PNO-III-82-073, on 820731,unit Shut Down After Tube Leak Rate of 0.17 Gpm Determined in Steam Generator 2.Licensee Estimates Unit Will Be Down for Several Days for Testing & Leak Location Activities

From kanterella
(Redirected from ML20062E753)
Jump to navigation Jump to search
PNO-III-82-073:on 820731,unit Shut Down After Tube Leak Rate of 0.17 Gpm Determined in Steam Generator 2.Licensee Estimates Unit Will Be Down for Several Days for Testing & Leak Location Activities
ML20062E753
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 08/03/1982
From: Hayes D, Streeter J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
PNO-III-82-073, PNO-III-82-73, NUDOCS 8208100317
Download: ML20062E753 (1)


. PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PSO-III 73 Date: Auguy 3,1982 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information is as initially received without veri-

ficction or evaluation, and is basically all that is known by the staff on this date.
Fccility: Indiana & Michigan Electric Licensee Emergency Classification:

D.C. Cook Nuclear Station Notification of Unusual Event Docket No: 50-316 Unit 2 Alert Stevensville, MI 49127 Site Area Emergency General Emergency yyy Not Applicable

Subject:

OUTAGE GREATER THAN 48 HOURS TO REPAIR TUBE LEAK A steam generator tube leak rate of .17 gpm was determined to exist in Steam Generator 2 at about 3:15 a.m. July 31, 1982 while Unit 2 was at 100 percent power.

The licensee had been monitoring a fluxuating leak rate and had planned to shutdown at

.15 gpm as a precautionary measure. The technical specification for steam generator teckage is .347 gpm.

Cold shutdown of Unit 2 was completed at 1:11 a.m. (CDT) on August 1, 1982. The licensee estimates that Unit 2 will be down for several days while testing and leak location activities are in progress .

Resident inspectors are onsite following the licensee's action.

The licensee has issued a press release. Region III (Chicago) will respond to inquiries.

The State of Michigan will be notified.

Rtgion III was notified of this event from the Headquarters Duty Officer at 2:15 a.n. (CDT) on July 31, 1982. This information is current as of 8 a.m. (CDT) August 3,1982. '

Contact:

D. Hayes b

J. Streeter 384-2543 384-2541 F208100317 820803 PDR I&E PNO-III-82-073 PDR DISTRIBUTION:

H. St.j d2 MNBB # 6 3 Phillips_/of 7 E/W // 63 Willste // [ [

~ Chairman Palladino EDO NRR IE NMSS Comm. Gilinsky PA OIA RES

'Comm. Ahearne MPA AEOD Comm. Roberts ELD Air Rights p G ' MAIL:

Com . Asselstine SP INPO // /3 ADM:DMB SECY NSAC_jL/6 DOT: Trans Only ACRS R Regions I // e s , I I /%" IV//O (, V ///f Licensee (Corpor::te Of fice)JL [

.