Other: ML19209B241, ML19209D051, ML19225A294, ML19253C727, ML19254D131, ML19260C591, ML19261A687, ML19271A997, ML19289F192, ML19290G682, ML19290G684, ML19296B603, ML19305C421, ML19305C425, ML19309C609, ML19310A216, ML19312E060, ML19316B059, ML19318D060, ML19321B061, ML19321B275, ML19321B278, ML19321B279, ML19321B280, ML19323G448, ML19323G697, ML19323G716, ML19323G721, ML19323G724, ML19327A031, ML19327A034, ML19330A930, ML19330B134, ML19330B773, ML19331C780, ML19332A973, ML19339C903, ML19339C906, ML19340D089, ML19340D375, ML19340D378, ML19341D543, ML19343A468, ML19343B697, ML19343B738, ML19345B741, ML19345B745, ML19345D494, ML19347A955, ML19351D831... further results
|
MONTHYEARML20150A6581978-09-21021 September 1978 Order Re Responses to NRC Interrogatories by Coalition for Safe Pwr & Consolidation.Cfsp Must:Respond W/In 14 Days to S1,S2,E1,G1,G2,G3,G8 & All Other Interrogatories;Clarify the Status of Spokesmen.Motion for Reconsideration Is Denied Project stage: Approval ML20062C1421978-10-11011 October 1978 Notice of Evidentiary Hearing on Issue of Interim Operation & Limited Appearance.Hearing to Determine Whether Interim Operation Should Be Permitted Prior to Mods Required by Order Will Be Held on 781023 & 1030-1101 Project stage: Other ML20062D3481978-11-0606 November 1978 Cross-examination or Testimony Re Analysis & Review by Licensee Poge of safety-related Matls in Control-Auxiliary- Fuel Bldg Complex Will Be Taken at 781211 Hearing.Nrc Given Time to Reply to Interrogs.Proposed Findings Due 781120 Project stage: Other ML19261A6871979-01-30030 January 1979 Intervenors Are to File Contentions by 790226 & Close Discovery by 790328,after Which Evidentiary Hearing Re Phase 2 Issues Will Commence Project stage: Other ML19261C3481979-03-0808 March 1979 Notification of Prehearing Conference in Portland,Or,On 790329-30 Re Phase II Control Bldg Proceeding.Conference Will Consider Intervenors Contentions,Scheduling Matters & Status of NRC Review of Mod Project stage: Approval ML19289F1921979-04-12012 April 1979 Confirms Action Taken During Prehearing Conference,Phase II, Re Contentions of Coalition for Safe Power & Consolidated Intervenors.Directs Intervenors to Give Fuller Responses to Interrogatories.Adopts Phase II Schedule Project stage: Other ML19225A2941979-06-15015 June 1979 Order Directing Consolidated Intervenors & Coalition for Safe Power to Respond Promptly to NRC 790515 Second Set of Interrogatories.Order Relates to NRC 790614 Request Project stage: Other ML19209B2411979-07-27027 July 1979 Order Consolidating Intervenors N Bell & Consolidated Intervenors W/E Rosolie & Coalition for Safe Power Project stage: Other ML19254D1311979-09-12012 September 1979 Notifies of 790920 Hearing in Bethesda,Md,On NRC 790906 Motion to Postpone Phase II Evidentiary Hearing Scheduled for 791010 in Portland,Or Project stage: Other ML19209D0511979-09-18018 September 1979 Order Vacating NRC 790906 Motion to Postpone Hearing,Denying Intervenors 790913 Motion for Change of Venue & Granting State of or & Intervenors Motion for Extension of Time to Respond to Licensee Motion for Summary Disposition Project stage: Other ML19253C7271979-11-30030 November 1979 Modifies ASLB Partial Initial Decision Permitting Interim Operation of Facility.Operation Will Not Resume Pending Further Order.Nrc Shall Inform ASLB of Unresolved Items Re Seismic Issues Project stage: Other ML19260C5911979-12-12012 December 1979 Notice of 791228 Public Hearing Re Seismic Considerations & Interim Operation Motions & Orders Project stage: Other ML19296B6031980-02-0707 February 1980 Notice of 800331 Evidentiary Hearing on Phase II of Control Bldg Proceeding Re Safety of Mods.Hearing Will Be Held at Court of Appeals Courtroom,Portland,Or & May Continue on 800416 at Bonneville Power Admin Auditorium.W/Svc List Project stage: Other ML19305A7511980-02-0808 February 1980 Corrections to Transcript on 791229 Meeting in Portland,Or Hearing Re Control Bldg Project stage: Meeting ML19312D7611980-03-17017 March 1980 Forwards NRC Testimony of F Clemenson & Je Knight Re Mod Work Effects,Ks Herring & D Persinko Re Coalition for Safe Power Contentions 20,12/13 & 16 & CM Tramwell Re Railroad Spur & Safety Evaluation Authors Project stage: Approval ML19309C6091980-03-20020 March 1980 Order Re 800311-12 Prehearing Conference,Phase II of Control Bldg Proceeding,Held in Portland,Or.Licensee Motion for Summary Disposition of Contention 3 Granted.Interim Operation Will Constitute Issue in Evidentiary Hearing Project stage: Other ML19305C4211980-03-24024 March 1980 Forwards NRC 800324 Testimony of Ks Herring & D Persinko Re Structural Adequacy of Proposed Mods,Served on All Parties & Intervenors Per 800311 Prehearing Conference Agreement Project stage: Other ML19305C4251980-03-24024 March 1980 NRC Testimony Re Structural Adequacy of Proposed Control Bldg Mods.Presents Basis for Requiring Mods,Position Re Interim Operation & Assessment of Structural Adequacy Project stage: Other ML19316B0591980-05-0707 May 1980 Proposed Findings of Fact & Conclusions of Law Re Design Mods for Control Bldg.Mods Should Be Permitted Per Amend to OL Restoring Intended Design Margins of Revised Tech Spec 5.7.1 Project stage: Other ML19323G7241980-05-19019 May 1980 Memo of Points & Authorities in Support of State of or Proposed Findings of Fact & Conclusions of Law.Proposed Findings Are Intended to Increase Likelihood That Mods to Facility Will Meet Seismic Safety Stds Project stage: Other ML19323G7211980-05-19019 May 1980 State of or Proposed Findings of Fact & Conclusions of Law Re Design Mods for Facility.If Proposed Findings Are Included by ASLB in Initial Decision,State of or Will Concur W/Proposed Licensee Findings & Conclusions Project stage: Other ML19323G7161980-05-19019 May 1980 Forwards State of or Proposed Findings of Fact & Conclusions of Law Re Design Mods for Facility & Memo of Points & Authorities in Support of State of or Proposed Findings of Fact & Conclusions of Law Project stage: Other ML19305E7791980-05-19019 May 1980 Proposed Findings of Fact & Conclusions of Law on Mod to Control Bldg.Urges ASLB to Permit Mods Subj to Terms & Conditions Amending OL Per Encl Proposed Draft Order. Certificate of Svc Encl Project stage: Draft Other ML19323G4481980-05-22022 May 1980 Order Instituting Corrections to 800331-0403 & 0416-17 Evidentiary Hearing Transcripts.Pp 3,640-4,828.W/Certificate of Svc Project stage: Other ML19323G6971980-05-29029 May 1980 Response to NRC & State of or Proposed Findings of Fact & Conclusions of Law.Reporting Requirement Will Detract from Other Licensee Responsibilities & Should Not Be Imposed.Nrc Agrees to Footnotes 2,3 & 4.Certificate of Svc Encl Project stage: Other ML19312E0601980-05-30030 May 1980 Admits & Corrects Error in NRC 800519 Proposed Findings of Fact & Conclusions of Law on Control Bldg Mod,Stated in Footnote 34 on Page 134 Project stage: Other ML19310A2161980-06-0202 June 1980 Order Requesting Licensee to Supply Affidavit Re Licensee 800519 Rept on Discovery of Inadequate Connection in Auxiliary Bldg Wall.Cause of Occurrence & Other Related Matters Should Be Identified.Certificate of Svc Encl Project stage: Other ML19318D0601980-06-28028 June 1980 Submits Revised Criteria to Be Used in Analysis of out-of- Plane Behavior of Heavyweight Double Wythe Masonry Walls. Includes All Masonry Walls Having Safety Significance.All Masonry Walls Will Comply W/Revised Criteria by 801031 Project stage: Other ML19330A9301980-07-11011 July 1980 Initial Decision Modifying OL Immediately.Exceptions May Be Filed within 10 Days,Briefs within 30 Days & Supporting or Objecting Briefs within 30 Days of Original Briefs.Decision Shall Constitute Final Action within 45 Days Project stage: Other ML19321B2791980-07-23023 July 1980 Proposed Findings of Fact & Conclusions of Law Re Design Mods for Control Bldg.If ASLB Will Include Proposed Suppls & Additions in Initial Decision,Appellant Will Concur in Licensee Proposed Findings & Conclusions Project stage: Other ML19321B2751980-07-23023 July 1980 Forwards Motion for Reconsideration of Initial Decision, Memorandum of Points & Authorities in Support of Motion for Reconsideration & Proposed Findings of Fact & Conclusions of Law Re Design Mods for Control Bldg Project stage: Other ML19321B0611980-07-23023 July 1980 Forwards NRC Motions for Extension of Time to File Exceptions to ASLB 800711 Initial Decision & Other Related Requests.Nrc Will Issue License Amend Per ASLB Order Issued W/Initial Decision Due to Desire to Restore Seismic Margins Project stage: Other ML19321B2801980-07-23023 July 1980 Memorandum of Points & Authorities in Support of State of or Proposed Findings of Fact & Conclusions of Law.Findings & Conditions Proposed by Appellant Will Increase Likelihood That Mods Will Meet Seismic Safety Stds Project stage: Other ML19321B2781980-07-23023 July 1980 Memorandum of Points & Authorities in Support of Motion for Reconsideration of Initial Decision.Decision Does Not Discuss Issues Raised in State of or Proposed Findings of Fact & Conclusions of Law.Certificate of Svc Encl Project stage: Other ML19330B1341980-07-24024 July 1980 Order Granting Extension of Date for Filing Exceptions to ASLB 800711 Initial Decision Re Mods to Control Bldg. Executive Legal Director Requested to Remind Staff of Necessity for Compliance W/App a Requirements Project stage: Other ML19330B7731980-07-25025 July 1980 Amend 47 to License NPF-1 Permitting Proposed Mods to Control Bldg & Consisting of Tech Spec Changes Project stage: Other ML19330B7891980-07-25025 July 1980 Notice of Issuance of Amend 47 to License NPF-1 Project stage: Approval ML19330B7621980-07-25025 July 1980 Forwards ASLB 800711 Initial Decision Re Control Bldg Mods, Amend 47 to License NPF-1 Consisting of Changes to Tech Specs & Notice of Issuance of Amend to Facility OL Project stage: Approval ML19327A0311980-07-29029 July 1980 Response to NRC Motion for Clarification of ASLB 800711 Initial Decision Re License Condition on Control Bldg Mod. Does Not Object to Including NRC & Licensee Proposals in Condition 2.C.11 Project stage: Other ML19327A0341980-07-29029 July 1980 Response to State of or 800723 Motion for Reconsideration of Initial Decision.If Addition of Discussions Determined,Basis for Elaboration Is Set in Licensee 800529 Response to NRC & State of or Proposed Findings of Fact.W/Certificate of Svc Project stage: Other ML19351D8341980-07-31031 July 1980 Rept on Criteria & Methodology for Evaluation of Out-of- Plane Loading on Masonry Walls at Trojan Power Plant Project stage: Other ML19271A9971980-08-0707 August 1980 Order Granting Extension Until 800818 for NRC to Respond to State of or 800723 Motion for Reconsideration of Initial Decision Issued in Control Bldg Proceeding.Certificate of Svc Encl Project stage: Other ML19331C7801980-08-15015 August 1980 Response in Support of State of or 800723 Motion for Reconsideration of Initial Decision Re Basis for Rejection of Proposed Condition.Rejection of Condition Re Minor Deviation Reporting Was Proper.Certificate of Svc Encl Project stage: Other ML19331D3411980-08-27027 