Category:CORRESPONDENCE-LETTERS
MONTHYEARML20205L1831986-03-13013 March 1986 Comments on Proposed Rule 10CFR9.Rule Opposed Due to Opinion That Broad New Class of Secret Sessions or Meetings W/O Transcripts Will Be Created ML20151R5611986-01-30030 January 1986 Summarizes 851216 Mgt Meeting at Oak Ridge Operations Ofc to Review & Inspect Redress & Reclamation of Crbr Site.Drawings Reviewed,Discussions Held & Tour of Site Performed.Site Restoration Concluded to Be as Described in Plans & Specs ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20128B2801985-06-27027 June 1985 Updates DOE .Bids for Redress of Crbr Site Opened on 850604.Contract Awarded to Beaver Excavating Co,Canton, Oh,On 850613.Contractor Scheduled to Complete Site Redress on or Before 851216 ML20133C7371985-06-14014 June 1985 Further Response to FOIA Request for Documents Re Site Redress Where Plant Const Begun,Including Clinch River Facility & NRC Legal Analysis Re Redress.Forwards App B Documents.App C Document Withheld (Ref FOIA Exemption 5) ML20128R0001985-06-0606 June 1985 Partial Response to FOIA Request for Records Re Desirability of Voluntary or Required Redress of Nuclear Plant Sites Where Work Undertaken But Const No Longer Contemplated. Forwards Documents Listed in App a ML20133C6881985-05-0808 May 1985 FOIA Request for Documents Re Redress of Sites Where Nuclear Plant Const Begun & NRC Legal Analysis of Need for Site Redress W/ or W/O Current CP & LWA ML20107M8141984-11-0707 November 1984 Clarifies & Reaffirms Util Commitments Re Redress of Site in Accordance W/Util 840305 Final Site Redress Plan & NRC 840606 Approval of Plan ML20107H8031984-11-0606 November 1984 Reaffirms Commitments to Redress Site in Accordance W/ 840305 Final Site Redress Plan & NRC 840606 Approval Ltr. Related Correspondence ML20140C6121984-06-18018 June 1984 Advises That Time for Commission to Review ALAB-761 Expired. Commission Declined Review.Decision Became Final Agency Action on 840611.Served on 840618 ML20087B4361984-03-0808 March 1984 Confirms That ASLB Intends to Vacate Notice of 840314 Conference & Reschedule Later Date Due to Delay in Funding for Review of Redress Plan & Possible Lack of Availability of One ASLB Member.Certificate of Svc Encl ML20086T4631984-03-0505 March 1984 Forwards Site Redress Plan. Minor Clarifications & Corrections to Draft Plan Submitted 840227 Made in Response to NRC Comments ML20087A4141984-03-0202 March 1984 Forwards Page 15 Inadvertently Omitted from 840227 Transmittal of Draft Crbr Plant Redress Plan.Related Correspondence ML20080T9331984-03-0101 March 1984 Forwards Page 15 of Crbr Program Redress Plan,Inadvertently Omitted from 840227 Transmittal.Certificate of Svc Encl ML20128R0161984-02-29029 February 1984 Expresses Thanks for 840222 Review of Site Redress Planning. Concurs W/Conceptual Approach & 1-yr Period for Development of Final Site Redress Plan & Investigation of Potential Use of Site.Ml Lacy Encl ML20080S6661984-02-27027 February 1984 Forwards Draft Site Redress Plan,In Response to N Grace 831208 Request.Plan Will Be Finalized for Submission on 840302,following Receipt of Comments ML20079F9411984-01-13013 January 1984 Informs of Receipt & Storage,Through S&W Engineering,Of Spent Fuel Transfer Port Assembly Large Shield Plug.Due to Failure of Congress to Appropriate Addl Funding,Doe No Longer Seeking CP & Is Closing All Licensing Activities ML20083G3551984-01-10010 January 1984 Advises That Svc of DOE & Project Mgt Corp 831227 Notification Re Project Termination Affected Again on All Parties on Attached Svc List ML20083H2331983-11-15015 November 1983 Summarizes Current Status of SER Open Items Re Structural Response During Faulted Conditions & Beyond Dbas.Program Lacks Planned Analytical Support.Models to Support Experimental Efforts Should Be Developed ML20081B9721983-10-24024 October 1983 Summarizes 831004 Meeting W/Nrc,Acrs & Lnr Assoc Re Mgt of Crbr PRA Program.Viewgraphs & List of Meeting Attendees Encl ML20078A7571983-09-0707 September 1983 Forwards Evaluation Repts of Faults 1,2 & 3 Discovered on Site During Foundation Excavation.Faults Not Capable within Meaning of App a to 10CFR100.W/seven Photographs ML20076A8171983-08-17017 August 1983 Confirms Redirection for Shipping Applicant Voluminous Exhibits.Certificate of Svc Encl ML20076A7761983-08-17017 August 1983 Advises That Author Will Present Oral Argument on Behalf of Applicants & Forwards Motion Requesting Argument Be Rescheduled for 830928 ML20077J0781983-08-11011 August 1983 Forwards Pages from Transcript of Crbr CP 830810 Hearings Per ASLB Direction.Certificate of Svc Encl ML20081A5601983-08-11011 August 1983 Summarizes 830808 Informal Meeting on Contract Re PRA Review of Crbr (Task 4) & NRC Concerns Associated W/Technology for Energy Corp Deliverables Schedule ML20076H8811983-08-0909 August 1983 Expresses Appreciation for NRC Presentation on 10CFR21 & 10CFR50.55(e) Requirements.Info Should Be Most Useful to Personnel Involved in Project in Following Requirements ML20024E0391983-08-0505 August 1983 Forwards Errata Sheets for Applicant Prepared Testimony. Certificate of Svc Encl.Related Correspondence ML20077D1321983-07-25025 July 1983 Advises of Omission in Applicant 830722 Response Re CP Evidentiary Hearings.Hearings Did Not Commence on 830718 But Were Postponed Per 830713 Order.Order of 830719 Rescheduled Hearings for 830808-12.Certificate of Svc Encl ML20024D0291983-07-22022 July 1983 Forwards Clinch River Breeder Reactor Plant Sys Design Description - Nuclear Island HVAC Sys, as Example of Procedure Outlines Available for Performance of PRA ML20080A8311983-07-20020 July 1983 Opposes Plant Const Since Little Prior Experience Exists W/Breeder Reactor Design ML20024D5121983-07-19019 July 1983 Requests Specs for Electrical Power Cable Insulation to Be Used at Facility ML20077A5331983-07-19019 July 1983 Advises of Incorrectly Cited Ref on Page 1 of Attachment B & on Page 2 of Attachment C to .Certificate of Svc Encl ML20077H1911983-07-19019 July 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-537/83-05.Corrective actions:Westinghouse-Oak Ridge Audit Program Revised to Be Computerized Sys.Implementation Throughout Yr Will Be Measured by Planned Surveillances ML20072P1101983-07-15015 July 1983 Forwards Applicant Proposed Exhibit List for CP Hearings,For Review.Stipulation as to Authenticity & Admissibility Requested.Certificate of Svc Encl ML20024C1621983-07-0808 July 1983 Informs That Auxiliary Feedwater Sys Evaluation,Per PSAR App C,Section C.6.4 & App H,Section II.E.1.1,scheduled for Completion by mid-1985 ML20085A7291983-07-0606 July 1983 Forwards Rev 6 to Vol 2 to CRBRP-3, Assessment of Thermal Margin Beyond Design Base (Tmbdb) ML20105B9551983-07-0606 July 1983 Forwards Addl Info Per Request at 830610 Meeting on Programmatic Objectives Re Fuel Burnup.Fftf Operates W/Peak Burnup of Over 61,000 Megawatt Day/Mt.Burnup Occurred Under Temp & Power Conditions Similar to Crbr Conditions ML20079R7401983-06-23023 June 1983 Summarizes 830606 Meeting W/Crbr Project Personnel Re Schedule for Resolution of Confirmatory Items.All Identified Items & Preliminary Schedule Info Discussed.List of Attendees Encl ML20079R2661983-06-21021 June 1983 Lists Typographical & Transcription Errors in 830512 Deposition.Certificate of Svc Encl ML20024A6781983-06-20020 June 1983 Informs of Planned Optional Use of Mechanical Couplers for Reinforcing Bar Splice Sys in Nuclear Island Mat.Qa Program Will Be Established.Exception to ASME Code,Section III & Reg Guide 1.136 Requirements Encl ML20076J0951983-06-17017 June 1983 Summarizes Programmatic Objectives 830610 Meeting Re Fallbacks Identified in Chapter 4 of SER & Impact on Crbr Project.Viewgraphs & Supporting Documentation Encl ML20076J0511983-06-16016 June 1983 Advises That DOE Addressees Include Tj Garrish,L Silverstrom & Wd Luck.Rt Johnson & WE Bergholz Should Be Deleted from Svc List.Certificate of Svc Encl ML20023D9611983-05-27027 May 1983 Submits Agreements Reached at 830524 Meeting W/Crbr Project Re Pra.Description of Addl Tasks Needed to Integrate Plan I & II Efforts Encl ML20072B3431983-05-27027 May 1983 Forwards Crbr Erosion & Sediment Control Plan Rept, Providing Implementation Status of Control Plan Measures Currently Utilized ML20023D4031983-05-20020 May 1983 Forwards Amend 77 to PSAR ML20076D3151983-05-19019 May 1983 Forwards Rev 1 to Crbr Project Heat Transport Sys In-Containment Piping Reserve Seismic Margins & Rept Re Consequences of Leaks from Small Diameter Primary Heat Transport Sys Piping ML20076D2281983-05-17017 May 