Proposed Tech Specs Allowing 8 H to Restore Inoperable Accumulator,Except Resulting from Closed Isolation Valve
ML20012B495
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/02/1990
From:
NORTHEAST UTILITIES
To:
Shared Package
ML20012B412 List:
References
NUDOCS 9003150107
Download: ML20012B495 (1)


Text

- - - - - - - - - - . . .

.7  ;

3/4.5 EMERGENCY CORE COOLING SYSTEMS 3/4.5.1 ACCUMULATORS LIMITING CONDITION FOR OPERATION 3.5.1 Each Reactor Coolant System (RCS) accumulator shall be OPERABLE with:

a. The isolation valve open and power removed,
b. A contained borated water volume of between 6618 and 6847 gallons,
c. A boron concentration of between 2200 and 2600 ppm, and
d. A nitrogen cover-pressure of between 636 and 694 psia.

APPLICABILITY: MODES 1, 2, and 3*. .

ACTION:

a. With one accumulator inoperable, except as a result of a closed isolation valve, restore the inoperable accumulator to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce pressurizer pressure to less than 1000 psig within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

-b. With one accumulator inoperable due to the isolation valve being closed, either immediately open the isolation valve or be in at least HOT STANDBY'within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce pressurizer pressure to less than 1000 psig within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. .

SVRVEILLANCE RE0VIREMENTS 4.5.1.1 Each accumulator shall be demonstrated OPERABLE:

a. At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by:
1) Verifying the contained. borated water volume and nitrogen cover-pressure in the tanks to be within the above limits, and
2) Verifying that each accumulator isolation valve is open.
b. At least once per 31 days and within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after each solution volume increase of greater than or equal to 1% of tank volume by verifying the boron concentration of the accumulator solution; and
  • Pressurizer pressure above 1000 psig.

MILLSTONE - UNIT 3 3/4 5-1  :

9003150107 900302 ,o PDR ADOCK 05000423 D P PNU 'Q

^