Updated LER 83-001/01X-2:on 830107,electrician Preparing to Route Cable Noticed Two Wall Penetrations Had Been Opened. Because Control Room Not Notified of Work,No Fire Watch in Effect.Caused by Personnel error.W/830831 Ltr
ML20024F456
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/31/1983
From: Byrd R, Dale L
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
AECM-83-0522, AECM-83-522, LER-83-001-01X, LER-83-1-1X, NUDOCS 8309090398
Download: ML20024F456 (4)


Text

NRC FORA 4 386 Update Report - Previous Report Date 5/18/83 u.s.NuCLEAa REcutATor.v Commissaae J7 77) .

LICEIME EVE 9dT IMPOR1r Attachment to AECM-83/0522 Page 1 of 2 l CONTROL 8 LOCK: l l l l l pg3As pacepr On TYPE ALL REQutRED INFORMATION) 8 I 4 sl d eI d il@l oI d -l of oI d oI al I d ol@l 4l 11 iI il il@l 7 8 9 LICENSEE CODE 14 15 LICEasE Numeta 26 26 LICENSE TYPE JO l

b7 CAT 58 I@ l j

CON'T 7

o i d

1 % @ sol ol d ol d ol 4 il @

el DOCK ET NUMSER # d# il d 71 ed sj@l of al si ilsulxl@

EVWilsT DATE 74 75 REPORT D ATE 80 EVEN11 DESCRIPTION AND PROSA8LE CONCEQUEMCES h ITII) ion 1/7/83. an electrician orenarino to route cable am renuired hv m i l 013 l I maintenance wor'k authorization noticed that the two wall onnetrationn __j o 4 l involved (Aux. Bldg. to Turbine B1dg.) had been previously opened. Th e__j

[TJT] l Control Room had not been notified prior to the work, therefore, no firej o e twatch was in effect as required by T.S.3.7.7.a. The event had no effecti Fo [7] l on the health and saf ety of the public and did not constitute a threat I l o la i I to plant saf ety. This is reported pursuant to T.9.6.9.1.12.b. I E "o"oE C S EOoE COuPoNENT COct susCOoe

$$CEE I AI Bl@ W@ W@ l zl z l zi z i zi z i@ z @ g@

E.

SEOuENTIAL 2

OCCURREhCE REPORT 20 REVISION LER RO EVENTVEAR REPORT NO. COOE TYPE N O.

@RE [ 8 l 3l l 0l0 l 1l 24 y

27 lOl11 28 29 W

30 b W 32

_ 21 22 23 29 31 K N A PL T 8400RS 1 POAtf WS. SUPPL MANUFACT RER Q G @, g 33 44 35 l O l 0] O l Ol 37 40 4

@ g 42 J@

43 l44 z l 9l9 l 9l@ 47 CAUSE DESCRIPTION ANDCORRECTtvf ACTIONS 27 i o lThe event was due to personnel error in not giving prior notification 1 i lto the Control Room. An hourly fire watch was established upon I

, 7 l notification. Personnel were reinstructed on compliance to T.S.3.7.7 andl

, 3 lthe requirement of giving prior notification to the Control Room. The i g (penetrations were restored on August 22, 1983. j 7 8 9 80 ST US  % POWER OTretm STA rus OsSCOV R DtSCOVERV DESCRIPTION i s W @ l0l0l0[gl M l W g Observation During Job l

" J,,,,1v CaTE~T A Ou T O, ACTiv Tv @ LOCATicM OP uEASE @

i s r.uIASEo OP anEASEL_J @ L'_]@l." I"1 l 7 8 9 to 11 44 4 80 PERSOas4EL EXPOSURES i ,

1071 o @@[F ' **

1 PEnSons=EL ind$ES

, 4 l0[h N""'"' j 7 8 9 11 12 80 LOSS OF OR DAMAG TO PACILITV i 9 l

"'" 8309090398 830831 NRC USE ONLY PDR ADOCK 05000416 ,

2 a ,ssWgj@[M'R.,T,0.@

L s eDR i i i iiiiiiiiiig F g 9 to 68 69 80 5 Ron Byrd o NAME OF PREPARER _

PHONE:

j ;y

Attachment to AECM-83/0522 Page 2 of 2 SUPPLEMENTARY INFORMATION TO LER 83-001/01 X-2 Mississippi Power & Light Company Grand Gulf Nuclear Station - Unit 1 Docket No. 50-416

~ Technical Specification Involved: 3.7.7.a Reported Under Technical Specification: 6.9.1.12.b

-Event Narrative:

This is an update to previous reports submitted on January 21, 1983, and March 18 1983. The following paragraphs describe the event.

An' electrician preparing to route cable as required by a maintenance wsrk authorization noticed that the two wall penetrations involved had already been opened. The penetrations were AE-257D and AE-258D (elevation 166

. feet, Auxiliary Building to Turbine Building). He reported this to the Control Room. -An LCO was entered'and an hourly fire watch was established in accordance with Technical Specification 3.7.7.a.

It was not determinable exactly when the penetration was opened as the Control. Room had not been notified prior to the activity. Maintenance work had been performed on these penetrations in September, but the penetrations were resealed by October 13, 1982.

Field engineers and work planners were made aware of the problem of opening penetrations without prior notification to the Control Room as corrective action to LER 82-132/01 T-0. These penetrations were likely opened prior to the reinstruction of' personnel in December, 1982.

The penetrations were restored and the LCO lifted on August 22, 1983. This is submitted ~as a final report.

Previous Similar Events:

LER 82-077/01 T-0 LER 82-132/01 T LER 82-027/99 X-1 LER 82-031/99 X-1

< .s o ' 3,'l;> .

MISSISSIPPI POWER & LIGHT d'd'MPANY .

Helping Build Mississippi 8 ,;

Emithithudd5 P. O. B O X 16 4 0. J A C K S O N. MIS Sl QI I 3 9 2 0 5' *'G/g August 31, 1983 8 NUCLEAR PRODUCTION DEPARTMENT [

U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30303 Attention: Mr. J. P. O'Reilly, Regional Administrator

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Update Report - Wall Penetrations Found Open With No Fire Untch Established LER 83-001/01 X-2 AECM-83/0522 This letter submits an update to previous reports submitted on January 21, 1983, and May 18, 1983. The event for which the reports were submitted occurred on January 7, 1983, when an electrician preparing to route cabic through two wall penetrations noticed they were already open. This was reported to the Control Room. A Limiting Condition for Operation was entered and an hourly fire watch was established in accordance with Technical Specification 3.7.7.a. The event was reported pursuant to Technical Specification 6.9.1.12.b.

The penetrations were restored on August 22, 1983. This is a final report. Attached is LER 83-001/01 X-2 with Supplementary Information.

Yours truly,

)//bb.b k L. F. Dale Manager of Nuclear Services EBS/SHH: sap Attachment ec: (See Next Page)

PI cyytc# CO ~

fg Q N Member Middle South Utilities System

AECM-83/0522 MICOl2flPPI POWER'O LICHT COMPANY cc: Mr. J. B. Richard (w/a)

Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung, Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission.

Washington, D. C. 20555 Document Control Desk (w/a)

U. S. Nuclear Regulatory Commission Washington, D. C. 20555

_ _ _ _ - _