1983 Forwards Rev 5 to Vol 2 to Thermal Margin Beyond Design Base. Rev Incorporates Isotopic Inventory for Heterogeneous Core,Current Meteorology,Addl Organ Doses & More Realistic Pu Sparging Calculations ML20023C5821983-05-16016 May 1983 Submits Supplemental Info to 830401 Ltr Re Cable Separation by Confirming That Approx 75 Ft of DHR Svc & Steam Generator Auxiliary Heat Removal Sys Cable Will Be Run in Separate Conduits or Encl Raceways ML20079Q2881983-05-10010 May 1983 Forwards Corrected 830509 Response to NRDC & Sierra Club First Set of Interrogatories & Request to Produce Directed to Applicant.Original Document Not Identified as Response ML20024D9551983-05-0909 May 1983 Submits Estimate of LMFBR Safety & Licensing Review Needs Over Next Several Yrs.Preparation of Portions of FSAR Will Begin in 1984 1986-03-13
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20205L1831986-03-13013 March 1986 Comments on Proposed Rule 10CFR9.Rule Opposed Due to Opinion That Broad New Class of Secret Sessions or Meetings W/O Transcripts Will Be Created ML20128B2801985-06-27027 June 1985 Updates DOE .Bids for Redress of Crbr Site Opened on 850604.Contract Awarded to Beaver Excavating Co,Canton, Oh,On 850613.Contractor Scheduled to Complete Site Redress on or Before 851216 ML20133C6881985-05-0808 May 1985 FOIA Request for Documents Re Redress of Sites Where Nuclear Plant Const Begun & NRC Legal Analysis of Need for Site Redress W/ or W/O Current CP & LWA ML20107M8141984-11-0707 November 1984 Clarifies & Reaffirms Util Commitments Re Redress of Site in Accordance W/Util 840305 Final Site Redress Plan & NRC 840606 Approval of Plan ML20107H8031984-11-0606 November 1984 Reaffirms Commitments to Redress Site in Accordance W/ 840305 Final Site Redress Plan & NRC 840606 Approval Ltr. Related Correspondence ML20087B4361984-03-0808 March 1984 Confirms That ASLB Intends to Vacate Notice of 840314 Conference & Reschedule Later Date Due to Delay in Funding for Review of Redress Plan & Possible Lack of Availability of One ASLB Member.Certificate of Svc Encl ML20086T4631984-03-0505 March 1984 Forwards Site Redress Plan. Minor Clarifications & Corrections to Draft Plan Submitted 840227 Made in Response to NRC Comments ML20087A4141984-03-0202 March 1984 Forwards Page 15 Inadvertently Omitted from 840227 Transmittal of Draft Crbr Plant Redress Plan.Related Correspondence ML20080T9331984-03-0101 March 1984 Forwards Page 15 of Crbr Program Redress Plan,Inadvertently Omitted from 840227 Transmittal.Certificate of Svc Encl ML20080S6661984-02-27027 February 1984 Forwards Draft Site Redress Plan,In Response to N Grace 831208 Request.Plan Will Be Finalized for Submission on 840302,following Receipt of Comments ML20079F9411984-01-13013 January 1984 Informs of Receipt & Storage,Through S&W Engineering,Of Spent Fuel Transfer Port Assembly Large Shield Plug.Due to Failure of Congress to Appropriate Addl Funding,Doe No Longer Seeking CP & Is Closing All Licensing Activities ML20083G3551984-01-10010 January 1984 Advises That Svc of DOE & Project Mgt Corp 831227 Notification Re Project Termination Affected Again on All Parties on Attached Svc List ML20083H2331983-11-15015 November 1983 Summarizes Current Status of SER Open Items Re Structural Response During Faulted Conditions & Beyond Dbas.Program Lacks Planned Analytical Support.Models to Support Experimental Efforts Should Be Developed ML20081B9721983-10-24024 October 1983 Summarizes 831004 Meeting W/Nrc,Acrs & Lnr Assoc Re Mgt of Crbr PRA Program.Viewgraphs & List of Meeting Attendees Encl ML20078A7571983-09-0707 September 1983 Forwards Evaluation Repts of Faults 1,2 & 3 Discovered on Site During Foundation Excavation.Faults Not Capable within Meaning of App a to 10CFR100.W/seven Photographs ML20076A8171983-08-17017 August 1983 Confirms Redirection for Shipping Applicant Voluminous Exhibits.Certificate of Svc Encl ML20076A7761983-08-17017 August 1983 Advises That Author Will Present Oral Argument on Behalf of Applicants & Forwards Motion Requesting Argument Be Rescheduled for 830928 ML20081A5601983-08-11011 August 1983 Summarizes 830808 Informal Meeting on Contract Re PRA Review of Crbr (Task 4) & NRC Concerns Associated W/Technology for Energy Corp Deliverables Schedule ML20077J0781983-08-11011 August 1983 