TAC:13152
From kanterella
(Redirected from TAC:43449)
Request for: Approved, Closed | |
Initiation
Questions Answers Results Other: ML19209B241, ML19209D051, ML19209D056, ML19225A294, ML19248C934, ML19249D678, ML19253C727, ML19254D131, ML19254F178, ML19260C591, ML19261A687, ML19271A997, ML19289F192, ML19290G682, ML19290G684, ML19294B198, ML19296B603, ML19305C421, ML19305C425, ML19309C609, ML19310A216, ML19312E060, ML19316B059, ML19318D060, ML19321B061, ML19321B275, ML19321B278, ML19321B279, ML19321B280, ML19323G448, ML19323G697, ML19323G716, ML19323G721, ML19323G724, ML19327A031, ML19327A034, ML19330A930, ML19330B134, ML19330B221, ML19330B773, ML19331C780, ML19332A973, ML19339C903, ML19339C906, ML19340D089, ML19340D375, ML19340D378, ML19341D543, ML19343A468, ML19343B697... further results | |
| From | |
MONTHYEARML20150A6581978-09-21021 September 1978
[table view]Order Re Responses to NRC Interrogatories by Coalition for Safe Pwr & Consolidation.Cfsp Must:Respond W/In 14 Days to S1,S2,E1,G1,G2,G3,G8 & All Other Interrogatories;Clarify the Status of Spokesmen.Motion for Reconsideration Is Denied ML20062C1421978-10-11011 October 1978 Notice of Evidentiary Hearing on Issue of Interim Operation & Limited Appearance.Hearing to Determine Whether Interim Operation Should Be Permitted Prior to Mods Required by Order Will Be Held on 781023 & 1030-1101 ML20062D3481978-11-0606 November 1978 Cross-examination or Testimony Re Analysis & Review by Licensee Poge of safety-related Matls in Control-Auxiliary- Fuel Bldg Complex Will Be Taken at 781211 Hearing.Nrc Given Time to Reply to Interrogs.Proposed Findings Due 781120 ML19261A6871979-01-30030 January 1979 Intervenors Are to File Contentions by 790226 & Close Discovery by 790328,after Which Evidentiary Hearing Re Phase 2 Issues Will Commence ML19261C3481979-03-0808 March 1979 Notification of Prehearing Conference in Portland,Or,On 790329-30 Re Phase II Control Bldg Proceeding.Conference Will Consider Intervenors Contentions,Scheduling Matters & Status of NRC Review of Mod ML19289F1921979-04-12012 April 1979 Confirms Action Taken During Prehearing Conference,Phase II, Re Contentions of Coalition for Safe Power & Consolidated Intervenors.Directs Intervenors to Give Fuller Responses to Interrogatories.Adopts Phase II Schedule ML19248C9341979-06-0505 June 1979 Grants Limited Continuance to Hearing Schedule Established in ASLB 790412 Order.Definite Date for Commencement of Hearings Will Be Set When NRC Has Completed Ser.All Parties Will Continue Discovery on Matters Not Related to SER ML19225A2941979-06-15015 June 1979 Order Directing Consolidated Intervenors & Coalition for Safe Power to Respond Promptly to NRC 790515 Second Set of Interrogatories.Order Relates to NRC 790614 Request ML19249D6781979-07-26026 July 1979 Orders Revised Schedule for ASLB Re Phase Ii.Nrc Will Issue SER by 790907.Written Testimony & Discovery Requests Re SER Are Due to 790921.Evidentiary Hearing Commence on 791010 ML19209B2411979-07-27027 July 1979 Order Consolidating Intervenors N Bell & Consolidated Intervenors W/E Rosolie & Coalition for Safe Power ML19209D0561979-09-0505 September 1979 Notice of 791010-26 Evidentiary Hearing to Be Held in Portland,Or.Will Address Phase II Issues Stated in ASLB 790526 Order for Mod of license,43FR23768 ML19254D1311979-09-12012 September 1979 Notifies of 790920 Hearing in Bethesda,Md,On NRC 790906 Motion to Postpone Phase II Evidentiary Hearing Scheduled for 791010 in Portland,Or ML19209D0511979-09-18018 September 1979 Order Vacating NRC 790906 Motion to Postpone Hearing,Denying Intervenors 790913 Motion for Change of Venue & Granting State of or & Intervenors Motion for Extension of Time to Respond to Licensee Motion for Summary Disposition ML19254D1771979-10-11011 October 1979 Order Denying Licensee 790927 Motion for Clarification of ASLB 790918 Order.Order,Granting Extension to State of or to Respond to Licensee Motion for Summary Disposition,Based on Actual Delay in SER Issuance & Filing