LER 83-049/03L-0:on 830409,during Cold Shutdown,Diesel Generator 12 Auto Start Not Available When Alarm Actuated. Caused by Condensate Drain Valve Downstream of Tank C Not Fully Closed.Compressors Reworked
ML20023D251
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/09/1983
From: Byrd R
MISSISSIPPI POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20023D246 List:
References
LER-83-049-03L, LER-83-49-3L, NUDOCS 8305200286
Download: ML20023D251 (3)


Text

'

NRC FORM 364 U. S. SeuCLEAR ltE!ULATORY COMMISS4000 (7

77) '

LICENSEE EVENT REPORT Attachment to AECM-83/0274

- Page 1 Of 3 coNrr.ot stock: l l l _l l l (PLEASE PRINT 001 TYM ALL REQU4IED 1% FORMATION) 7 o i 8 9 l Mi LICENSEE s l sl CODE a l sl i l(i)l o l ol-l ol o le is l ol o l 01- 10102hGl4 LICENSE NUMBER 38 l LICENSE Il t I tiTYPEl Jol@l57 CATI 68 l@

CON'T 7

o i 8

n' "J LLEI80 o61 l si o DOCKETI 01 NUsestER o i 41 1 1 #60 #of 4 IEVENT ol 9 i si s l@l o I siREPORT DATE 74 75 o I DATE 91 e I sl@

80 a

EVENT DESCRIPTION AND PRO 8ABLE CONSEOUENCES h o 2 lan 4-9-R3. while in Cold shutdown. a D/G 12 Auto Start Not Available 1 0 3 lalarm ac*cuated. An investiaation revealed the pressure in air start I o 4 lstoraos tank C to be less than 160 psig and the pressure in tank D to bel M l210 psio. An attempt to restore pressure failed. D/G 12 and its l 0 6 l35soCatied Division II ECCS system were declared inoperable. The plant l l0l7Itwas operatino under action "a" of T.S.3.5.2 (LER,83-060/03 L-0). As a l 10181Iresult of this event an LCO was entered under action "b" to T.S.3.5.2. J "E *#7E C0 o'Ena= CourONENT Coos sue $o# of sEs$CE$e l

7 0 9 I PI A lh Wh Wh l Vli3 A I LIV l ElX lh Wh P@

. i. i, i2 ,. 2

,_ SE QUE NTI AL OCCURRENCE REPORT REVISION LER RO EVENT YE AR REPORT No. C006 TYPE NO.

@ gEg 181 si [.. _j l o l4191 24 12.) I 0131 3 29 L'_J 30 1--d LoI 32_

._21 22 23 26 27 31 KE AC ON L NT M HOURS E FOR bOS. PPL MA F RER

[X_j@[Gj@

33 34

[Z_j@

36

[Z_j@

35 lo l 0l0 l 0]

37 40 y@

di Ng 42

[Aj@ lY l Ol1 l 0lg 43 44 47 CAUSE DESCRIP7 Doff AND CORRECTIVE ACTKWe5 h

@ lA condensate drain valve downstream of the C tank was found not fully l l - [] [ closed (approx. 1/2 turn open). Both the motor driven compressor and thel i 2 Idiesel driven compressor failed to restore pressure due to damaged comp-l

, @ lonents. The compressors were reworked and have been returned to service.j l

t 4 IThe attached supplemental information provides futher corrective action.]

7 8 9 88 ET  % POWER OTHER ST ATUS S R DISCOVERY DESCRIPTION fil T] [6_,j @ l 0 1 0 [0 l @ l M j @ Alers Actuation l i

AdnvirY CSTENT LOCATION OF RELEASE i s RnELt_l ASE D@OFAMCUNT RE LE ASELt_l@lm OF ACTivtTY 44 I*

4

@i 80 I

7 ft 9 13 11 PERSONNEL EXPOSURES NUMSER TYPE DESCRePTIOes h I

LLI.I.] I o Ie I o l@L2_J@l '