August 1980 Order Clarifying ASLB 800711 Initial Decision Re Control Bldg Mods.Provisions of PGE-1020 Through Revision 4 & PG&E Exhibit 27 Will Be Solely Imposed as License Conditions.All Other Matl Will Become Part of Amended FSAR Project stage: Approval ML19343A4681980-09-0404 September 1980 Order Adhering to ASLB 800711 Initial Decision Which Rejected State of or Proposed License Conditions Re Accelerated Reporting Project stage: Other ML19337A2011980-09-0505 September 1980 Advises That NRC Will Not File Exceptions to ASLB 800711 Initial Decision,Per ASLB 800827 Clarifying Order Project stage: Approval ML19332A9731980-09-15015 September 1980 Order Extending Until 800929 Time for State of or to Either Withdraw Exceptions to ASLB 800711 Decision,Amend Exceptions in Light of Ruling or Notify Aslab of Intent to Proceed W/ Appeal on Basis of Exceptions as Now Formulated Project stage: Other ML19347A9551980-09-23023 September 1980 Amended Exceptions to Initial Decision Re License Conditions & to ASLB Order Re State of or Motion for Reconsideration. Accelerated Reporting of Design Changes & Completion of Seismic Evaluation Must Be Imposed.Certificate of Svc Encl Project stage: Other ML20062J5401980-10-22022 October 1980 Brief in Support of Exceptions to ASLB 800711 Initial Decision & to Aslab 800904 Order.Urges That Decision Be Modified to Include Accelerated Reporting Conditions & That Oral Argument Be Held Re Exceptions.W/Certificate of Svc Project stage: Other ML19351D8311980-11-0404 November 1980 Informs That ASLB 800827 Condition Imposed Re Mods of Control Bldg Design Deficiencies Must Be Added to Fsar. Tech Spec 5.7.2.1 Should Be Modified.Response Requested within 30 Days Project stage: Other 1980-05-19
[Table View] |
Text
,
I.'w.c n,,xr-mmum um ammmu Portland General ElectricCompany I
~
DonacJ BroeN Assistant Vce Prescem February 25, 1981 Trojan Nuclear Plant Docket 50-344 Lictmse NPF-1 l.
y p~ -
Mr. R. H. Engelken, Director f%'
OCC U. S. Nuclear Regulatory Commission
,, gcg y -
s i'.3 h ].J.. e Region V m
Suite 202, Walnut Creek Plaza l,Q
,,aoW c
'^
1990 N. California Blvd.
~;"
Walnut Creek, CA 94596 A
y/
Y/
Dear Mr. Engelken:
N' O/
In accordance with my letter to you dated February 6, 1981, attached is Licensee's Safety Evaluation, performed by Bechtel Power Corporation, of the acceptability of severing tendons in the precast panels of a Control Building floor slab during the Control Building modifications. A copy of this Safety Evaluation is being sent to the Office of Nuclear Reactor Regulation.
Sincerely,
,4~
. }
D t)
/(_,b,abl Xn A
JG D,'Cg' MAR 041993,, %
E v.s.
8 neouurcat /
'88 0 *
/
Attachment i'
c:
Mr. Robert A. Clark, Chief s
Operating Reactors Branch No. 3 Division of Licensing U. S. Nuclear Regulatory Commission Mr. Lynn Frank, Director
]
l State of Oregon Department of Energy Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission f
Washington, DC 20555 Service List b.;.
33._73..g.g.,,,..
.3j
s UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING APPEAL BOARD In the Matter of
)
)
Docket 50-344 PORTLAND GENERAL ELECTRIC COMPANY,
)
et al
)
(Control Building Proceeding)
)
(Trojan Nuclear Plant)
)
CERTIFICATE OF SERVICE I hereby certify that on February 25, 1981 Licensee's letter dated February 25, 1981 to the NRC, Region V, with attachments, has been served upon t.ie persons listed below by depositing copies thereof in the United States mail with proper postage affixed for first class mail.
Alan S. Rosenthal, Esq., Chairman Dr. Kenneth A. McCollom, Dean Atomic Safety and Licensing Appeal Division of Engineering, Bosrd Architecture and Technology U. S. Nuclear Regulatory Commission Oklahoma State University Washington, D. C.
