ML20063J617

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1994 for Callaway Plant Unit 1
ML20063J617
Person / Time
Site: Callaway Ameren icon.png
Issue date: 01/31/1994
From: Blosser J, Mcinvale J
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-2957, NUDOCS 9402240089
Download: ML20063J617 (6)


Text

_ _ _ __

.t

, Ca!!way Plant

. Post Othce Bcx 620 <

f u!mn. M%curi C5251

, February 11,1994 .

i i

UVION i Etucnue  :

13  !

Nuclear Regulatory Commission j' Document Control Desk Washington, DC 20555 6 i

ULNRC-2957 .

t

Dear Sir:

l DOCKET NUMBER 50-483  ;

CALLAWAY PLANT UNIT 1 {

FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT ,

JANUARY.1994 h

The enclosed Monthly Operating Report for January,1994 is submitted pursuant to i

section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

(Ap

[d J. D. Blosset Manager, Callaway Plant W !fyn JDB/DEY/J f/ TAM /JpM/crd ,

Enclosure  ;

cc: Distribution attached i

r PDR ADDCK 05000483 1 R PDR i I//

, . --- . .. , . , , - _ . . .~ .. . - - - . . . . . . . - .

. )

1 l

l cc distribution for ULNRC-2957  !

l l

with enclosures l

Mr. M. J. Farber, Chief -

Reactor Projects Section 3C l U.S. Nuc1 car Regulatory Commission l RegionIII 801 Warremille Road  !

3 Lisle, IL 60532-4351 i

Mr. L. R. Wharton (2 copies) l Office of Nuclear Reactor Regulation i U.S. Nuclear Regulatory Commission  ;

I White Flint, North, Mail Stop 13E21  ;

1155 Roclaille,MD 20852 NRC Resident inspector l

Manager, Electric Department Missouri Public Scnice Commission P.O. Box 360  ;

Jefferson City, MO 65102 l 5

i

?

k

'l 1

f i

e -- -

I P

DOCKET NO. 50-483 UNIT NAME CALLAWAY UNIT 1 .

I DATE 21194 i i

COMPLETED BY J B. McInvale  ;

TELEPHONE 314/676-8247 i i

i PART A OPERATIONS

SUMMARY

t The plant operated at approximately 100% power for the month of January with the following exceptions: ;

Power was reduced to 95% from 1-3-94 to 1-8-94 for repair of a steam leak on a second stage MSR inlet ,

valve. .

Power was reduced to 95% briefly for calibration of excore nuclear instruments on 1-13, and 1-20-94. ,

Power was reduced to 93% from 1-28-94 through 1-29-94 for stroke testing turbine control valves and calibration of excore nuclear instruments.

PART B PORV AND SAFETY VALVE

SUMMARY

i Nonc  !

t W

i i

s f

Page1of4 i f

,e--.- -

t 4

PART C I AVERAGE DAILY UNIT POWER LEVEL  ;

'i DOCKET NO 50-483 UNIT Callaway Unit 1 DATE 2-11-94 COMPLETED BY J. B. McInvalc TELEPHONE 314/676-8247 ,

MONTH: JANUARY 1994 l AVERAGE DAILY POWER LEVEL AVERAGE DAILY 10WER LEVEL  :

DAY (MWe-Net) DAY (MWe-Net)  !

1 1166 17 1172 2 1168 18 1173 ,

3 1162 19 1170 l 1

4 1132 20 1141 5 1126 21 1160 6 1123 22 1165  ;

l 7 1126 23 1165 i J

8 1164 24 1163 9 1168 25 1161 10 1166 26 1169 i

11 1169 27 1168 12 1169 28 1159 13 1149 29 1170 14 1172 30 1174 15 1174 31 1175 l 16 1171 Page 2 of 4

, , . . .. -. . . . ~ - - .

. . . ~

i PART D OPERATING DATA REPORT DOCKET NO. 50-483 UNIT NAME CALLAWAY UNIT I DATE 2-11-94 COMPLETED BY L B. McInvale TELEPIIONE 314/676-8247 OPERATING STAR 5 (YTD) (CUM) 1

1. REf0RTING PER]OD JANUARY 1994 GROSS IlOURS IN REPORTING PERIOD; 744

. 744 79,909.5 2 CURRENTLY AUTilORIZ.ED POWER LEVEL (MWt): 3565 MAX. DEPEND, CAPACTIY (MWe-Net): 1115 DESIGN ELECTRICAL RATING (MWe-Net): I171

3. POWER LEVEL TO WillCll RESTRICTED (IF ANY)(MWe-Net):
4. REASONS IOR RESTRICTION (IF ANY):

Tli!S MOgil YR TO DATE CUMUIATIVE

5. NUMllER OF IlOURS REACTOR WAS CRITICAL 744 744.0 69.690.7
6. REACTOR RESERVE SillTFDOWN liOURS 0 0 0
7. IlOURS GENERATOR ON llNE 744 744 68,299.1
8. UNIT RESERVE SiiUlTX)WN !!OURS.... 0 0 0 l

1

9. GROSS Tl!ERMAL ENERGY GENERATED (MWil).., 2,615,603 2,615,603 229,4R0,691
10. GROSS ELECTRICAL ENERGY GENERATED (MWil).~. 901,906 901,906 78,273,029
11. NET ELECTRICAL ENERGY GENERATED (MWil) 863.701 863,701 74.427,752
12. REACTOR SERVICE FACTOR. 100.0 100.0 87.2
13. REACTOR AVAILABi1ITY FACTOR . 100.0 100.0 87.2
14. UNIT SERVICE FACTOR . 100.0 100.0 85.5
15. UNIT AVAILAllIllTY FACTOR 100.0 100.0 85.5
16. UNIT CAPACITY FACTOR (thing MIX'). 103.0 103.0 83.5 i
17. UNIT CAPACITY FACTOR (Using Design MWe)... 98.1 98.I 79.5 18 UNIT ICRCED OLTAGE RATE 0.0 00 2.51
19. S!!lTi1X)WNS SCllEDULED OVER NEXT 6 MONTils (TYPE, DATE, AND DURATION OF EACll):
20. IF SilUr DOWN AT END OF REIVRTING PERIOD, ESTIMA11: DATE OF STARTUP: N/A Page 3 of 4 l

l l

  • ^

1 PART E UNIT Sl!UTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-483 UNIT NAME CAILAWAY UNF 1 DATE 2-11-94 COMPLETED BY J. B. Melrr. ale -

TELEPilONE 314/676-8247 REPORT MONTit: JANUARY 1994 METIIOD OF TYPE SIIUTTING DOWN F: FORCED DURATION Tile REACTOR OR E DATE S:SCIIEDULED (!!OURS) REASON REDUCINO POWER CORRECTIVF/ ACTIONS.' COMMENTS

SUMMARY

REASON METl!OD A: EQUIPMENT FAILURE (EXPIAIN) 1: MANUAL B: MAINT.ORTEST 2: MANUALSCRAM C: REFUE1JNG 3: AUTOMATICSCRAM D:. REGULATORY RESTRICTION 4: OTIIER(EATLAIN)

E: OPERATORTRAINING AND LICENSE ENAMINATION F: ADMINISTRATION 0: OPERATIONALERROR(EXPIAIN) 11; OTilER(EXPLAIN) i t

Page 4 of 4

_ _ _ . _ .___ ______ _ ____ __ _ . _ . . _ _ _ - . _ . . -._ _ .. . _ _. _ .. _ _ . . . _.. ._. .. . . _ ,