ML20023C561

From kanterella
Jump to navigation Jump to search
Updated LER 83-004/01T-1:on 830110,penetration AP-72B Found Open & Had Been Open Since 821213.Caused by Planned Maint Work & Personnel Error.Hourly Fire Watch Established. Penetration to Be Resealed by 830630
ML20023C561
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/09/1983
From: Byrd R
MISSISSIPPI POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20023C558 List:
References
LER-83-004-01T, LER-83-4-1T, NUDOCS 8305170433
Download: ML20023C561 (2)


Text

Update Report-Previous Report Date 1/24/83 UA NucLEAa camToaY COMISSIORI

""h'"$3**

  • LICENSEE EVENT REPORT Attachment to AECM-83/0269 Page 1 of 2 CONTT.0L CLOCK: l l l l l l iPLEAM PRISIT Oe TYPE ALL REQUtREO INFORMATIONI Io I 8tl 9I W SI 7

el e I d i l@l o I ol -I of LSCENSE LICENSEE CODE 14 15 o I ofNUMBERo I ol - I of o @l264 l 111 24 >

l 11 1 l@l57 CAT LICENSE TYPE JO l

58 I@

CCVT o i 7 8 1TC LL_J@l 80 81 of si o f of o I al 11 61@l DOCKET NUMBER S W oi 11 11 o f al 374 l@l EVENT DATE 75 o fREPORT si olDATE4 e I 31@ 80 EVENT DESCRIPTION AND PROSABLE CONSEQUENCES h

@j lun Januarv lo. 1993. with the olant in cold shutdown. Field Enaineerina 1 o 3 Inotified the Control Room that penetration AP-72B (Floor penetration. I lo14llelevation 119 feet, Auxiliary Building) was open and had been open sinced o s l December 13, 1982. An hourly fire watch was established in accordance j loIslIwith T.S.3.7.7.a. The event had no affect on the health and safety of i 10171lthe oublic and did not constitute a tnreat to pl, ant safety. This is I o a Ireported pursuant to T.S.6.9.1.12.b. This is a final report. I E #

Co"o'e' s sC00E couPo=EwT Coot s N oE sE;N*o'oe 7 8 l Al B lh [A_)@ d@ l Zl Z l Zl Z l Zl Z l@ W@ (_Zj @

9 to 11 12 13 18 19 20

_ SEQUE NTI AL OCCUR R ENCE REPORT REVISION EVENT YE AR REPORT 8eO. COoE TYPE No.

=

@ ;LER ROl

_ 21 e l si 22 l--J 23 1010141 24 36 12]

27 10l11 M 29 LT_]

30 l-J 31 L1_J 32 KE A ots PL NT T HOURS FORM 8. L MA TURER

@33@ % 38 35

(_6Z.,j@

3

[ O [ ol o l oj 37 48 y@

44 W@ J@

42 43 l44Z l 9l 9 l 9l@ 47 CAUSE DESCRIPTION AND CORRECTIVE ACT60NS h lTlT)IThe penetration was opened to perform planned maintenance work. 1 l - Q] l Personnel involved were unaware of the actions reouired by T.S.3.7.7 at 1 y lthat time. Personnel became aware of the incident through the correctival i a lactions taken on LER 82-132/o1 T-o and reported it accordingly. The l i 4 l penetration is expected to be restored by June 3o, 1983. I 7 8 9 80 ST  % POWIGM OTHER STAT 1.5 DISCO % RV DISCOVERY DESCnePTIOps i s LLJ@ l o l o l o l@l '2 "

=_ "

l La_)@(

I A!nviTv Cama REtEAsEo oP RE<E AsE toCATioN o, R.<EA E @

i e LLj @ LLl@lm AMou~T o, ACT,v,Tx la @I 1 7 9 9 to 11 44 4 80 PERSONNEL EXPOSURES NUUSE R TYPE DE SCRIPT *0N i i l o l o I o l@[J_)@l m i PERSONNELtNJU IES NuM8ER oEsCRiPno~@

7 i a 8 9 lololol@lm 11 12 80 I

i E DE A PT

' 9 l L2_]@l m _

NRC USE ONLY issu E. kRADDCKO5170433 S 05000416 830509

  • 8 LE.

i 3 1 to PDR l 68 69 llIIIIlIIIIIII 80 5 NAME OF PREPARER Ron Rvrd P H O'N E :

Attachment to AECM-83/0269 Page 2 of 2 SUPPLEMENTARY INFORMATION TO LER 83-004/01 T-1 Mississippi Power & Light Company Grand Gulf Nuclear Station - Unit 1 Docket No. 50-416 Technical Specification Involved: 3.7.7 Reported Under Technical Specification: 6.9.1.12.b Event Narrative:

This is an update to a previous report submitted on January 24, 1983. The event reported is described in the following paragraph.

On January 10, 1983, a field engineer notified the Control Room that a floor penetration in the Auxiliary Building (AP-72B) was open and had been open since December 13, 1982. The person reported that he was unaware of the actions required by the Technical Specifications at the time. He was alerted to the incident as a result of the corrective actions of LER 82-132/01 T-0. An hourly fire watch was established on January 10, 1983.

The penetration is expected to be resealed by June 30, 1983. The fire watch will be maintained in the interim. This report is submitted pursuant to T.S.6.9.1.12.b.

Previous Similar Events:

LER 82-077/01 T-0 LER 82-132/01 T-0 LER 82-001/01 T-0 LER 82-027/99 X-1 LER 82-031/99 X-1 1