20555 Stillwater, Oklahoma 74074 Dr. John H. Buck, Member Dr. Hugh C. Paxton Atomic Safety and Licensing Appeal 1229 l'.at Street Board Los Alamos, New Mexico 87544 U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Atomic Safety and Licensing Board Panel Dr. W. Reed Johnson, Member U. S. Nuclear Regulatory Commission Atomic Safety and Licensing Appeal Washington, D. C.
20555 Board U. S. Nuclear Regulatory Commission Atomic Safety and Licensing Appeal Washington, D. C.
20555 Panel (5)
U. S. Nuclear Regulatory Commission Marshall E. Miller, Esq., Chairman Washington, D. C.
20555 Atomic Safety and Licensing ?oard U. S. Nuclear Regulatory Commission Washington, D. C.
20555
CERTIFICATE OF SERVICE Docketing and Service Section (4)
Ms. Nina Bell Office of the Secretary 3926 N. E. 12th Avenue U. S. Nucleat Regulatory Commission Portland, Oregon 97212 Washington, P. C.
20555 Mr. John A. Kullberg Joseph R. Graf, Esq.
15523 S. E. River Forest Drive Counsel for NRC Staff Portland, Oregon 97222 U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Mr. David B. McCoy 348 Hussey Lane Lowenstein, N<swasn, Reis, Axelrad &
Grants Pass, Oregon 97526 Toll 1025 Connecticut Ave., N. W.
Ms. C. Gail Parson Suite 1214 P. O. box 2992 Washington, D. C.
20036 Kodiak, Alaska 99615 Frank W. Ostrander, Jr., Esq.
Mr. Eugene Rosolie Assistant Attorney General Coalition for Safe Power State of Oregon 215 S. E. 9th Avenue Department of Justice Portland, Oregon 97214 500 Pacific Building 520 S. W. Yamhill Columbia County Courthouse Portland, Oregon 97204 Law Library Circuit Court Room William Kinsey, Esq.
St. Helens, Oregon 97051 Bonneville Power Administration P. O. Box 3621 Portland, Oregon 97208 MLS h.
w/
RonaldW.phnson Assistant General Counsel Portland General Electric Company Dated: February 25, 1981 4-66.27313
I COI:':ITl rCT CLI.RITICT. TION RCGLCDING
.i CUTTIIG TCNDOCS Ili PRECTET PAUCLS i
i
}
Background
}
In " Licensee's Tectimony on Matters Other than Etructural t
Adequccy of the Modified Complex", Licenace tectified that i
drilling aleng column line N' in the electrical at Willaries l
. room, so that rebar U-bends could be inserted would not i
affect the tendons in the precast pancis of the floor slab because the tendons are located at regular intervals and their location would be established and avoided during the drilling.
This testimony was based on Licensee's plan at that time to drill holes one inch in diameter.
Bechtel field construction engineering personnel requested that additional holes five inches in diameter be drilled to facilitate concrete placement.
This size hole necessarily required that two tendons in one panel be severed during the drilling process.
l Commitment Clari_fication The commitment is changed to allow no more than two tendons to be cut in the precast panel along column line M'.
Evaluation The design live load for the particular area is 300 psf.
An evaluation has shown that even with two tendons cut, the panel still has excess capacity when the actual live load resulting from the concrete placement is applied.
Once the new wall on N' line is constructed under the panel, it again will be able to carry the live load of 300 psf.
This change in commitment does nott (1) increase the occurrence probability or an accident of malfunction of safety-related equipment previously analyzed; (2) increase the consequences of an accident or malfunction of safety-related equipment previously analysed; (3) represent the possibility of a different type of accident or malfunction of safety-related equipment from the previously analyseds l
30/A-10 t
a l
l u-I Page 2 of 2 3
(4) reduce the scrgin of safety, nor (S) require a change to the Technical Seccificctionc or Opercting Licence, i
ALLO '
W$
P. Chang 6o
~
T. E. buchnell Bechtel Project Engineer civil Engineering Branch Menager Nuclear Projects Enginocring g
Agd ! p( y
/s/ C. P. Yundt T
J.W(Lentsch,Hanager C. P. Yundt Gcneration Licensing
'oneral Hunager and Analysis Department Trojan Nuclear Plant e
e O
6 30/A-13
~- -- - - -
.