Responds to FOIA Request for Five Categories of Documents Re Crbr.Forwards Documents Listed in Apps A,B & C
ML20055B281
Person / Time
Site: Clinch River
Issue date: 07/12/1982
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Hathaway J
CONGRESS WATCH
Shared Package
ML20049H240 List:
References
FOIA-82-272 NUDOCS 8207210146
Download: ML20055B281 (4)


Text

7.

~s VU)L-O/ b

.f* "'%o,,

UNITED STATES

!\\

'g NUCLEAR REGULATORY COMMISSION

  • ,g 1l W ASHINGTON. D. C. 20555 f

o, '

g July 12, 1982 Ms. Janet Hathaway Congress Watch -

215 Pennsylvania Avenue, S.E.

IN RESPONSE REFER Washington, DC 20003 TO F0IA-82-272

Dear Ms. Hathaway:

This is in partial response to your letter dated June 17, 1982 in which you requested, pursuant to the Freedom of Information Act, five categories of documents regarding the Clinch River Breeder Reactor (CRBR).

Item 1:

NRC staff have advised this office that the documents listed on Appendix A are in the Public Document Room (PDR). The documents listed on Appendix B are being placed in the PDR in this F0IA file.

Item 2:

Since sodium is used as the heat transport nedium in both the primary and intermediate heat transport systems of the CRBR plant, most of the documentation on the CRBR plant is related either directly or indirectly to the use of sodium, e.g., the documents listed on Appendicies A and B.

Item 3:

See document (a) through (d) of Appendix A.

Item 4:

The documents listed on Appendix C are being placed in the PDR.

Item 5:

There have been no other FOIA requests for ir 'armation on the CRBR.

The NRC has not yet completed its review of documents subject to your request. We will respond as soon as the review is completed.

Sin r ly,

/

J

. Fe ton, Director Division of Rules and Records Office of Administration

Enclosures:

Appendicies

-8207210146 820712

%gA{B2-272 F

PDR

\\

s Re: FOIA-82-272 Appendix A

\\

(a) Clinch River Breeder Reactor Plant Preliminary Safety Analysis Report (Docket No. 50-537).

(b) Site Suitability Report by the Office of Nuclear Reactor Regulation, dated March 4, 1977.

(c) Final Environmental Statement by the Office of Nuclear Reactor Regulation, NUREG-0139, dated February 1977.

'T j

(d) Site Suitability Report by the Office of Nuclear Reactor Regulation, NUREG-0786, dated June 1982.

(e)

Letter dated February 26, 1982 from P. S. Check, NRC, to J. R.

Longenecker, DOE (Question CS 220.6).

(f)

Letter dated April 29, 1982 from J. R. Longenecker, DOE, to P. S.

Check, NRC (Response to Question CS 220.6).

(g) Report CRBRP-ARD-0270, CRBRP Project Technical Progress Report,1980.

(h)

Report CRBRP-ARD-0306, CRBRP Project Technical Progress Report,1981.

i l

[

t l

t i

l

Re: F0fA-82-272 i

4 i

Appendix B,

(a) Memorandum dated June' 22,1982 from R.. J. Bosnak to B. M. Morris on questions concerning the CRBR steam generator design.

(b) Letter dated June 8, 1982 from J. R. Longenecker, DOE, to P. S.

Check, NRC.

(c) Note dated June 8,1982 from W. H. Foster to J. Roe, et al.

(d) Note dated June 8,1982 from W. H. Foster to R. Vollmer, et.al.

(e)

Report EPRI NP-1972, "The Achievements, Findings, and Lessons of the Phenix LMFBR Power Plant Experience."

l 4

4 l

t I

l i

i k

Re: F01A-82-272 Appendix C k.

(a) 1/15/82 Feld to Rathbun, Cost Savings Associated with Early Site Preparation Activities - CRBRP.

(b) 1/22/82 Feld to Rathbun, Clinch River Cost of Delay.

(c) 1/27/82 Muller to Check, DOE Draft Supplement to'LHFBR EIS.

(d) 2/19/82 Feld to Rathbun, CRBR Cost of Dealy.

(e) 4/16/82 Feld to Leech, Response to Interrogatories - Set 19.

(f) 5/10/82 Muller to Kulman, Input to CRBR FES (CP).

(g) 5/19/82 Toalston to Bowers, Task Order Under "On Call Assistance for Power Plant Cost Studies".

(h) 5/27/82 Feld to Leech, Proposed Changes to Chapter 2.

(i) 6/10/82 Toalston to Leech, CRBR, Proposed Input to Chapters 9 and 10.

(j) 6/15/82 Bowers to Toalston i

i l

l t

i i