LER 90-007-00:on 900523,discovered That Two Sets of Concrete Roof Blocks on Svc Water Pump House Not in Required Safety Position.Caused by Lack of Administrative Controls.Blocks Restored to Required locations.W/900622 Ltr
ML20043H832
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/22/1990
From: Kane G
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-90-007, LER-90-7, N-90-008, N-90-8, NUDOCS 9006260496
Download: ML20043H832 (5)


Text

E .-, . ,

r C. .

i VIRGINI A ELECT RIC AND POWER COMP ANY NORTH ANNA POWER ST ATION P. O. BOX 402

MINE R AL, VIR0lNI A 23117 June-22, 1990 U. S. Nuclear Regulatory Commission Serial No. N 90-008 Attention: Document Control Desk NAPS /CSW:csw ,

Washington, D.C. 20555 Docket No. 50-338 50-339 r

License No. NPF 4 NFP 7

Dear Sirs:

The Virginia Electric and Power Company hereby submits the following Licensee Event Report applicable to North Anna Units 1 and 2.

Report No. LER 90-07-00 t

- This Report has been reviewed by the Station Nuclear Safety and Operating Committee, Very Truly Yours, x

.E. Kane Station Manager

Enclosure:

I cc: U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W.

Suite 2900 Atlanta, Georgia 30323 Mr. M. S. Lesser NRC Senior Resident Inspector North Anna Power Station k

(

9006260496 90t%:22 PDR ADOCK 05000338 g(

S PDC

l

, ,C , M vuvC6ta atove.mv Co- oM ,.,,,ovto oM., ., m ,  !

5% tilts 4/30/97

' ttTIMAf tD BvRDth PER AtSPONst TO COMPLY WTH THt$

UCENSEE EVENT REPORT (LER)

Ef4'" INT't 0o*Ato'?,fo?"no"lN #!,'JA?t ToEt ntCoei a "

'nvtATo"o?Co'J^u"o',fU"'WTa'INJ "Wan D'MTAo'n'.1"A &"?TatT%n'L'!R&%e"'*'

  1. ACitlTV NAME N DoCKtt NutISER un raus tal NORTH ANNA POWER STATION UNIT 1 & 2 olslo;ololql3lg 1 lorl 014 SERVICE WATER PUMP HOUSE TORNADO MISSILE SHIELD BLOCKS unt tygNT Daf t (Si m purF nUE To TNAnEOUATE ADMINMSTRATIVE CONTROL Ltm NUMethtel mePom? Daft 171 OTHER f ACitif ttt INv0LvtD 101 MONTH 8 '"

DAY YtAR YEAR OU n "'f MONTM OAv vtAR ' Acittiv hAMes Docali NvMesmis NORTH ANNA UNIT 2 016 l0 t o l 0 131319 4

0l5 2l 3 90 9l 0 0l 0l 7 0l0 0l 6 2l 2 9l0 0 1 510 10 1 0 I I

,,,,,,,,,, Tww atPonf u sueMirflo Pva v4NT To f t n6ouintMENTe oe io cen s ,C . . ..,. .. ,.,, e nu l "co* *l 1 m enu n i.i eenwaH.wi rene g 00 m eeswmm senwm g eenmuHvi ts.rusi n.l 1i i m m.wmm 30mmm unwmie.)

M 4ellsid Helil 90.73telGHW to 754eH2HeselHA)

_ g3gg Ag J.6Al M eetteH1Hivl 60.734alGHill to.734eH2Hvealfl88 N 4eSisH1Het 90.734 sit 2Iloill to 73teH2Hal LICt8 stet CONT ACT FOR TMit Lin O2l Nist TELEPHONE NUMetm Ame A COD 4, C. F. Knno. Arntion Manager 71019 Al4141-l?llinl1 CoMPttTE oNE t!NE eon SACH CoMPoNtNT e Aitual oneCniet0 IN THE mtPORT H31 R

Cs.ust sysitu COMPONENT mP*

ANN 8AC. PonTffI o pm CAust BYST E M COMPONENT MANN8AC- O PR k' 's l

l I i i i l l I I I f I I I s

! I I I I I 1 I I I i I I I '

SUPPLtMENTAL REPORT tMPtCTRO 114: MONTM DAv ytan SUOMf5SION 4t$ lif ven. c.msu.ft GMPLCTRO SVOhtlSSIOiV OA Til ko l l l Aee,uCTstmea,um c.,a...- - wr s, .,. .u ,,-m. P , o s, At 1430 hours0.0166 days <br />0.397 hours <br />0.00236 weeks <br />5.44115e-4 months <br /> on May 23, 1990, with both units at 100%

power (Mode 1), plant personnel discovered that two sets of concrete roof blocks on the Service Water Pump House were not in their required safe + y position. These blocks are part of the Service Water Pump House missile protection boundary, but are capable of being physically removed to facilitate maintenance on equipment inside the structure.

The Service Water Pump House was missing at least one set of blocks from October 30, 1989 to May 23, 1990. This event constitutes a condition that alone could have prevented the fulfillment of a safety function needed to remove residual heat and mitigate the consequences of an accident. This event is reportable pursuant to 10 CFR 50.73 (a) (2) (v) (B&D) .

A four hour report was made to the NRC on May 23, 1990 in accordance with 10 CFR 50.72 (b) (2) (iii) (B&D) .

During the period that roof blocks were not in place, wind velocities were never high enough to create projectiles that could have affected equipment operability in the Service Water Pump House. In addition, during this time, a quarter inch steel plate shield was positioned over the roof holes.

The health and safety of the public were not affected at any time during this event.

N AC P.rm 384 (649)

.r . -.

FORu m U. . NUCL4?,J et.ULATOR Y m,0N '

t APITE$ 4/30/92

. LICENSEE EVENT '!! PORT (LER) Wo"ll^'#,e'fMd%'5o3',,I .#"*.V ,T.",J."]

TEXT CONTINUd)N  !?ft4'.'ll n" .^ffd3E."!!".I'.lO4E".'

. ONT! ,

i* W ?# A'Ji""t? # ,o"'#l"Te? % M 0?,11 0, MANAQtMENT AND 9UDOET WA$hlNOTON.DC 70003.

FACIL87V NAs#4 (1) 00CRET Nuestin (28 LOR NutettR IS) PAtt 131

-NORTH ANNA POWER STATION UNITS.1 & 2 o plojojol @ ] 8 q0 - 0l q 7 -

0l 0 0l2 or 0 l4 mr <, . mc r mswim ,

1.0 Description of the Event At 1430 hours0.0166 days <br />0.397 hours <br />0.00236 weeks <br />5.44115e-4 months <br /> on May 23, 1990, with both units at 100%

power (Mode 1), plant personnel discovered that two sets of concrete roof blocks on the Service Water Pump House (EIIS System Identifier BI) were not in their required safety position. These blocks are part of the Service Water Pump House missile protection boundary, but are capable of being physically removed to facilitate maintenance on equipment inside the structure. The Service Water Pump House was missing at least one set of blocks from October 30, 1989 to May 23, 1990. This event constitutes a condition that alone could have prevented the fulfillment of a safety function needed to remove residual heat and mitigate the consequences of an accident and is reportable pursuant to 10 CFR 50.73 (a) (2) (v) (B&D) . A four hour report was made to the NRC on May 23, 1990 in accordance with 10 CFR 50.72

- (b) (2) (iii) (B&D) .

  • On October 30, 1989, corrective maintenance was started on the Service Water Screen Wash Pump 1-SW-P-2 (Component Identifier P) due to low discharge pressure. One of the initial actions was to remove the first set of concrete roof blocks that are-located over Screen Wash Pump 1-SW-P-2 and Service Water Pump 2-SW-P-1A. However, the maintenance was placed on hold prior to working on the pump.

A quarter inch steel plate rain shield was placed over the Service Water Pump House roof opening, without replacing the missile shield blocks.

On November 8, 1989, work on Design Change Package (DCP) 89-14, Service Water Pump Cable Replacement was initiated. This DCP was written to replace the power feed cables to the Service Water Pumps (Component identifiers P) and required the removal of the concrete roof blocks. Upon completion of each cable replacement, the steel plate rain shield was reinstalled but the DCP did not require reinstallation of the shield blocks. On January 4, 1990, the second set of blocks over the Service Water Pumps were-removed per DCP 89-14.

