mev. 24 g/21/7@

]

~

e.... .ll j l

i 1

l l

. Document Section L FORM ATION ONL N C. R. Nuclear ~ .

SURVEILLANCE PROCEDURE SP-531 FLORIDA PORER CORPORATION CRYSTAL RIVER UNIT 3

. SPENT FUEL HANDLING 3 RIDGE INTEPl.0CK SURVEILIX;CE

~

U: 5ba150-2)0A!! . 7D. M

- ' g[.yb(. d:p~.

DEVIEh'ED PY: P!  : 0 :- :.- O . .'  :

' r

/~hx.A if / f5 % CC Date b!-ll l]{C

/ 1 Meeting No. k[ -I I APPROVED BY: Nuclear Plant Superintendent

//> Chu 8008130 [YO "

h f -

t 1.0 SURVEILLANCE REQUIREMENTS

/. Spent-fuel bridge and trolley interlocks and physical stops shall be demonstrated OPERABLE within seven days prior to fuel handling operation e= ploying FHCR-3 and at least once per seven days during operation.

1.1- REQUIREMENTS REFERENCE Surv. Req'd. Mode Surv. Freq.

Reference During Modes Notes Freq. Notes FPC Practice - 1 thru 6 42 W 40 Surveillance Frequency: W - Weekly (seven days)

Mode Notes: 42 - Bridge in use. I

. Frequency Notes: .40 - Establish prior to ascension into appli-  ;

- cable mode (prior to putting bridge in use).

2.0 ACCEPTANCE CRITERIA cm em 9 D D l Successful completion of this procedure. ni es JLi 3.0 i'EFERENCES NEEDED TO DO PROCEDURE A

~FP-601, Fuel , Handling Eculpment Operations S .S.1 a 4.0 SPECIAL CONDITIONS OR REOUIREMENTS Refer to FP-601, Fuel Handling Equipment Operations. When verifying wall limit interlocks, attentior. should be given to very slow movement of bridge or trolley.

5. i) EUC I I'MI ST ' : TI!U:1)

Re: er to ! '-n01. Fue L tlandling Equipm n:. Ope ra t t en.. .

6.0 ' PROCEDLTRE Refer to Enclosure 1. I s.

6.1 Position bridge at SFA-DS.

Page 1: SP-531 Date 2/13/76

.Rev. l' .

6.1.1 Run bridge right until it stops (IS-5 bridge right end stop) and verify that:

6.1.1.1 Bridge will not run right..

6.1.1.2 Bridge will move left.

6.1.1.3 Trolley vill run forward and reverse.

^

6.1.2 Run trolley forward until it stops (LS-19 transfer valve #2 protection) and verify that:

6.1.2.1 Bridge will not move left or right.

6.1. 2. 2 . Trolley will. move teverse.

6.1.3 Run trolley reverse until it stops (LS-19 transfer valve #1 protection) and verify that:

6.1.3.1 Bridge vill not move left or right.

6.1.3.2 Trolley will move forward.

6.2 Position bridge at SFA-DS.

6.2.1 Run trolley reverse to transfer carriage #1 (scale index "X").

6.2.2 Run_ bridge right until it stops (LS-18) ind verif1. that bridge will not nove lef t or right and trolley will r.et ::ve :: verse.

6.2.3 Move trolley forward to scale index "A" and verif:- :ha: bridge wi.1 cova right and lef t and trolley ih nevs : rvar: u reverse.

D Iok]JU ~

D SII v l. . J l

.b Page 2 SP-331 Date 5/21/76

i. Rev. 2 E _ _

6.3- Position bridge at SFA-D8.

_j 6.3.1 Run trolley forward to transfer carriage #2 (scale index "Y").

6.3.2 Move ridge right until it stops (LS-18) and verify that bridge will'not cove right oc left and trolley will not cove forward.

6.3.3 Move trolley reverse to scale index "H" and verify that bridge will move right and left and trolley will move forward and reverse.

