ML20027D437

From kanterella
Jump to navigation Jump to search
Corrected LER 82-075/99X-0:on 820915,steam Tunnel Fire Door IA230 Found Open W/No Fire Watch Stationed.Caused by Maint Work Which Required That Fire Door Remain Open.Fire Watch Established for Duration of Maint Work
ML20027D437
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/13/1982
From: Chenault W
MISSISSIPPI POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20027D432 List:
References
LER-82-075-99X-01, LER-82-75-99X-1, NUDOCS 8211040291
Download: ML20027D437 (1)


Text

wwu LICENSEE EVENT REPORT Attachment to AECM-82/475 Page 1 of 1

.

  • CONTROL BLOCK: l l l l l l l -

(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

@ l 8M9 l S lLaCENSEE 7 G l GCODE l S l 141 l@l 15 0 l 0 l - l 0 l 0 l 0 l 0 l 0 l- l 025l 0 26l@l LICENSE LICENSE NUMBER 4 l 1 TYPEl 1 JO { 1 l b71CAT l@l l

68 l@

CON'T

( 3lil 8

3{y l L @l 0l 5 l 0 l 0 l 0 l 4 l 1 l 6 @l 0 l 9 l 1 ] 5l 8 l 2 l@l 1 l 0 l 1 l 3 l 8 l 2 l@

60 61 DOCK ET NUMBE R 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h I o i 2 I [During routine surveillance in preparing for non nuclear heatuo (Reactor Recirculation l lo l3 l l Pump for Heatup), it was discovered that Steam Tunnel Fire Door 1A230 was open with no l 1014 I lfire watch stationed. The door could not be closed due to the cables (being used for i l o 151 l maintenance activity in the Steam Tunnel) installed in the doorway. T.S.3.7.7 requires l lo Is l 11 fire rated assemblies to be operational at all times or a fire watch stationed l l 0 l 7 l luntil the fire rated assemblies are operational. There was no release of radioactivity,l j o is ] leffect upon public health or safety, or a threat to plant safety. 1 7 8 9 80 SYSTEM CAUSE CAUSE COMP. VALVE CODE CODE SUBCODE COYPONENT CODE SUSCODE SUSCODE l0l9l 7 8 lA l Blh Wh l Clh l Xl Xl Xl Xl Xl Xlh l Zlh W h 9 to 11 12 13 18 19 20

_ SEQUENTI AL OCCURRENCE REPORT REVISION LEReRO EVENT YE AR REPORT NO. CODE TYPE N O.

h ,RE

_ 21 l8 l2 l 22 l--j 23 l0 l715 j 24 26 l/l 27 19 l9 l 28 a W

30

[--J 31 U

32 KE A ON ON PL NT ME H HOURS 22 S B IT D POR h B. SUPPLI MANUFACTURER E33 l@[34_ Z j@ lZl@

35 lZ 36 lh 31l0 l0 l0 l0 40l {@

41 l Nj@

42

{@

43 l Zl 9l 9l 9l@

44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h l i l O ] Rhe fire door was required to be open to allow maintenance work in the steam tunnel. l lilil IAn hourly fire watch was established as required by T.S.3.7.7. The fire watch was I i 2 paintained for 13 days and 21 hours2.430556e-4 days <br />0.00583 hours <br />3.472222e-5 weeks <br />7.9905e-6 months <br /> until the work was complete. Upon completion o^f I L'_i2J lthe work, the fire door was secured. No further action was required. l t 4 l 1 7 8 9 80 ST 5 . % POWER OTHE R STATUS 15 O Y DISCOVERY DESCRIPTION NA Routine Surveillance l1 15llB l@ l 0 l 0 l 0 l@l l lBl@l l A TiVITY Co TENT AMOUNT oF ACTIVITY LOCATION OF RELE ASE y lZ RELEASE l @D oF RELEASEy@l NA l l NA l 7 8 9 10 11 44 45 80 PERSONNEL EXPOSURES NUMBER -

NA l-lTJT) l0 l0 l0 l@lZ '

TYPE @loESCRIPTION

[

' PERSONNE't INJURIES NuvaER oESCRiPTiONh NA l

[L h]8 9l0 l0 l0 l@l 7 15 12 80 LOSS OF OR DAMAGE To FACILITY Q TYPE DESCRIP 710N v i 9 8 9 y@l to NA 80 l

7

( PUsuciTY fin 8211040291 821025 NRC USE ONLY ]~,

PDR ADOCK 05000416 2 0 y l issVEo@oESCRiPTiON NA U 3 PDR l 68 69 l l I l l I I l I I I I I =A 80 E 7 8 9 10 .g

- 4/fp. r NAME OF PREPARER 44"4""' U "" M h" U " N G Wlt- PHONE: