LER 80-034/01T-0:on 800307,S&W Discovered That Several Class 2 Lines in Low & High Head Safety Injection Sys Were Not Stress Analyzed for Fluid Temp.Caused by Deficiency in Piping Sys Stress Analysis
ML19312D482
Person / Time
Site: North Anna Dominion icon.png
Issue date: 03/21/1980
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19312D477 List:
References
LER-80-034-01T, LER-80-34-1T, NUDOCS 8003240473
Download: ML19312D482 (2)


Text

CRC FORM 366 U. S. NUCLEAR REIULATGY COMMISSION

  • (777) *

,r7 LICENSEE EVENT REPORT

/

CONTROL CLOCK: l 1

l l l l l lh 6

(PLEASE PRINT OR TYPE ALL REOUIRED INFORMATION) 57 CAT 68l@

l lO l 8i 9l l VlLICENSEE 7

Al NlCODE Al Sl 1l@l 0l 0l -l 0lLICENSE 14 15 0l 0l 0l 0l -l 0l 0l@l NUMtlER 25 4 l 1l 26 1 l 1l LICENSE TYPE 1l@l 30 CON'T 101il Sg a

y lL ]@l 0l 5l 0l 0l 0l 3l 3l 8l@l 68 0l 3lEVENT 69 Ol DATE 718l 01@l 14 013121118 75 REPORT DATE l O80l@

7 -8 60 61 DOCKET NUMB ER EVENT OESCRIPTION AND PROBABLE CONSEQUENCES h 10121 - l On March 7, 1980, Stone & Webster discovered that several Class II (02) lines in the 1 0 3 'l low and high head safety injection system have not been stress analyzed for fluid temp}-

O 4 l eratures which could be expected during the injectior; phase of the Emergency Core Cooll-O s l ing System. The health and safety of the general public were not affected by this l 0 s l occurrence. Reportable pursuant to T.S. 6.9.1.8.h. l 0 7 l I 101811 I E CODE S BC E COMPONENT CODE SUS O'E S E 7

O 9 8

l Sl Fl@ J@ W@ l Pl Il Pl El Xl Xl @ J h W @

9 to 11 12 13 18 19 20

_ SEOUE NTI AL OCCUR R ENCE' ~ REPORT REVISION LER/RO EVENT YEAR REPORT NO. CODE TYPE N O.

@ ,Rg l218l0l

_ 22 9

23 l 0l 3l 4l 24 26 y

27 l 0l 11 N M W30

[.-j 38 LOJ 32 K N AC ON PL NT ME HOURS SB IT FORI S. SUPPL 1 MAN F CTURER lXlggg g 33 34 35 g [36Z j@

l 0l q q 0l 3/ 40 O@ B@ yg 44 42 43 l Sl 2l 8l 0[@

44 47 CAUSE OESCRIPTION AND CORRECTIVE ACTIONS g l The event occurred as a result of a deficiency in the piping system stress analysis. I i i l The af fected piping is being re-evaluated to determine what modifications, if any. to 1

, 7 l existing pipe supports are required to ensure that the original system design criterial i 3 l a re me t. l i 4 l l

'7 8 9 80 SYA S  % POWER OTHER STATUS DIS O Y DISCOVERY DESCRIPTION i s ]@l ]l 0 l 0 l@l NA l l Bl@l Notification from A/E l A TlVITY C$ TENT RELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATIO'N CF RELEASE i s NA l l NA l LZJ @ 'lz_l@l " *

  • ,ERSON~a Ex,OSSES Nuu.ER Tv,E oESCR , TION @

"A i 7 l 010101@Lzl@l I i

PERSONN E L INJU IES NuM ER 7-i s 8 9 1010101@lOESCRiPnON@

11 12 NA 80 l )

LOSS 08 OR OAMAGE TO FACIL?TY 43 TYPE DESCRIPTION 8008240 '

.i i i

7 i 9 8 9 lzl@l 10 NA l 80 l 2 0 - ISSUFl @OE NA CRIPTION l lllllllllllllj 7 8 9 to 68 63 80 5 NAME OF PREPARER t.7 D Neemfp+ PHONE: (703}o6 M 151

Virginia Electric and ' Power Company

. North Anna Power Station, Unit #1 Attachment, Page 1 of 1 Docket No. 50-338 Report No. LER 80-034/01T-0 Description of Eve-t On March 7,1980, Stone & Webster discovered that several Class II (Q2) lines in the low and high head safety injection system have not been utress analyzed for fluid temperatures below 70*F. The subject lines transport water from the Refueling Water Storage Tank to the Reactor

~

Coolant System cold legs during the injection phase of the Emergency Core Cooling System, and, as such, can be exposed to fluid temperatures in the 40-50*F range. Th'c resulting pipe wall temperatures below 70*F could create limits on equipment and pipe supports which have not been previously analyzed.

Probable Consequences of Occurrence With piping handling water temperatures less than 70*F, pipe stresses and -

support loading could exceed design allowables and possibly prevent the Emergency Core Cooling System from performing its intended function during a postulated accident condition. The health and safety of the general public were not affected by this event. The low and high head safety injection lines for Unit 2 were also not analyzed for fluid temperatures below 70*F and are therefore similarly affected.

Cause of Event The event occurred as a result of a deficiency on the part of the Architect Engineer in the stress analysis of the piping system.

Immediate Corrective Action The affected piping is presently being re-analyzed to determine if any modifications to the installed restraint arrangements are required as a result of the deficiency in the piping system stress analysis.

Scheduled Corrective Action Pending the completion of the current safety injection piping temperature review, pipe support modifications, _ if required, will be made as determined necessary.

Action Taken to Prevent Reccurrence No further actions are required.