6.4 Move bridge left until it stops (LS-9 center wall left li=it)

. and verify that:

6.4.1.1 Bridge'will not move left.

6.4.1.2 Bridge will move right.

6.4.2 Trolley will forward and reverse.

6.5 ' Move trolley forward until it stops (LS-19) and verify that bridge will not move right or left.

6.5.1 Move trolley slightly reverse.

6.5.1.1 Move bridge right to row "14".

6.3.1.2 X:ve trolle5 forward to cunper stop.

6.5.1.3 Move trolley slightly reverse.

-6.5.1.4 2 McVe bridge left until it .= tops (LS-18) an vsrif : hat ': ridge will not move right or left and trolley will n:t nove forward.

6.5.2 Move trolley reverse to scale index "H". l l

6.5.2.1 Move bridge right to row "14".  !

1 7o m '

D DJ

<v JL yu Ti 9 T

. . 2 l

Page' 3 SP-531 Date 5/21/76

. Rev. 2

'6.5.2.2 Move trolley reverse to- bu=per stop.

( 6.5.2.3 Move trolley slightly forward.

6.5.2.4 Move bridge left until it stops (LS-18) and verify that bridge will not move right or lef t at.d trolley will not =ove reverse.

6.5.3 Move trolley forward to scale index "A".

6.5.3.1 Move bridge left until it stops (LS-9).

6.5.3.2 Move trolley reverse until it stops (L5-19) and verify that bridge will not move right or left.

6.6 Move t:olley forward until it stops {LS-10) and verify :ha::

i 6.6.1 Trolley will not move forward or reverse.

l 6.6.2 Bridge will move right or left.

i 6.7 Position trolley on centerline of center gate (scale inden  !

"Z").

NOTE: Bridge may have :o be moved right to clear LS-9, then e

=ove the trolley forward to*"Z". I 6.7.1 Move b' ridge left until it stops (LS-12) and verify :ha: bridge will not move left or righ:.

NOTE: The trolley can ei:her move forward until i: s::;s ar:und

""" and no fur:..er .:vemen:s can be .;dc rr et r c. rs; until it stops around "F" and no further :: c- nunts .--

be made.

6.7,2 Bypass bridge right in:erlock (TS-4).

-6.7.3 Nove bridge right to ::w "30".

6.7.; 8eturn bridge right bypass interlock (TS-4) .a""- c 81- ..

6.5  !.we :rolley t'orward :: :=nterline of ea a . .....- - '- :s index "W"). 1 0 'S T D W LL r

' .gl I3 Ju us Rut @!]u Ji i b:

Page.4 SP-531 Date 2/13/76 Rev. 1

.6.8.1 Move bridge left until mast is in the entrance of cask area f

(between LS-12 and LS-21) and verify that trolley will not move forward or reverse (LS-13).

6.8.2 Move bridge left until it stops (LS-6 bridge left end limit) and verify that:

6.8.2.1 Bridge will not move left.

6.8.2.2 Bridge will move right.

6.3.2.3 Trolley will move forward and reverse.

6.8.3 Move trolley forwa'rd to' bumper stop.

6.8.4 . Move trolley reverse until it stops (LS-20 trolley stop at

- cask inner wall). Trolley will not cove forward or reverse.

6.8.5 Move bridge right until it stops (LS-21 cask area right wall limit) . Bridge will not move right or left.

NOTE: Trolley interlock bypass required to move trolley for-ward to clear LS-20 interlock.

CAFTION: Do not move troll _ey in reverse!

6.8.6 Bypass trolley interlock (TS-5).

6.8.7 Move trolley forward to centerline of cask loading. door (scale index "W").

6.8.8 Return trolley bypass interlock to "Off" pesi: ion.

6.9 Move bridge right until it stops (LS-11 center wall right limtt) and verify that : 1 0

9 0 6.0.1 Trolley will move forward and reverse. Ls Cb ,

qi F 6.9.2 Bridge will move Left.

QFl}( U Lu us y d J JL 6.9.3 Leidge will not : . ve right.

6.10 Move bridge left to clear LS-11 (SFB-W22).

~6.10.1- Move trolley reverse to scale index "E" (LS-13 centerline of new fuel elevator).

