|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217E2691999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Callaway Plant,Unit 1.With ML20212A0201999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Callaway Plant,Unit 1.With ML20210T4451999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Callaway Plant,Unit 1.With ML20209H0881999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Callaway Plant,Unit 1.With ML20195H4831999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Callaway Plant,Unit 1.With ML20206R7111999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Callaway Plant Unit 1.With ML20205S5791999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Callaway Plant Unit 1.With ML20204B6741999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Callaway Plant,Unit 1.With ML20199E7011998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Callaway Plant.With ML20198D9811998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Callaway Plant,Unit 1.With ML20195D3581998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Callaway Plant,Unit 1.With ML20154L4931998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Callaway Plant Unit 1.With ML20151Y5151998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Callaway Plant,Unit 1.With ML20237B8421998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Callaway Plant,Unit 1 ML20236Q9991998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Callaway Plant,Unit 1 ML20249A7681998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Callaway Plant,Unit 1 ML20247G0811998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Callaway Plant Unit 1 ML20216K0531998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Callaway Plant,Unit 1 ML20216G3551998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Callaway Plant, Unit 1 ML20202D4821998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Callaway Plant ML20198J6791997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Callaway Plant,Unit 1 ML20202H5991997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Callaway Plant,Unit 1 ML20199B4061997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Callaway,Unit 1 ML20211M9691997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Callaway Plant,Unit 1 ML20217A4941997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Callway ML20210H8841997-07-31031 July 1997 Monthly Operating Rept for July 1997 for Callaway Plant, Unit 1 ML20149D9001997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Callaway Plant Unit 1 ML20140H0261997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Callaway Plant Unit 1 ML20141B3741997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Callaway Plant,Unit 1 ML20137T2971997-03-31031 March 1997 Monthly Operating Rept for March 1997 for Callaway Plant.W/ ML20135F3471997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Callaway Plant, Unit 1 ML20134M1961997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Callaway Plant Unit 1 ML20133G0211996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Callaway Plant, Unit 1 ML20149M2871996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Callaway Plant Unit 1 ML20134K5761996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Callaway Plant Unit 1 ML20128N2541996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Callaway Plant Unit 1 ML20117K7321996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Callaway Plant Unit 1 ML20116H9691996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Callaway Plant Unit 1 ML20115D2701996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Callaway Plant Unit 1 ML20112J7281996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Callaway Plant Unit 1 ML20111B2831996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Callaway Plant Unit 1 ML20101R0581996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Callaway Plant Unit 1 ML20106G8601996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Callaway Plant,Unit 1 ML20100F7331996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Callaway Plant ULNRC-03312, Monthly Operating Rept for Dec 1995 for Callaway Unit 11995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Callaway Unit 1 ULNRC-03300, Monthly Operating Rept for Nov 1995 for Callaway Plant1995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Callaway Plant ULNRC-03289, Monthly Operating Rept for Oct 1995 for Callaway Plant Unit 