Forwards Pages from Transcript of Crbr CP 830810 Hearings Per ASLB Direction.Certificate of Svc Encl ML20076H8811983-08-0909 August 1983 Expresses Appreciation for NRC Presentation on 10CFR21 & 10CFR50.55(e) Requirements.Info Should Be Most Useful to Personnel Involved in Project in Following Requirements ML20024E0391983-08-0505 August 1983 Forwards Errata Sheets for Applicant Prepared Testimony. Certificate of Svc Encl.Related Correspondence ML20077D1321983-07-25025 July 1983 Advises of Omission in Applicant 830722 Response Re CP Evidentiary Hearings.Hearings Did Not Commence on 830718 But Were Postponed Per 830713 Order.Order of 830719 Rescheduled Hearings for 830808-12.Certificate of Svc Encl ML20024D0291983-07-22022 July 1983 Forwards Clinch River Breeder Reactor Plant Sys Design Description - Nuclear Island HVAC Sys, as Example of Procedure Outlines Available for Performance of PRA ML20080A8311983-07-20020 July 1983 Opposes Plant Const Since Little Prior Experience Exists W/Breeder Reactor Design ML20024D5121983-07-19019 July 1983 Requests Specs for Electrical Power Cable Insulation to Be Used at Facility ML20077H1911983-07-19019 July 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-537/83-05.Corrective actions:Westinghouse-Oak Ridge Audit Program Revised to Be Computerized Sys.Implementation Throughout Yr Will Be Measured by Planned Surveillances ML20077A5331983-07-19019 July 1983 Advises of Incorrectly Cited Ref on Page 1 of Attachment B & on Page 2 of Attachment C to .Certificate of Svc Encl ML20072P1101983-07-15015 July 1983 Forwards Applicant Proposed Exhibit List for CP Hearings,For Review.Stipulation as to Authenticity & Admissibility Requested.Certificate of Svc Encl ML20024C1621983-07-0808 July 1983 Informs That Auxiliary Feedwater Sys Evaluation,Per PSAR App C,Section C.6.4 & App H,Section II.E.1.1,scheduled for Completion by mid-1985 ML20085A7291983-07-0606 July 1983 Forwards Rev 6 to Vol 2 to CRBRP-3, Assessment of Thermal Margin Beyond Design Base (Tmbdb) ML20105B9551983-07-0606 July 1983 Forwards Addl Info Per Request at 830610 Meeting on Programmatic Objectives Re Fuel Burnup.Fftf Operates W/Peak Burnup of Over 61,000 Megawatt Day/Mt.Burnup Occurred Under Temp & Power Conditions Similar to Crbr Conditions ML20079R7401983-06-23023 June 1983 Summarizes 830606 Meeting W/Crbr Project Personnel Re Schedule for Resolution of Confirmatory Items.All Identified Items & Preliminary Schedule Info Discussed.List of Attendees Encl ML20079R2661983-06-21021 June 1983 Lists Typographical & Transcription Errors in 830512 Deposition.Certificate of Svc Encl ML20024A6781983-06-20020 June 1983 Informs of Planned Optional Use of Mechanical Couplers for Reinforcing Bar Splice Sys in Nuclear Island Mat.Qa Program Will Be Established.Exception to ASME Code,Section III & Reg Guide 1.136 Requirements Encl ML20076J0951983-06-17017 June 1983 Summarizes Programmatic Objectives 830610 Meeting Re Fallbacks Identified in Chapter 4 of SER & Impact on Crbr Project.Viewgraphs & Supporting Documentation Encl ML20076J0511983-06-16016 June 1983 Advises That DOE Addressees Include Tj Garrish,L Silverstrom & Wd Luck.Rt Johnson & WE Bergholz Should Be Deleted from Svc List.Certificate of Svc Encl ML20023D9611983-05-27027 May 1983 Submits Agreements Reached at 830524 Meeting W/Crbr Project Re Pra.Description of Addl Tasks Needed to Integrate Plan I & II Efforts Encl ML20072B3431983-05-27027 May 1983 Forwards Crbr Erosion & Sediment Control Plan Rept, Providing Implementation Status of Control Plan Measures Currently Utilized ML20023D4031983-05-20020 May 1983 Forwards Amend 77 to PSAR ML20076D3151983-05-19019 May 1983 Forwards Rev 1 to Crbr Project Heat Transport Sys In-Containment Piping Reserve Seismic Margins & Rept Re Consequences of Leaks from Small Diameter Primary Heat Transport Sys Piping ML20076D2281983-05-17017 May 1983 Forwards Rev 5 to Vol 2 to Thermal Margin Beyond Design Base. Rev Incorporates Isotopic Inventory for Heterogeneous Core,Current Meteorology,Addl Organ Doses & More Realistic Pu Sparging Calculations ML20023C5821983-05-16016 May 1983 Submits Supplemental Info to 830401 Ltr Re Cable Separation by Confirming That Approx 75 Ft of DHR Svc & Steam Generator Auxiliary Heat Removal Sys Cable Will Be Run in Separate Conduits or Encl Raceways ML20079Q2881983-05-10010 May 1983 Forwards Corrected 830509 Response to NRDC & Sierra Club First Set of Interrogatories & Request to Produce Directed to Applicant.Original Document Not Identified as Response ML20024D9551983-05-0909 May 1983 Submits Estimate of LMFBR Safety & Licensing Review Needs Over Next Several Yrs.Preparation of Portions of FSAR Will Begin in 1984 ML20073S2761983-05-0505 May 1983 Forwards Revised Responses to SER Item 6 Re Qa,Including Info to Complete Identification of safety-related Structures,Sys & Components Controlled by Crbr QA Program for PSAR.Marked-up Tech Specs Encl ML20073Q3491983-04-28028 April 1983 Forwards Revised Response to SER Item 6, Qa. Response Provides Addl Info Re Identification of safety-related Structures,Sys & Components Controlled by QA Program ML20073R2221983-04-27027 April 1983 Requests to Make Limited Appearance Statement at 830718 CP Hearings Re Regional Socioeconomic Impacts ML20069L1801983-04-27027 April 1983 Informs That Evaluation of Seismic Adequacy of Primary Heat Transport Sys Branch Line & Consequences of Line Failure Being Conducted,In Response to ACRS 830419 Request.Results Will Be Forwarded by 830517 ML20073K3441983-04-18018 April 1983 Forwards Static Tests of 1/20-Scale Models of Crbr Head in Support on LMFBR Safety Program ML20071G2761983-04-18018 April 1983 Recommends That Commission Retain Technical Cadre of Experts to Review Crbr & Overall DOE Breeder Program 1986-03-13
[Table view] Category:LEGAL/LAW FIRM TO NRC
MONTHYEARML20087B4361984-03-0808 March 1984 Confirms That ASLB Intends to Vacate Notice of 840314 Conference & Reschedule Later Date Due to Delay in Funding for Review of Redress Plan & Possible Lack of Availability of One ASLB Member.Certificate of Svc Encl ML20080T9331984-03-0101 March 1984 Forwards Page 15 of Crbr Program Redress Plan,Inadvertently Omitted from 840227 Transmittal.Certificate of Svc Encl ML20083G3551984-01-10010 January 1984 Advises That Svc of DOE & Project Mgt Corp 831227 Notification Re Project Termination Affected Again on All Parties on Attached Svc List ML20076A7761983-08-17017 August 1983 Advises That Author Will Present Oral Argument on Behalf of Applicants & Forwards Motion Requesting Argument Be Rescheduled for 830928 ML20076A8171983-08-17017 August 1983 Confirms Redirection for Shipping Applicant Voluminous Exhibits.Certificate of Svc Encl ML20077J0781983-08-11011 August 1983 Forwards Pages from Transcript of Crbr CP 830810 Hearings Per ASLB Direction.Certificate of Svc Encl ML20024E0391983-08-0505 August 1983 Forwards Errata Sheets for Applicant Prepared Testimony. Certificate of Svc Encl.Related Correspondence ML20077D1321983-07-25025 July 1983 Advises of Omission in Applicant 830722 Response Re CP Evidentiary Hearings.Hearings Did Not Commence on 830718 But Were Postponed Per 830713 Order.Order of 830719 Rescheduled Hearings for 830808-12.Certificate of Svc Encl ML20077A5331983-07-19019 July 1983 Advises of Incorrectly Cited Ref on Page 1 of Attachment B & on Page 2 of Attachment C to .Certificate of Svc Encl ML20072P1101983-07-15015 July 1983 Forwards Applicant Proposed Exhibit List for CP Hearings,For Review.Stipulation as to Authenticity & Admissibility Requested.Certificate of Svc Encl ML20079Q2881983-05-10010 May 1983 Forwards Corrected 830509 Response to NRDC & Sierra Club First Set of Interrogatories & Request to Produce Directed to Applicant.Original Document Not Identified as Response ML20073B8031983-04-11011 April 1983 Forwards Applicant Ninth Set of Interrogatories Inadvertently Omitted from Matls Filed on 830408 ML20077A0561983-03-21021 March 1983 Appeals Denial of FOIA Request for Transcript of Commission 830105 Meeting Re Exemption Request for Crbr Transcript ML20072F6971983-03-0202 March 1983 Forwards Draft Statement of Scope & Schedule for Forthcoming CP Hearings & Requests Telcon to Discuss Schedule. Certificate of Svc Encl ML20072F0501983-01-25025 January 1983 FOIA Request for Transcript of Commission 830105 Meeting to Consider Exemption Request Per 10CFR50.12 for Crbr ML20070L4761982-12-30030 December 1982 Challenges Statement in Applicant 821228 Reply,That Congress,In Enacting Continuing Resolution for FY83,intended Site Preparation Activities to Continue.Svc List Encl ML20023B3241982-12-23023 December 1982 Advises That Conference Rept on Continuing Resolution for FY83, Published in 821220 Congressional Record.Language Cited in NRDC & Sierra Club 821221 Brief Appears on Page H10636 ML20064K7021982-11-0505 November 1982 Appeals Denial of FOIA Request for Repts,Memoranda or Other Work Performed by Science Applications,Inc for Crbr Project ML20028F7451982-10-29029 October 1982 FOIA Request for Documents Sent W/Wood Blocks from Site ML20070R4341982-10-27027 October 1982 FOIA Request for NRC Correspondence W/White House & Congress Re Crbr Since Jan 1981 ML20065D3491982-09-15015 September 1982 Requests Addl Time to Comment on Draft Suppl to 1977 Fes ML20064M4051982-09-10010 September 1982 FOIA Request for Crac & Crac 2 Analyses for Facilities ML20065B2001982-09-0909 September 1982 Requests Addl Time to Comment on Draft Suppl to Fes (NUREG- 0139,Suppl 1).Total Cost of Emergency Preparedness Not Factored in Results.No Discussion Disclosed Consequences of Potential Radiological Exposure to Biota Due to Accident ML20058G5661982-08-0202 August 1982 Informs That Davis-Besse Case Provides No Authority for Proceeding Today W/Project in Preconst Stage ML20063D6261982-07-26026 July 1982 FOIA Request for Input to Chapter 7 & App J of Fes & Suppl to Crbr ML20063D6241982-07-26026 July 1982 FOIA Request for Documents by Science Applications,Inc for Crbr Project Including Fes,Site Suitability Rept & SER ML20063D6081982-07-22022 July 1982 FOIA Requet for Comments/Documents by NRC Staff or Contractors on Fes & Recently Issued Suppl for Crbr ML20054L9271982-07-0808 July 1982 Requests than No Procedural Decisions Be Made at 820708 Affirmation Session Pending Response from Intervenors Re Relevant Threshold Issues.Filing Will Be Submitted by 820709 ML20064L4691982-06-28028 June 1982 FOIA Request for NMSS Comments Re EIS for Facility ML20055A9011982-06-10010 June 1982 Informs of Changes That Have Occurred Since Initial Issuance of Fes for Crbr.New Updated Environ Statement Requested ML20055A8661982-06-0808 June 1982 Urges Creation of Suppl to Fes for Crbr Due to Design & Regulatory Changes Since 1977 Fes Issued ML20055A8951982-06-0808 June 1982 Urges Issuance of Suppl to Crbr Fes.Fes Requires Updating Due to Recent Changes in Design & Regulations ML20040F0161982-02-0101 February 1982 Forwards C Komanoff 820128 Signed Original Supplemental Statement ML20040D5791982-01-28028 January 1982 Forwards NRDC & Sierra Club Supplemental Comments Opposing Applicants' Exemption & C Komanoff Statement.Original Statement to Be Filed Later ML20040C7281982-01-22022 January 1982 Forwards C Komanoff & Ee Clebsch Signed Statements as Stated in 820118 Ltr.W/O Encl ML20039F7391982-01-11011 January 1982 Forwards Relevant Pages of Ref 2-4 of Applicant Site Preparation Activities Rept,In Response to Commission 811224 Order.Certificate of Svc Encl ML20039A7471981-12-17017 December 1981 Clarifies Issue Raised at Commission 811216 Meeting. Intervenors Do Not Object to Applicant'S Proposed Timetable But Also Would Not Object to Compression of Timetable by Number of Wks ML20062M5631981-12-15015 December 1981 Forwards Applicants' Proposed Schedule for Review of Section 50.12 Request.Certificate of Svc Encl ML20010G1111981-09-0404 September 1981 Requests That ASLB Direct DOE to Inform Parties of DOE View of Current Status of Proceeding & Steps DOE Will Take to Reopen Licensing Hearings,To Serve All Communications W/ NRC on All Parties & to Provide Advance Notice of Meetings 1984-03-08
[Table view] |
Text
7..... .. g s ,
'l
'p i , I TUTTLE & TAY L O R --
j ATTO R N EY S AT LAW 890 6 L STRE ET, N.W.. S ulTC 805 WASHINGTON, D.C. 20036 * .-5. A7 G3 TcLCPHONE:(202) 861-0666 TcLtcopicas t2o2) 7e5-28e5 , LOC ANGELES OFFICE y _
_ ;p609 SOUTH GRAND AVENUE
{,(*, , L ( _a a,LO,5. A N G E LES, CALIFOR NI A 90017 O N" M
~
(213)683-0600 February 1, 1982 A
~P
\*
. EUCElygg 2
- . 2 PER -
Secretary, Office of the Secretary t
- nom,@5taa gy g. 198 U.S. Nuclear Regulatory Commission ' N 8 20545 1 Washington, D.C. s, Clinch River Breeder Reactor. Plant Docket No.-50-537
Dear Sir:
As stated in my letter of January 28, 1982, I am enclosing herewith for filing the signed original of Charles Komanoff's supplemental statement in the above-captioned proceeding.
Sincerely, TUTTLE & TAYLOR By Eldon V. C. Greenberg EVCG:ejg i Enclosur.e s
l
~
8202090209 820201 "I -
PDR ADOCK 05000537 G YDR :
..w
[&
a DOCKET NO. 50-537 SUPPLEMENTAL STATEMENT OF CHARLES KOMANOFF PRESENTED TO THE NUCLEAR REGULATORYjCOMMISSION ON JANUARY 28, 1982 GCCt.; c : .",#
IN OPPOSITION TO APPLICANTS' EXEMPTION REQDEST UNDER 10 CFR 550.12 Applicants' answers to Questions 9(a) and (b) provide the source and basis of Applicants' estimate of a cost i~. of $10-20 million per month of delay in commencement of site preparation activities. However, examination of the three sources of delay costs raised by Applicants confirms the conclusion in my January 18 comments that the net costs of delay are, at most, extremely small relative to Applicants' estimate and may, in fact, be negative.
(1) Costs of Unavoidable Management Activities:
Applicants state that the cost of maintaining the various management groups for an additional 1-2 year period is $42.3 million per year. Applicants have not demonstrated the point but have only asserted it. Applicants' support for this figure consists merely of (i) assertions that, due to long i
lead times in re-hiring or to the essential nature of management functions even during project delays, project management staff must be maintained essentially at present levels; and (ii) calculation of the current costs in salary and overhead of maintaining project management staff. No demonstration is provided of the impracticality of r? n ? B 7 O_O Fy C
w
.h
- re-assigning staff to non-CRBRP work during delay periods, even though such an assumption implicitly underlies Applicants' response.
Moreover, examination of Applicants' response turns up several other assumptions suggesting that the estimate of management costs is overstated.
First, some of the job positions included in Applicants' estimate pertain to functions that are characterized elsewhere as having been largely completed. For example, the Westinghouse LRM team, which accounts for $11.2 million of Applicants' total annual cost estimate of $42.3 million for retaining management personnel, has as 'one of its prime functions the provision of project design work. 1/ Yet elsewhere Applicants have estimated that CRBRP " design work is approaching 90 percent completion".
(Attachment A to DOE Letter to NRC Commissioners, December 31, 1981, p. 13.) On the face of it, the $11 million-per-year maintenance of a management team to provide, as one of its 1/ Applicants state that the " specific functions" of the Westinghouse LRM team are said to include " guidance for the planning and implementation of the reactor manufacturers' work in the design . . . of the NSS of the CRBRP . . .
integration of the NSSS through top level design guidance
. . . review of designs in order to assure appropriate design consistency . . . participat(ion] in system design reviews
. . . continuing co-ordination with the Architect-Engineer, including review of designs relating to the nuclear island
. . . ." (See p. 56 of Applicants' Answers.)
O
4 v -
main activities, design-related work appears to be excessive for a project whose design work is close to 90% complete.
Second, the unit costs of retaining managerial personnel appear excessive in some cases. For example, the
$110,500 annual per-person estimate for salaries and ancillary costs for the Westinghouse LRM team (Applicants' Answers, p.
- 60) is an unusually high rate. The charging rate includes, inter alia, R&D costs (ibid., p. 60n). Yet Applicants estimate that " engineering research and development is approximately 95 percent complete". (Attachment A, op. cit.,
- p. 13). .
Third, Applicants' estimate of costs for retaining managerial staff assumes implicitly that during a delay period staff will not (or cannot) perform beneficial activities that would offset the gross costs, at least in part. This assumption flies in the face of experience with the CRBRP.
