R*.v. 3 3/23/7s k* .

  • ,  ? ' em

/

Document Section NFORM ATION ONL N C. R. Nuclear .

SURVEILLANCE PROCEDURE SP-670 FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3

( REACTOR BUILDING FUEL HANDLING BRIDGES (FHCR-1 & 2) LOAD TEST

{c'et5" M kh ,,

a- / N .. r.~,

~~^

- -s/ts/77 i

REVIEWED BY: Pla Rev e

~

h/ J Committ, Date )

Meeting No. ['/

APPROVED BY: Nuclear Plant Manager i

f 9AfS S&e4* U 8 0 0313 o (Q> Date 9, / i r, / 7 r

1.0 SURVEILI.ANCE REQUIREMENTS The reactor building (RB) fuel handling bridges shall be demon-strated OPERABLE by performing-load capacity and load in'terlock l

tests. The demonstrations shall be performed during the modes  !

I

-and at the frequencies indicated below.  ;

l 1.1 TECHNICAL SPECI!! CATIONS REFERENCE Technical Surv. Req'd. Mode Surv. Freq.

Specification During Modes Notes Freo. Notes

.- 4.9.6 .

6 R 18 MODE NOTES: None SURVEILLANCE FREQUENCY:

R - Refueling (18 nonths)

FREQUENCY NOTES:

18 - Within 100 hrs. prior to movement of control rods or

(

fuel assemblies within the reactor pressure vessel.

2.0 ACCEPTANCE CRITERIA ,

2.1 ' Each R3 fuel handling bridge shall be OPERABLE with:

2.1.1 A hoist minimum capacity of 3,000 lbs., including weight of grapple tube, and 2.1.2 An automatic hoist overload cut-off limit of 2750 lbs. (wet)

~

or 2880 lbs. (dry), including weight of grapple tube.

NOTEi If the above acceptance criteria cannot be met, refer immediately to the " Action Statement" of Technical Specification (TS) 3.9.6.

3.0 REFERENCES

NEEDED TO DO PROCEDURE 3.1 Data Sheet I (Enclosure 1) 3.2 FP-601, Fuel Ha ' ling Equipment Operations Page 1 SP-670 Date 3/23/78 Rev. 3

i 4.0 SPECIAL CONDITIONS OR REQUIREMENTS I 4.1 During lifts to =4n4=n= loads or overload settings, do not exceed the expected load values by more than approximately 100 lbs; if automatic overload actuations do not occur do not

. proceed with Surveillance Procedure. Notify the Shift Supervisor.

5.0 EQUIPMENT REQUIRED None 6.0 PROCEDURE -

6.1 Demonstrate the OPERABILITY of the Mais Fuel Handling Bridge (FHCR-1) by performing the following steps:

6.1.1 Startup FHCR-1 in accordance with the startup procedure in FP-601, Fuel Handling Equipment Operation.

6.1.2 Place the main fuel hoist Dillon load cell range switch in position "A" (0 to 3000 lbs.) .

6.1.3 Position the main fuel handling grapple over the load testing fixture.. To position the auxiliary fuel handling grapple over the test fixture, the bridge left and trolly interlock bypass must be actuated.

6.1.4 Lower the main fuel handling grapple and engage the mating fitting on the test fixture. Visually check for proper engage-ment of grapple with test fixture.

l 6.1.5 . Slowly raise the main fuel handling grapple, using the "Jeg" button, until the hoist stops and the red " Overload" indicator light comes on. Record the fuel Dillon readout on Data Sheet I.

l- CAUTION: The overload cut-of f should actuate at or before reaching 2750 lbs. Do not exceed 2800 lbs.

Page 2 SP-670 _ _ _ _ _

Date 12/9/76 _

6.1.6 Slowly-lower the main fuel handling grapple until the fuel Dillon readout indicated approximately 2000 lbs.

6.1.7 Place the main fuel hoist Dillon load cell range switch in position "B" (3,000 to 6,000 lbs.).

6.1.8 Place the main fuel hoist' overload bypass switch in the "On" position.

6.1.9 Slowly raise the main fuel handling grapple, using the "J0G" button or manual handwheel, until the fuel Dillon readout indi-cates a load of 3050 t'o 3100 lbs.

Record the reading on Data Sheet I.

6.1.10 Lower the main fuel handling grapple to less than 3000 lbs. using the manual handwheel (grapple will not lower with jog button due to low load interlock being actuated by range switch in "B" position) then use jog button and disengage the test fixture visually verifying the disengagement.

6.1.11 Raise the main fuel handling grapple. Return the fuel hoist overload bypass switch to the "Off" position. Return the fuel hoist Dillon load cell range switch to the "A" (0 to 3,000 lbs.) position.

l i .

6.1.12 Complete the applicable section of the reactor building bridges log shttt attached to the bridge consoles.

Page 3 SP-670 Date 12/9/76 Rev. 2 ._

6.2 Demonstrate the OPERABILI1T of the Auxiliary Fuel Handling Bridge FHCR-2 by performing the following steps:

6.2.1 Startup FHCR-2 in accordance with the startup procedure in FP-601, Fuel Handling Equipment Operation.

6.2.2 Repeat Steps 6.1.2 through 6.1.11 except for the auxiliary fuel handling hoist, recording appropriate data on Data Sheet I.

6.2.3 Complete the applicable section of the reactor building bridges log sheet attached to the bridge consoles.

6.3 Return both FHCR-1 and FHt'2-2 bridges to their normal park locations and then, if applicable, shut'down both bridges in accordance with FP-601, Fuel Handling Equipment Operation.

6.4 No restoration is required.

6. 5 Notify the Shif t Supervisor of the completion and results of this Surveillance Procedure.

Page 4 SP-670 Date 5/21/76 Rev. 1 v --

T

ENCLOSURE 1

' ' 5. . SP-670 DATA SHEET I

\

l l

REACTOR BUILDING FUEL RANDLING BRIDGES (FCHR-1 & 2)

LOAD TEST TEST EQUIPMENT NO.

NONE ACTUAL ITEM REQUIRED FHCR-1 FHCR-2 Dillon Fuel load cell range switch placea in position "A" Fuel load cell reading at overload actuation, lbs. < 2750

  • Dillon Fuel load cell range switch placed in position "B" Fuel hoist overload bypass switch placed in position. "On" Fusi load cell reading at =inimum lift capacity, lbs. 2,3000 el hoist overload bypass switch placed in position "Off" Dillon Fuel load cell range switch placed in position "A" Rod load cell reading with du=my rod lifted clear C010ETIS:

PERFORMED BY: DATE:

0When handling control rods or fuel assemblies with 3,23 feet of water over the top of fuel assemblies seated in the reactor core; otherwise the hoist overload cutoff shall be set at 2880 lbs, including the weight of grapple tube.

Page 5 '

-SP-670 Date 12/9/76 Rev. 2