ML19254F1781979-10-17017 October 1979 Order Ruling on NRC 790806 Motions for Reconsideration of ASLB 790727 Order Consolidating Intervenors & on Motions Re Intervenors Response to Discovery.Denies Majority of Motions ML19253C7271979-11-30030 November 1979 Modifies ASLB Partial Initial Decision Permitting Interim Operation of Facility.Operation Will Not Resume Pending Further Order.Nrc Shall Inform ASLB of Unresolved Items Re Seismic Issues ML19260C5911979-12-12012 December 1979 Notice of 791228 Public Hearing Re Seismic Considerations & Interim Operation Motions & Orders ML19296B6031980-02-0707 February 1980 Notice of 800331 Evidentiary Hearing on Phase II of Control Bldg Proceeding Re Safety of Mods.Hearing Will Be Held at Court of Appeals Courtroom,Portland,Or & May Continue on 800416 at Bonneville Power Admin Auditorium.W/Svc List ML19305A7511980-02-0808 February 1980 Corrections to Transcript on 791229 Meeting in Portland,Or Hearing Re Control Bldg ML19294B1981980-02-20020 February 1980 Memorandum & Order Reminding Parties That Written Testimonies Shall Be Filed in Question & Answer Form.Expert Witnesses Shall Not Present Prof Objectivity Except During Counsel Cross Examination or ASLB Questioning ML19312D7611980-03-17017 March 1980 Forwards NRC Testimony of F Clemenson & Je Knight Re Mod Work Effects,Ks Herring & D Persinko Re Coalition for Safe Power Contentions 20,12/13 & 16 & CM Tramwell Re Railroad Spur & Safety Evaluation Authors ML19309C6091980-03-20020 March 1980 Order Re 800311-12 Prehearing Conference,Phase II of Control Bldg Proceeding,Held in Portland,Or.Licensee Motion for Summary Disposition of Contention 3 Granted.Interim Operation Will Constitute Issue in Evidentiary Hearing IR 05000344/19800041980-03-20020 March 1980 IE Insp Rept 50-344/80-04 on 800201-29.No Noncompliance Noted.Major Areas Inspected:Plant Operations,Maint,Physical Security,Refueling Preparations & Procedures ML19305C4251980-03-24024 March 1980 NRC Testimony Re Structural Adequacy of Proposed Control Bldg Mods.Presents Basis for Requiring Mods,Position Re Interim Operation & Assessment of Structural Adequacy ML19305C4211980-03-24024 March 1980 Forwards NRC 800324 Testimony of Ks Herring & D Persinko Re Structural Adequacy of Proposed Mods,Served on All Parties & Intervenors Per 800311 Prehearing Conference Agreement ML19316B0591980-05-0707 May 1980 Proposed Findings of Fact & Conclusions of Law Re Design Mods for Control Bldg.Mods Should Be Permitted Per Amend to OL Restoring Intended Design Margins of Revised Tech Spec 5.7.1 ML19305E7791980-05-19019 May 1980 Proposed Findings of Fact & Conclusions of Law on Mod to Control Bldg.Urges ASLB to Permit Mods Subj to Terms & Conditions Amending OL Per Encl Proposed Draft Order. Certificate of Svc Encl ML19323G7161980-05-19019 May 1980 Forwards State of or Proposed Findings of Fact & Conclusions of Law Re Design Mods for Facility & Memo of Points & Authorities in Support of State of or Proposed Findings of Fact & Conclusions of Law ML19323G7241980-05-19019 May 1980 Memo of Points & Authorities in Support of State of or Proposed Findings of Fact & Conclusions of Law.Proposed Findings Are Intended to Increase Likelihood That Mods to Facility Will Meet Seismic Safety Stds ML19323G7211980-05-19019 May 1980 State of or Proposed Findings of Fact & Conclusions of Law Re Design Mods for Facility.If Proposed Findings Are Included by ASLB in Initial Decision,State of or Will Concur W/Proposed Licensee Findings & Conclusions ML19323G4481980-05-22022 May 1980 Order Instituting Corrections to 800331-0403 & 0416-17 Evidentiary Hearing Transcripts.Pp 3,640-4,828.W/Certificate of Svc ML19323G6971980-05-29029 May 1980 Response to NRC & State of or Proposed Findings of Fact & Conclusions of Law.Reporting Requirement Will Detract from Other Licensee Responsibilities & Should Not Be Imposed.Nrc Agrees to Footnotes 2,3 & 4.Certificate of Svc Encl ML19312E0601980-05-30030 May 1980 Admits & Corrects Error in NRC 800519 Proposed Findings of Fact & Conclusions of Law on Control Bldg Mod,Stated in Footnote 34 on Page 134 ML19310A2161980-06-0202 June 1980 Order Requesting Licensee to Supply Affidavit Re Licensee 800519 Rept on Discovery of Inadequate Connection in Auxiliary Bldg Wall.Cause of Occurrence & Other Related Matters Should Be Identified.Certificate of Svc Encl ML19318D0601980-06-28028 June 1980 Submits Revised Criteria to Be Used in Analysis of out-of- Plane Behavior of Heavyweight Double Wythe Masonry Walls. Includes All Masonry Walls Having Safety Significance.All Masonry Walls Will Comply W/Revised Criteria by 801031 ML19330A9301980-07-11011 July 1980 Initial Decision Modifying OL Immediately.Exceptions May Be Filed within 10 Days,Briefs within 30 Days & Supporting or Objecting Briefs within 30 Days of Original Briefs.Decision Shall Constitute Final Action within 45 Days ML19321B2751980-07-23023 July 1980 Forwards Motion for Reconsideration of Initial Decision, Memorandum of Points & Authorities in Support of Motion for Reconsideration & Proposed Findings of Fact & Conclusions of Law Re Design Mods for Control Bldg ML19321B0611980-07-23023 July 1980 Forwards NRC Motions for Extension of Time to File Exceptions to ASLB 800711 Initial Decision & Other Related Requests.Nrc Will Issue License Amend Per ASLB Order Issued W/Initial Decision Due to Desire to Restore Seismic Margins ML19321B2781980-07-23023 July 1980 Memorandum of Points & Authorities in Support of Motion for Reconsideration of Initial Decision.Decision Does Not Discuss Issues Raised in State of or Proposed Findings of Fact & Conclusions of Law.Certificate of Svc Encl ML19321B2801980-07-23023 July 1980 Memorandum of Points & Authorities in Support of State of or Proposed Findings of Fact & Conclusions of Law.Findings & Conditions Proposed by Appellant Will Increase Likelihood That Mods Will Meet Seismic Safety Stds ML19321B2791980-07-23023 July 1980 Proposed Findings of Fact & Conclusions of Law Re Design Mods for Control Bldg.If ASLB Will Include Proposed Suppls & Additions in Initial Decision,Appellant Will Concur in Licensee Proposed Findings & Conclusions ML19330B1341980-07-24024 July 1980 Order Granting Extension of Date for Filing Exceptions to ASLB 800711 Initial Decision Re Mods to Control Bldg. Executive Legal Director Requested to Remind Staff of Necessity for Compliance W/App a Requirements ML19330B7731980-07-25025 July 1980 Amend 47 to License NPF-1 Permitting Proposed Mods to Control Bldg & Consisting of Tech Spec Changes ML19330B7891980-07-25025 July 1980 Notice of Issuance of Amend 47 to License NPF-1 ML19330B7621980-07-25025 July 1980 Forwards ASLB 800711 Initial Decision Re Control Bldg Mods, Amend 47 to License NPF-1 Consisting of Changes to Tech Specs & Notice of Issuance of Amend to Facility OL ML19330B2211980-07-28028 July 1980 Order Authorizing ASLB to Act on Merits of State of or Motion for Reconsideration of ASLB 800711 Initial Decision. State of or Supporting Brief on Exceptions Is Tolled Until 10 Days After ASLB Rules on Motion ML19327A0311980-07-29029 July 1980 Response to NRC Motion for Clarification of ASLB 800711 Initial Decision Re License Condition on Control Bldg Mod. Does Not Object to Including NRC & Licensee Proposals in Condition 2.C.11 ML19327A0341980-07-29029 July 1980 Response to State of or 800723 Motion for Reconsideration of Initial Decision.If Addition of Discussions Determined,Basis for Elaboration Is Set in Licensee 800529 Response to NRC & State of or Proposed Findings of Fact.W/Certificate of Svc ML19351D8341980-07-31031 July 1980 Rept on Criteria & Methodology for Evaluation of Out-of- Plane Loading on Masonry Walls at Trojan Power Plant ML19271A9971980-08-0707 August 1980 Order Granting Extension Until 800818 for NRC to Respond to State of or 800723 Motion for Reconsideration of Initial Decision Issued in Control Bldg Proceeding.Certificate of Svc Encl 1980-02-07 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:13152&oldid=5491757"