05000416/LER-1983-052-03, /03L-0:on 830411,while Reviewing Vessel Head Installation Work Package,Discovered Head Flange/Vessel Flange Thermocouples Not Physically Reinstalled During Insulation Installation.Cause Under Evaluation
From kanterella
(Redirected from ML20023D477)
Redirect page
Jump to navigation
Jump to search