Page 4a SP-531 Date S/21/76 Rev. 2

6.10.2 Raise elevator to full "Up" position.

/*

6.10.3 Move bridge.left u'ntil it stops and verify that:

6.10.3.1 Trolley will not move forward or reverse.

6.10.3.2 Bridge will. move right.

6.10.3.3 Bridge will not move left.

6.10.4 Lower the new fuel elevator to the full "Down" position.

< 6.10.5 ' Move bridge'1 eft to position directly over the new fuel elevator; bridge and bumper touching but not compressed. Verify that:

6.10.5.1 Trolley will not m've o forward or reverse.

6.10.5.2 New fuel elevator will not raise.

6.10.6 Move bridge right to SFB-E30 (LS-12 clears).

6.10.7 Move trolley reverse to SFB-C30.

6.10.6 .Run bridge left until it stops (LS-9 bridge left wall limic).

6.10.8.1 Bridge will not move left.

6.10.8.2 Bridge will move right.

6.10.? P.m trolle- forward until it stops " -20) and verif" that trolley will not move forward or reverse.

6.11' Move bridge right until it stops (LS-11).

6.11.1 . Move trolley forward until it stops (L5-10) and verify that:

6.11.1.1 Trolley will not move forward or reverse.

6.11.1.2 Bridge.will cove right or left.

6.12 Position trolley on centerline of c:nter gate (scale index "~.").

- WT':: Bri,'pe may itave to be noved '.ef t to clear LS-10. the.

move tiie tralley forward to .

Move bridge to SFA-DS.

D 6.13 , g l' 6.14 No restoration is required. O T a l' Completeapplicablesection'oftheSpentFue)h'an{~

Mdge 6.15 Log Sheet attached to bridge console.

Pagc 5- 'SP-531 .Date 5/21/76 Rev. 2

w . .,

6.16' Up'on completion of this proce* dure,' notify the'Shif t Supervisor-

j. ' and enter the results.in the Control Center Log.'-

P i

1 l

I l

1 l

~

s Pase 5a . SP-531 Date 5/21/76-Rev. 2-

w

'LS-13 (IIYR)

Closed LS-18 (PVR) LS-18 (PVR)

Open on Cam Open on Cam

/j Bumper LS-21 (CAR) l . St'op

. A Clo::c.t .;'h open l ytj y_ V LS-19 (VAR) l . .

Open

, l

. e i  :

8

-( g 4 ' - -- I J]- ~ E-

~ Irea~ iQ~ -l ~ ' ~ . e'fransfer Basket #2 '

"y-LS-20-(FRR) l 1.S-10 (GPR) Closed

~

l VN Transfer.

e ,,n,, P001, , s

..A.. POOL Fortiard Closed Valve #2' Open on Cam p - .

_ , .s - -. , , ,

N l

  • s _.*

.p Left<- c> Righ t 8 -

8 LS-5 ~

p LS-6 ' LS-14 (PCL), "'

  • Open Open l1- --

Y 8

M ' -- ' s, Opjn lf LS-9 (LIIL) Reverse

' ',~~"'----

y--- T /- ---Open--------------r-----

Elevator - ,

Closed LS-19 (VAR)

Closed

[ }i e 9

Open LS-9_(LWL) 's g  ;/,b iTransfer nasket #1- g - - =

' - ' Y-I,A-Open on Cam l lN-II (I:llI.) i

~ '- - - - -

t< --

ljl , f O p. n . _- " l .' t _ _Y__

g 7

""'*# Open< N Cloucil . \ Transfer I.S- 12 (DY.R) Clone.l tj>0 pen y Valve #1

. l.S-23 Bumper Stop PLAN VIEL' ELECTRICAL INTERLOCKS SPENT FUl:1. P001.IIANDLING BRIDGE gg (FitCR-3) g p a o un H c:

O m

h w

Page 6 S P- 5'l l. thte 5/21/76 $

I:e v . 2 ,

ENCLOSURE 1 (Pcg2 2 cf 2)