On May 23, 1990, it was discovered that the blocks were not in place. The blocks were expeditiously restored to their proper locations.

, N1C 7enn 308A (649)

3A. u... .uct.A. ... ufo T -

...=,,_.,

.-. - LICENSEE EVENT REPORT (LER) f#o"l0,Ro',,v3WCUof;'!$"'AT'kCf',l'.',' ,T4'.%'s TEXT CONTINUATION P,7'4"4'."d'.'MTt30f tME"l,'l# L".' "ER!

(

1 PAPE A 4 u fl0N P b 904 I i

- 0F MANAGlastNT AND SUDGET,vrA6 Mis.GTON.DC 20003.

PACILITY NAtfL 116 00C8L4T MtR 424 ttR NUMSGA tel PA00 tal V4 4 94 0VE h t a A L slOves0N NORTH ANNA POWER STATION UNITS 1-&.2 o g, ; o ; o ; e l 3l 3j 8 q0 ._

0l 0l 7 ._ 0; O 0j3 or 0 [4 TENT 0;asse asses a moissuW, ese assumeW AWC ,enn mW(17) 2.0 Significant Safety Consegr.ences and Implications Abnormal Operating Procedure 1-AP-41, Severe Weather Conditions, is used to secure the site against potential projectiles in the event of high wind velocities or severe weather conditions. This procedure was activated four times during the period when the roof blocks were displaced.

During this time, wind velocities were never high enough to crcate projectiles that could have affected equipment in the Service Water Pump House. On every occasion when 1-AP-41 was activated, the Auxiliary Service Water Pumps were operable. In the event the Service Water Pumps were lost while 1-AP-41 was active, the Auxiliary Service Water Pumps which are located in a separate missile protected facility, could have been used. -

While the Service Water Pump House roof blocks were displaced, a 1/4 inch steel plate was positioned over the l roof holes.

The health and safety of the public were not affected at any time during this event.

3.0 Cause of the Event The cause of the event was lack of administrative controls on removal and replacement of the Service Water Pump House Concrete Blocks, t

4.0 Immediate Corrective Action The blocks were expeditiously restored to their required locations.

,5. 0 Additional Corrective Actions On May 24, 1990, the Operations Department issued instructions requiring an information only Technical Specification Action Statement to be entered whenever a missile shield block is removed These instructions shall remain in place until an evaluation on the control of missile shield blocks is completed and appropriate reco.Jnendations implemented.

- 5:RC Penn 3ASA (6495

1 PONGR M . U.S. NUCLEAR 5.00VLATORY 00amelet0N n,...

. LICENSEE EVENT REPORT (LER) 'Jlo".^l'!lo'f?8'"J',M'?o"Wl'.T' 'TA' ,*o',".'."'S

{

, , ,a - TEXT CONTINUATlON  !?f'n'."4'.% '"R&G3l"f'.*d' S "^,'!E U" .' "Eif!

O!",W.iuti" 7&aa'!;lld!?%'"Mf?Ci OF MANA00M4NT AND SUDOET.WAgnese0 TON, DC 30003.

PACILaty 8:4488 fu OOCKET NURSSR 433 L9R leutWSR (Si PA08 (3)

"*a t'.U'. ?J.17 h NORTH ANNA POWER' STATION i UNITS 1-&'2 o ls l o l o l o l 3l 3l 8 9l 0 0l0 0l 4 or 0l4  ;

~

Text u, 0l 0l -7

. < anc % muwon i l

'6.0 Actions to Prevent Recurrence A Human Performance Enhancement System (HPES) evaluation is being conducted. Recommendations from the HPES evaluation will be implemented as appropriate.

Missile shield blocks will be labeled with identifying information regarding their function and to contact the control room prior to removal.

The Service Water Pump Maintenance Operating Procedures- "

and Service Water Screenwash Pump Maintenance Operating Procedures will be revised to control the removal and restoration of the missile shield blocks and control of the blocks while removed.

7.0 Similar Events LER 85-04 was written to address inadequate tornado missile protection of the Service Water System'. The protection was inadequate due to insufficient backfill over the service water piping.