= .0

, ERsON~E'L ,~;u'4Es

~u 8ER oEsCR ,1,0 @

8 IoIoIol@lm 7 8 9 si .2

  • l Loss Or oR DAuAct TO FACiuTY g 8305200286 830509 I

l TYPE DESCRIPTION v ,DR ADOCK 05000416 P

8 LLi@lm 7 8 9 10

<> eDR "-

I l I DESCRtPTION i @] SSUED@l L"_l

  • I IIll111IIIIi11 68 63 80 g

) 7  := 9 to o

NAME OF PREPARER Ron Byrd PHONE: S

. Attschment to AECM-83/0274 Page 2 of 3 SUPPLEMENTARY INFORMATION TO LER 83-049/03 L-0 Mississippi Power & Light Company Grand Culf Nuclear Station - Unit 1 Docket No. 50-416 Technical Specification Involved: 3.5.2 Reported Under Technical Specification: 6.9.1.13.b Event Narrative:

On April 9, 1983, a " Diesel Generator 12 Auto Start Not Available" alarm was received. An immediate investigation revealed the pressure in the C air storage tank to be 160 psig and dropping. The pressure in air storage tank D was 210 psig. Technical Specification 4.8.1.2 requires the pressure in all diesel air start receivers to be greater than or equal to 160 psig.

Therefore, Diesel Generator 12 and its associated Division 11 ECCS system were declared inoperable.

At this time the plant was operating under an LCO due to LPCI "C" being the only operable ECCS system (see LER 83-060/03 L-0). Therefore, on April 9, 1983, at 1615 hours0.0187 days <br />0.449 hours <br />0.00267 weeks <br />6.145075e-4 months <br />, action statement "b" of Technical Specification 3.5.2 was entered due to no operable ECCS systems.

Operations personnel investigating found the motor driven air compressor overheating. The compressor was secured and the breaker opened. Valve F033E (in-line drain between the air receiver and the diesel) was found not fully closed (open approximately one half a turn allowing the air tank to drop in pressure). The valve was closed and the diesel driven compressor started in an attempt to recharge the receiver., The compressor failed to transmit air to the receiving storage tank. The motor driven compressor breaker was reclosed but tripped.

At 2015 hours0.0233 days <br />0.56 hours <br />0.00333 weeks <br />7.667075e-4 months <br /> the establishment of secondary containment began. This action was discontinued when HPCS was restored to operability at 2221 hours0.0257 days <br />0.617 hours <br />0.00367 weeks <br />8.450905e-4 months <br />.

Operation under action statement "a" of T.S.3.5.2 continued until April 18 when both LPCI B and C were declared operable.

A subsequent investigation revealed the following:

o Cause of the loss of air pressure in the air receiver tank is attributed to a slightly open condensation drain valve.

o Failure of the motor driven compressor is attributed to overheating due to lack of oil and continuous operation. The heat caused a lead gasket /lockwasher to soften allowing the pressure discharge valve set screw to back out. This rendered the compressor discharge valve inoperable and prevented the compressor from discharging properly, o The diesel driven compressor failed due to a broken unloader fitting which disabled the compressor from discharging properly. It is believed this fitting may have been broken accidently by personnel previously working in the area since a portion of the fitting protrudes outside the casing.

.- . -- - _ _ . . - . . _ - . .- __ . .~ . . . - .-

. , i

. Attachmsnt to  !

AECM-83/0274 Page 3 'of 3 o it was noted that certain valves between the compressor and air receivers were sticking. The control air lubricator / regulator was found ',ith no oil in its reservoir. Additicaally it was discovered that no procedures existed for calibrating or performing preventive maintenance on pressure control valves.

Both compressors have been reworked and returned to service. Division II Diesel Generator was declared operable on April 13, 1983, at 1615 hours0.0187 days <br />0.449 hours <br />0.00267 weeks <br />6.145075e-4 months <br />. The i operators daily rounds were revised to include checking and adding oil to the air compressors and air lubricator / regulators. Air header drain valves (P75F033's) will be locked closed. Calibration and Preventive Maintenance procedures will be issued for pressure control valves. All corrective action is expected to be complete by~ July 31, 1983. This is submitted as a final report pursuant to T.S.6.9.1.13.b.

9 l

l 5

i l

l l

l l