, LIMIT SWITCHES AND RELAY TITLES f

LIMIT SWITCHES LS BRIDGE AT RIGHT END LIMIT LS ERIDGE AT LEFT END LLMIT LS MIDDLE WALL LEFT LD1IT LS MIDDLE GATE CENTERLINE LS MIDDLE WALL RIGHT LD11T LS CASK LEFT TRAVEL WALL LU!IT LS CASK DCOR CENTERLINE AND NEW. FUEL ELEVATOR CENTERLIN -

. l LS PERMISSIVE TO CASK LOADING AREA LS BRIDGE PERMISSIVE AT " VALVE AREA LS TROLLEY STOP AT VALVE AREA i

LS-20 . TROLLEY STOP AT CASK INNER WALL i LS-21 ~ BRIDGE / TROLLEY PERMISSIVE IN CASK AREA RELAYS F5L - MIDDLE WALL RIGHT LI;;IT RELAY LWL - MIDDLE tiALL LEFT LD:I! RELAY CR - SR: JE/TKOLLEY PERM:. .?!'lE I:; CASK AREA FRR - TROLLEY STOP AT CASK INNER tiALL DXR - CASK LEFT WALL LIMIT RELAY .

WYR - CASK-DOOR CENTERLINE RELAY PCL - CAS. L0A.n:;G ;'EIUf18.4 TIE PYR'- BRIik:F PER !ISSIVE AT VALVE A*CA G'.'R - ll M.L GA;ii i'LRMISS . . :. RELA':

VAR - TROLLEY STOP LN VAL'iE AREA

. l i

'Page 7 SP-531- Date 2/13/76 Rev. 1

ENCLOSURE 2 (Pcg3 1 of 2)

- DATA SHEET I -

7 SFENT FUEL HANDLING BRIDGE INTERLOCK SURVEILLANCE Procedure Steo Action Date/ Initials 6.1.1.1 Bridge will not move right (LS-5).

6.1.2.1 Bridge will not move (LS-19).

6.1.2.2 Trolley will only move reverse (LS-14).

6.1.3.1 Bridge will not move (LS-19).

6.1.3.2 Trolley will only move forward (LS-14)' .

6. 2. 2
  • Bridg& will not move (LS-18).
  • 6.3.2 Bridge will not move (LS-18) .

6.4.1.1 Bridge will not cove left (LS-9).

~~

6.5 Bridge will not move (LS-19). '!

. 2 '

6.5.1.2 Trolley will not move forward (bumper stop).

6.5.1.4 Bridge will not move (LS-18). .

6.5.2.2 , Trolley will not move reverse (bu=per stop).

6.5.2.i 3 ridge will not r.re (LS-18). ,_, , _ _ _ _ ,

6.5.3.2 Bridge will not cove (LS-19)'.

6.6.1 Irolley will not move (LS-10).

o.7.1 Bridge will ' no t move (LS-12) .

6.8.1 Trolley will not cove (LS-13).

i 6.8.2.1 Bridge will not cove left (LS-6).

l 6.S.3 T rolloy v'11 not . eve forctard (Su=per stor).

o.8.4 7" alley te!!! not :ove (LS-201 n.S.5 -idge wil; not nave (LS-21).

n.9.3 aridge will not move right (LS-11). _

Page 8 SP-531 Date 5/21/76 Rev. 2

- . = - . . - - -_

(Peg 2 2 of,2)

DATA SHEET I'(Cont'd) r SPENT FUEL HANDLING BRIDGE INTERIDCK SURVEILLANCE Procedure Step Action Date/ Initials 6.10.3.1 Trolley will not move (LS-13).

6.10.3.3 Bridge will not move lef t (fuel elevator per-missive).

6.10.5.1 Trolley will not move (LS-13) .

6.10.5.2 Elevator will not raise (LS-12 and LS-20).

6.10.8.1 'B idge will not cove lef t (LS-9).

6.10.9- Trolley. will not move (LS-20) .

6.11.1.1 Trolley will not move (LS-10). '

3

('

CC:0ENTS: