ML20054M981

From kanterella
Jump to navigation Jump to search
Ack Receipt of Ltr Urging NRC to Issue Supplemental Des
ML20054M981
Person / Time
Site: Clinch River
Issue date: 06/30/1982
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Varanini E
CALIFORNIA, STATE OF
Shared Package
ML20054G032 List:
References
RTR-NUREG-0139, RTR-NUREG-139 NUDOCS 8207150221
Download: ML20054M981 (2)


Text

.-

*o o.

w o

~,

o r

?;J ~ ') 3 JUN 3 01982 Conmissioner Emilio E. Varanini, III iluclear Fuel Cycle Comittee California Energy Commission 1111 llowe Avenue Sacramento, California 95825

Dear Connissioner Varanini:

Thank you for your recent letter concerning the changes that have occurred since the Clinch River Breeder Reactor Plant Environmental Statement (14UREG-0139) was issued in February 1977.

We have been assessing these and other changes and their environmental significance from the time licensCng activities for the Clinch River Plant were resumed in the fall of 1981. The results of that assessemnt will be documented in a report which is scheduled to be issued soon.

Sincerely, Original sed by H. R. Dente Harold R. Denton, Director Office of Nuclear Reactor Regulation Distribution EDO 12014 S. Hanauer ED0 Reading R. Mattson ED0 H. Thompson

/ Docket File (50-537)

R. Vollmer

~POR ~

B. Snyder LPDR CRBR Reading C. Thomas SECY 82-0633 W. Foster Com. Gilinsky P. Check H. DentF-PPAS D. Eisenhut 8207150221 820630 PDR ADOCK 05000537 D

PDR SS

" ' " >.C. 8 _ NRC,0R. PQ;fjR.Rh P

fiRR #

T ms W

Iter P

k HRDt ton svaa'ur) 6,hh,/bm 8,2,,,

p 82 p,

f,,,,,,

NRCFORM 318110 BOI NRCM O240 OFFICIAL RECORD COPY j " 'as32m.

l i

i I

FROM:

bilioE.Varanini,III ACTION CONTROL DATES

' CONTROL NO.12 014 COMPL DEADLINE 6/30/82 California Energy Commission ACKNOWLEDG MENT 4

d DATE OF DOCUMENT

(

INTERIM REDLY TO:

gggggg PREPARE FOR SIGNATURE Chairman Palladino FINAL REPLY OF:

O CHAIRMAN FitE LOCATION O cxEcuTivE olaECTOn DESCRIPTION g) LETTER OMEMO O REPORT O OTHER SPECIAL INSTRUCTIONS OR REMARKS OTHER:- n 3tg l

i Reg NRC issue a draft supplement to the L

EIS for Clinch River Breeder Reactor &

i circulate for comments

~

r CLASSIFIED DATA i

OOCUMENT/ COPY NO.

l CLASSIFICATION l NUMBER OF PAGES CATEGORY SECY-82-0633 DOSTAL REGISTRY NO.

O NSI O Ro O fro ASSIGNED TO:

DATE INFORMATION ROUTING LEG AL REVIEW D FINAL 0 COPY Denton. NRR 6/2 8 Kerr,/Denton SP ASSIGNED m DATE NO LEG AL OBJECHONS Check 6/2 Case 3.

InompsOn NOTIFY:

1.

PPAS o.

v0iimer O EoO AoMINa CORRES eR l

2.

Eisenhut

/. Snyder c,

gr 3.

Hanauer COMMENTS. NOTIF Y:

[k ext.

g n,g m JCAE NOTIFICATION RECOMMENDED:

O vES O NO j N$C FOR 1232 EXECUTIVE DIRECTOR FOR OPERATIONS PRINCIPAL CORRESPONDENCE CONTROL 00 NOT REMOVE THIS COPY

  • an.

i i

i e