11995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Callaway Plant Unit 1 ULNRC-03273, Monthly Operating Rept for Sept 1995 for Callaway Plant Unit 11995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Callaway Plant Unit 1 ULNRC-03266, Monthly Operating Rept for Aug 1995 for Callaway Plant Unit 11995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Callaway Plant Unit 1 ULNRC-03250, Monthly Operating Rept for Jul 1995 for Callaway Plant Unit 11995-07-31031 July 1995 Monthly Operating Rept for Jul 1995 for Callaway Plant Unit 1 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E2691999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Callaway Plant,Unit 1.With ML20212D0711999-09-14014 September 1999 Safety Evaluation Re GL 88-20, Individual Plant Exam for Severe Accident Vulnerabilities ML20212A3361999-09-14014 September 1999 1999 Biennial RERP Exercise, for Callaway Plant. Pages 7,8 & 9 (of 9) in Mini Scenario 1 Section of Incoming Submittal Not Included ML20211N0451999-09-0202 September 1999 Safety Evaluation Concluding That Util Has Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant That Are Susceptible to Pressure Locking & Binding ML20212A0201999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Callaway Plant,Unit 1.With ML20210P0441999-08-10010 August 1999 Safety Evaluation Granting Licensee Requests for Relief (ISI-13 - ISI-18) from Requirements of Section XI of 1989 Edition of ASME B&PV Code,For Second 10-year Interval ISI at Plant,Unit 1 ML20210Q8331999-08-0505 August 1999 Rev 4 to Callaway Cycle 10 Colr ML20210T9481999-08-0303 August 1999 Informs Commission Re Status of Issues Related to Risk Informed Decision Making That Were Raised During Staff Review of License Amend Approving Electrosleeve SG Tube Repair Method for Ue Callaway Plant,Unit 1 ML20216D8791999-07-31031 July 1999 Rev 3 to Callaway Cycle 10 Colr ML20210T4451999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Callaway Plant,Unit 1.With ML20210H6531999-07-30030 July 1999 SER Accepting Relief Request to Second Ten Year Inservice Insp Plant for Plant,Unit 1 ML20209H0881999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Callaway Plant,Unit 1.With ML20195H4831999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Callaway Plant,Unit 1.With ML20206R7111999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Callaway Plant Unit 1.With ML20205Q5561999-04-19019 April 1999 Safety Evaluation Accepting Relief for Request from Certain ASME Section Requirements for Containment Insp ML20205S5791999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Callaway Plant Unit 1.With ML20207A7401999-03-30030 March 1999 Draft, Evaluation of Risk of Induced Steam Generator Tube Rupture, for Callaway Plant ML20205G4071999-03-25025 March 1999 Security Event Rept:On 990304,failure to Properly Compensate for Loss of Safeguards Equipment That Could Have Resulted in Undetected Intrusion Into Protected or Vital Area,Was Discovered.Caused by Msk 325 Failure.Replaced Msk 325 ML20204B6741999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Callaway Plant,Unit 1.With ML20199E7011998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Callaway Plant.With ULNRC-03990, 1998 Annual Rept for Ameren Corp/Union Electric Co. with1998-12-31031 December 1998 1998 Annual Rept for Ameren Corp/Union Electric Co. with ML20198D9811998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Callaway Plant,Unit 1.With ML20195C8341998-11-10010 November 1998 Rev 20 to Operating QA Manual ML20195C8181998-11-0909 November 1998 Rev 19 marked-up Changes to Operating QA Manual ML20195D6931998-10-31031 October 1998 Non-proprietary Rev 3 to Electrosleeving Qualification for PWR Recirculating SG Tube Repair ML20195D3581998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Callaway Plant,Unit 1.With ML20154L4931998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Callaway Plant Unit 1.With ML20151Y5151998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Callaway Plant,Unit 1.With ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20237B8421998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Callaway Plant,Unit 1 ML20155H7381998-06-30030 June 1998 10CFR50.59 Summary Rept for Jan-June 1998. with ML20236Q9991998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Callaway Plant,Unit 1 ML20249C5851998-06-30030 June 1998 Rev 1 to Callaway Cycle 10,COLR ML20248M0501998-06-0808 June 1998 Special Rept 98-02:on 980502,Channel 3 of loose-part Detection Sys Was Declared to Be Inoperable.Caused by Failure of Component Inaccessible at Power.Addl Troubleshooting Will Be Performed ML20249A7681998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Callaway Plant,Unit 1 ML20249B2451998-05-18018 May 1998 Nonproprietary Version of Revised Chapters 4 & 5 to Rev 4 of HI-971769, Licensing Rept for Reracking of Callaway & Wolf Creek Nuclear Plants for Ue & Wcnoc. Chapters 4 & 5 Reflect Editorial Revs ML20248C3681998-05-18018 May 1998 Non-proprietary Version of Rev 4 to HI-971769, Licensing Rept for Reracking of Callaway & Wolf Creek Nuclear Plants ML20247G0811998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Callaway Plant Unit 1 ML20217R2031998-04-27027 April 1998 Cycle 10 Colr ML20216H0651998-04-15015 April 1998 SER Approving Licensee Proposed Alternative to Use Code Case N-508-1 for Rotation of Serviced Snubbers & Prvs for Purpose of Testing in Lieu of ASME B&PV Code,Section Xi,Article IWA-7000 Requirements ML20216K0531998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Callaway Plant,Unit 1 ML20217F3181998-03-24024 March 1998 SER Accepting Relief Request for Approval for Use of Alternate Exam Requirements for Plant Inservice Insp Program ML20216G3551998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Callaway Plant, Unit 1 ML20203M0101998-02-25025 February 1998 Rev 11 to Callaway Cycle 9 Colr ML20203A7951998-02-0909 February 1998 Rev 10 to Callaway Cycle 9 Colr ML20202D4821998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Callaway Plant ML20198S6361998-01-22022 January 1998 Ro:On 980121,determined That Plant Shutdown Would Be Required IAW TS 3.8.1.1,Action D.Caused by 'B' Train EES Charcoal Absorber Being Determined Inoperable.Requested 24 Hour Extension to Allow Restoration of EDG & ESW Train ULNRC-03775, 1997 Annual Rept for Union Electric1997-12-31031 December 1997 1997 Annual Rept for Union Electric ML20198Q0631997-12-31031 December 1997 Rev 9 to Callaway Cycle 9 Colr ML20198J6791997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Callaway Plant,Unit 1 1999-09-30
[Table view] |
Text
-
h]QQ Etucraic
~
July 8,1993 CAway Phn Nuclear Regulatory Commission Document Control Desk Washington,DC 20555 ULNRC-2818
Dear Sir:
DOCKET NUMBER $0-483 CALLAWAY PLANT UNIT I FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT JUNE.1993 The enclosed Monthly Operating Report for June,1993 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
k_
W. R. CampbcIl Manager, Callaway Plant WRC/DEY11AWfAM/ M/ crc Enclosure cc: Distribution attached
/ I
~
9 3 0'7 f 0'O f3 5 9 3 0 6 3 0 '
PDR' ADOCK 05000483 R PDR g
[/
t ,,
j I&vkog A11ress' PO. Box 620 Fttart, MO 65251
I
.. :- i
,_. . ]
,cc distribution for ULNRC-2818 with enclosures Mr. I. N. Jackiw, Cidef Reactor Projects Section 3C U.S. Nuclear Regulatory Commission Region til 799 Roosevelt Road Glen Ellyn,IL 60137 Mr. L. R. Wharton (2 copics)
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 !
1155 Rockville, MD 20852 NRC Resident Inspector Manager, Electric Department Missouri Public Senice Commission P.O. Box 360 Jefferson City,MO 65102 i
s t
~
' .DOCKBT NO, '50-483 UNIT NAME CALLAWAY UNIT I DATE 7-08-93 COMPLETED BY J. B. McInvale TELEPHONE 314/676-8247 PART A OPERATIONS
SUMMARY
The plant operated at approximately 100% power for the entire month with the following exception:
On 6-09-93 load was reduced to 91% to perform repairs on low pressure feedwater heaters. Full power -
operation resumed on 6-10-93.
PART B PORV AND SAFETY VALVE
SUMMARY
Nonc _
b I
Page1of4
~
PART C -
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-483 UNIT Callaway Unit 1 DATE 7-08-93 COMPLETED BY J. B. McInvale TELEPIlONE 314/676-8247 MONTH: JUNE 1993 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Nc0 DAY (MWe-Nc0 1 1155 17 1132 2 1148 18 1134 3 1147 19 1136 4 1155 20 1141 5 1158 21 1135 6 1153 22 1136 7 1132 23 1133 8 1136 24 1134 9 1098 25 1146 10 1080 26 1142 11 1140 27 1134 12 1140 28 1133 13 1135 29 1128 14 1137 30 1105 15 1146 16 1137 Page 2 of 4 m-
. :i PART D
, OPERATING DATA REPORT DOCKET NO. 50-483 UNIT NAME CALLAWAY UNIT 1 DATE 7-08-93 COMPLETED BY J. B. McIm ale TELEPIIONE 314/676-8247 -
OPERATING STA1US OTD) (CUM)
- 1. REPORTING PERIOD. JUNE 1993 OROSS IlOURS IN REPORTING PERIOD: 720. 4343 74,748.5 2 CURRENTLY AtJFl!ORIZED POWER LFvrL (MWt): 3565 M AX. DEPEND. CAPACITY (MWe-Net): 1120 DESIGN ELECTRICAL RATING (MWe-Net): 11?!
