ML20062A958

From kanterella
Jump to navigation Jump to search
Responds to Re NRC Environ Assessment of Site. Results of Assessment of Changes Since 1977 Fes Issued to Be Published Shortly
ML20062A958
Person / Time
Site: Clinch River
Issue date: 07/21/1982
From: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Hendon B
HOUSE OF REP.
Shared Package
ML20062A963 List:
References
NUDOCS 8208040266
Download: ML20062A958 (3)


Text

__

a '

y m.,

.l ?,

~

fy " t_ ~.

y

.Y q g  %

y 4 any jul, 21 1982 5om"I The Honorable Bill Hendon United States House of Representatives Washington, D.C. 20515

Dear Congressman Hendon:

Thank you for your July 7,1982 letter requesting information on a constituent's behalf concerning NRC's environmental assessment of the Clinch River Breeder Reactor Plant.

There have been a number of changes pertinent to this assessment that have occurred since the Clinch River Breeder Reactor Plant Environmental Statement (HUREG-0139) was issued in February 1977. We have been assessing these changes and their environmental significance from the time licensing activities for the Clinch River Plant were resumed in the fall of 1981. The results of that assessment will be documented in a report which is scheduled to be issued soon.

Sincerely.

(Signed) T. A, Rehm William J. Dircks Executive Director for Operations Distribution EDO 12102 ECase SCavanaugh (ED012102)

EDO Rdg PPAS ED0 DEisenhut SECY 0718 SHanauer CA RMattson

/ Docket File (50-537) HThompson PDR BSnyder LPDR , j'PCpeck WDircks WFoster HDenton Shuttleworth 8208040266 820721, q\ BR Rdg PDR ADOCK 05000 A D OFFICE > .CR ..h NRR NRP CA EDO h

[#;.f R. . . ..lh. WJDi.7cE".'.' '.. ". . ' ..' "'",

sunwem) . . . /. .b.m

- N- . h. .e. c. .k. . . n.t.. t.

.o. .n. . .. .... . . . . ,,,,,

  • > 7/. 4 82. - . . 7./.['p.82 .....

.. 7/.. . /.82

. . .. . . 7/. /82 7/f /82 NRC FORM 318 (10 80) NRCM O240 gy gg{gg g 3 gSogg ,93g_3j9 gj,

N~. + w d x "

FROM: , ACTION CONTROL DATES CONTROL NO I

i Rep. 0111 Dendan ' ""' ' ^ ' ' " '

J/?t/"

lo102 ACKNOWLEDGMENT D ATE Ofi DOCUMENT INT ERIM REPLY 7[7/M TO: PREPARE FOR SIGNATURE OF:

FINAL REPLY l' '

O CHAIRMAN FILE LOCATION d] EXECUTIVE DIRECTOR

><, OTHERt DESCRIPTION g ] LET TER OMEMO O R E PO R T O OTHER SPECI AL INSTRUCTION 5 OA REMARKS Wnts MC to issue a draft uppleont to the FEIS far the CR3R (In@f ry fn Rubin falt)

CLASSIFIED DATA DOCUMENT / COPY T4J. CLASSIF IC A I SON l NUMiiE R OF 1%GES CATEGOHY

>OST AL P E Gist RV No. O NSI C F4 D C F HD $((y Q7)) [

ASSIGNED TO: DATE INFORMATION HOUTING LEG AL REVIEW O FINAL 0 COPY ASSIGNED TO: DATE NO LEG AL OBJECTIONS

- Gertte e r a.. ,r.n 7/12/Ge,- LUnderwood . NOTiFv:

-Check 7/13/32 - Case /Benton 3. Soutpson g cgg ,gy,y,,congt gn

1. PPAS 5. Snyder Ex1.

COMM EN T S,. NOTIF Y

2. Eisenhut "'
3. Hanauer JCAE NOTIFICATION RECOMMENDED: O YES O NO g gg NRC F 4 732 EXECUTIVE DIRECTOR FOR OPERATIONS DO NOT HEMOVE THIS COP PRINCIPAL CORRESPONDENCE CONTROL

u ._ .

m g, ar

[0T18 to,,,n, oe,e NRC SECRETARIAT TO: Commissioner Date Exec. DirJOper. Gen. Counsel O Cong. Liaison O soiicitor Public Affairs Secretary 0 'a*****ar ^udar Policy Evolustion incoming: Rep Bill Hendon From:

yo. _ Hendrie g,,, 7/7/82 subject: wants NRC to issue a draft suppl to the III FEIS --Clinch River Breeder Reactor Prepare reply for signature of:

1 Chairman O Commissioner O E DO, GC, CL, SQ L, PA, SECY, I A, PE O signaiore biock omitted O

Return original of incoming with response hFor direct reply' Suspense: July 23 For appropriate action Rec'd 0ff. EDO O For information ego,,,, , p f .iD A--

Tim e . ,Qj," I.3. .".[' .' .* .*.~**. . ,

Remarks: OCA tnAcle For the Commission: baC

' Send three (3) copies of reply to Secy Correspondence and Records Branch RM e2A ACTION SLIP \

(3-82) 1

, , - . , . , _ . ..m-- _ _

, .. .- ,, , _- - . _ -