: (410) 2 60-3821 OPERATING STATUS

1. UNIT NAME Calvert Cliffs Unit 2
2. REPORTING PERIOD DECEMBER'1993 ,
3. LICENSED THERMAL POWER (MWT) 2700
4. NAMEPLATE RATING (GROSS MWe) 911
5. DESIGN ELECTRICAL RATING (NET MWe) '

845

6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 866
7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 830
8. CHANGE IN CAPACITY RATINGS NONE
9. POWER LEVEL TO WHICH RESTRICTED N/A
10. REASONS FOR RESTRICTIONS N/A Cumulative This month Year-to-Date to Date  !
11. HOURS IN REPORTING PERIOD 744 8,760 146,856
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 6,072.4 106,036.8-
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6  ;
14. HOURS GENERATOR ON LINE 744.0 5,941.8 104,523.6
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,997,513 15,720,751 266,865,543 l
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 671,946 5,197,091~ 88,155,869
18. NET ELECTRICAL ENERGY GENERATED (MWH) 645,972 4,974,705 84,243,134
19. UNIT SERVICE FACTOR 100.0 67.8 71.2
20. UNIT AVAILABILITY FACTOR 100.0 67.8 71.2
21. UNIT CAPACITY FACTOR (USING MDC NET) 104.6 68.6 69.5
22. UNIT CAPACITY FACTOR (USING DER NET) 102.8 67.2 6 7_ . 9 '
23. UNIT FORCED OUTAGE RATE 0.0 1.0 5.7
24. SHUTDOWNS SCHEDULED OVER THE NEXT

.SIX MONTHS (TYPE, DATE AND DURATION):

N/A

. 2 5. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:

N/A

_ - _-