- 3. POWER LEVEL TO WIIICII RESTRICTED (IF ANYs (MWe-Net):
- 4. REASONS FOR RFSTRICTION (IF ANY):
Tills MONTil YR TO DATE CUMULATIVE
- 5. NUMBER OF llOURS REACTOR WAS CRITICAL 720.0 4,343.0 65,720.7
- 6. REACTOR RESERVE SlitTFDOWN llOURS 0 0 0
- 7. IIOURS GENERATOR ON llNE 720.0 4,343.0 64,398.7 8 UNIT RESERVE S1RTFDOWN IIOURS.... . - . - 0 0 0
- 9. OROSS TIIERMAL ENEROY OENERATED (MWII)... 2,$30,244 15,130,446 216,210,396
- 10. OROSS ELECTRICAL ENEROY OENERATED (MWil).. 857,276 5,208,029 73,769,92$
II. NET ELECTRICAL ENEROY OENERATED (MWII) 817,544 4,971,658 70,145,756
- 12. > ACTOR SERVICE FACTOR.
. 100.0 100.0 87.9
- 13. REA )R AVAILABILITY FACTOR. 100.0 100.0 87.9
- 14. UNIT SERVICE FACTOR .-- 100.0 100.0 86.2 ,
I $. UNIT AVAILABILITY FACTOR - 100.0 100.0 86.2
- 16. UNIT CAPACITY FACTOR (Using MDC).- 101.4 102.2 83.8
- 17. UNIT CAPACITY FAC10R (Uning Design MWe). 97.0 97.8 80.1 18 UNIT FORCED OLTFAGE RATE _ 0.0 0.0 2.7
- 19. SlILTFDOWNS SCllEDULED OVER NEXT 6 MONTilS (TYPE, DATE, AND DURATION OF EACil): Refueling; Date: 10/01/93 Duration: 56 days
- 20. IF SIIUT DOWN AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP:
Page 3 of 4
~,.4
' 'L . .
PART E UNIT SIIU1 DOWNS AND PO%TR REDUCTIONS DOCKET NO. 50-483 UNIT NAME CAtlAWAY UNTT 1 DATE 7.08-93 COMPLETED BY 1 B. McInvale 1T1EPIIONE 314'67 4 247 -
REPORT MONTH: JUNE 1993 METIIOD OF TYPE SIRTI'11NG DOWN F: FORCED DURATION TIIE REACTOR OR lia DATE- 5: SCIIEDULED (FLOURS) REASON REDUCING POWER CORRECITVF/ACrlONSTOMMENTS
SUMMARY
I REASON MET 110D j' A EQUIPMENTFAILURE(EXPIAIN) 1: MANUAL i
B: MAINT,OR1EST 2: MANUAL SCRAM
- j. C: REFUELING 3: AUTOMATICSCRAM D- REGULATORY RESTRICTION 4: 011IER(EXPLAIN)
E: OPERATORTRAINING AND
, LICENSE EXAMINATION I
F: ADMINISTRATION 0: OPERATIONALERROR(EXPIAIN)
II: OTHER(EXPLAIN)
I t
Page 4 of 4 '
___..m_ _-. _ - - . . - _ - s ,... . .;_.. . . . . . ~ . . . . . . - - .L, . . J .-