Elsewhere in Applicants' Answers are descriptions of major design changes which occurred during the period of previous delay. These changes include: 18-foot increases in basemat width and length to accommodate a confinement building around the reactor containment; a 9-foot increase in basemat thickness; increases in foundation sizes of the diesel generator, reactor service and steam generator buildings and of the cooling tower; relocation of roadways and support facilities to optimize flow of materials and equipment;
s v
increase in the size of the turbine-generator building; addition of an emergency cooling tower; etc. (See Applicants' Answers, pp. 26-28). Presumably, such changes have been instituted to satisfy various safety, environmental, economic, and/or R&D objectives. It is reasonable to assume that the approximately 640 management and technical personnel who, Applicants contend, must be retained during construction i
delays, have the capability to make further design changes to optimite the CRBRP. None of the benefits of such changes, including the obvious benefits of making them prior to start of construction, are reflected in Applicants' Answers.
(2) Inflation: In my earlier comments, I indicated that inclusion of the time value of money in calculations of the effect of deferring project expenditures results in net savings, so long as the interest rate (the measure of the saving from deferral) exceeds the inflation rate (the measure of the cost of deferral). Two points, however, deserve elucidation.
First, the estimate'in Intervenors' Comments of a
$30 million benefit per year of delay (p. 33) assumes 11%
current interest and 8% anticipated inflation; at today's actual 14% interest and 8% anticipated inflation, the benefit of delay in the immediate future would be approximately twice
! the $30 million estimate.
i
~
l 4
9 .
Second, Applicants' simplistic calculation of inflationary impacts outside of a present-worth context (i.e.,
exclusive of the time value of money) essentially duplicates calculations made during 1981 by DOE, NRC Staff and nuclear industry representatives of the costs of delays in granting operating licenses for light water reactors nearing completion. Such calculations were without merit then and are without merit in the present context as well. 2/
Inflation per syt does not add to the real costs of capital projects if it operates through delays that also postpone the public's responsibility for payment.
(3) Interest: The last category of costs incurred through delay is said by Applicants to be interest on expended capital that will accrue during the delay period. In Applicants' own words, Whenever an organization, including the United States Government dedicates funds to a capital project, it foregoes the opportunity to invest those funds in alternative projects which will earn an equal or greater return on investment ~~~ or to pay off debt on which the capital costs are being incurred. In short,.the organization " ties-up" capital and incurs an opportunity cost. Although certain components of the cost may be difficult to measure, it is, in an economic sense, a real cost . . . .(Applicants' Answers,
- p. 45.)
1/ There may, of course, as acknowledged in my earlier statement, be a separate cost of delay: the postponement of the substitution of fossil generation by nuclear generation with lower running costs.
'e Applicants are correct, but on the wrong point. It is true that in expending capital funds the U.S. Government foregoes the benefits from alternative capital projects.
Indeed, this is precisely why the deferral of expenditures on CRBRP produces benefits that offset -- indeed, more than offset, given interest rates above the inflation rata -- the inflationary costs of delay. Applicants' statement corroborates Intervenors' contention that, in the realm of
" inflation", there is no net cost, but a net benefit, to any deferral of expenditures at this stage of the CRBRP.
However, the statement does not serve Applicants' intent. Contrary to Applicants' wishes, the future' rate and level of expenditures on CRBRP have no bearing on the costs of past expenditures on CRBRP. Any future delay in project schedule will not result in additional cost on expended capital. Payments from the U.S. Treasury to holders of federal bonds or notes issued to pay for past expenditures on CRBRP will continue at the rates stipulated in those bonds or notes, regardless of the future fate of CRBRP. There is no linkage whatsoever between the progress of CRBRP and the Government's obligation to pay the fixed costs of financing past expenditures. Applicants' very correct observations concerning opportunity costs of capital refer entit^1y and only to future, asmidable expenditures. They have no 6
- + -m ,_. . _ _
O y ..
relevance to expenditures already made. 2/
I r
f i I l &OsauyV Charles Komanoff Komanof f Energy Associ^a}tes
(
333 West End Avenue New York, New York 10023 1/ Applicants' citation (p. 45) of Cost Accounting Standard 417 also has no relevance to past expenditures. That standard specifies that interest costs may be included in the computation of capital costs for rate-making purposes. It has no bearing except in a rate-making context. In any case, although inclusion of interest costs does add to a project's calculated capital cost, it does not add to the net societal costs of a project.
Interest costs are society's means of placing the responsibility for costs during construction upon the contractor. At completion the ratepayer bears the higher project cost due to interest, but this is offset by the ratepayer's avoidance of cost responsibility during construction. The offset exactly equals the cost if ratepayers' and contractor's interest costs are equal, and it exceeds the cost (i.e., delay is beneficial to ratepayers) if ratepayers' interest costs are greater. .