AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-285 UNIT Fort Calhoun #1 DATE December 7.1979 COMPLETED BY B. J. Hickle TELEPilONE h02-536 kh13 MONTH November, 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe-Net) 1 0.0 g7 hh3.1 2 0.0 18 hh2.h 3 0.0 39 hh3.h 4 0.0 20 hh3.6 5 0.0 21 hhh.1 6 0.0 22 hhh.6 7 0.0 23 hhh.h 8 998.2 24 hhh.h _

9 108 0 4

25 hhh 8 10 h% 0 26 kl4h 8 gg h95 0 27 hhh.O 12 h3h.8 28 hh5.h 13 h43.0 29 hh5.5 34 hh2.7 30 hh3.6 15 hh3.8 3 16 443.s INSTRUCTIONS On this format. list the average daily unit power level in MWe-Net for each day in the reporting inonth. Compute to the nearest whole rnegawatt.

(4/77 )

1531 516 7912140 3 52

OPERATING DATA REPORT DOCKET NO. 50-285 DATE December 7, 1979 COMPLETED BY B.J. Hickle TELEPilONE 402-536 4413 OPER ATING STATUS Fort Calhoun Station Unit No. 1 Notes

1. Unit Name:
2. Reporting Period: November, 1979
3. Licensed Thennal Power (MWt): 1h20
4. Nameplate Rating (Gross MWe): 502
5. Design Electrical Rating (Net MWe): 457
6. Maximum Dependable Capacity (Gross MWe): NO1
7. Maximum Dependable Capacity (Net MWe): h57
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasoas:

N/A

9. Power Level To Which Restricted. If Any (Net MWe): N/A
10. Reasons For Restrictions. If Any: N/A This Month Yr.-to Date Cumulative
11. Ilours In Reporting Period 720.0 8,016.0 54,193.0
12. Number Of flours Reactor Was Critical 553.0 7,602.6 43,76'(.6
13. Reactor Reserve Shutdown flours 170.4 173.5 1,309.5
14. Ilours Generator On Line ShE. 6 7,758.0 h2,82h'.1
15. Unit Resene Shutdown flours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWil) 755.550.6 10.730.526.9 52,378,950.2 .
17. Gross Electrical Energy Generated (MWil) 250,264.0 3,572,265.9 17.376,521.,6_
18. Net Electrical Energy Generated (MWil) 237.055.1 3.396.539.1 16.h17.Qhh.8 '
19. Unit Senice Factor 76.3 96.8 79.0
20. Unit Availability Factor 76.3 96.8 79.0
21. Unit Capacity Factor IUsing MDC Net) 72.3 92.7 66.8
22. Unit Capacity Factor (Using DER Net) 72.3 92 7 66.3
23. Unit Forced Outage Rate 0.0 1.1 4.3
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each t:

Ref'neling Outage, January 18, 8 Week Duration

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status IPrior to Commercial Operation): Forecast Achiesed INITI A L CRITICALITY IN111AL ELECTRICITY COMMERCIAL OPER ATION Z'

) [.) Uo ) JI (9/77) ,

s UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-285 UNIT NAME Fort Cnide,m o DATE Decembar 7.1o79 REPORT MONTi{ November, 1979 COMPLETED BY B. J. AucEle TELEPIIONE h02-5jo-4413 C %t i D - EO 'e E Licensee Ee he Cause & Corrective 4 No. Date { jj j ]j5 Event (i E$ Action to H g3 E 5 ~59 s Report

  • mV 5O Prevent Recurrence O h

- c CD

-- 79-05 79111 S 170.4 B 1 Reactor shutdown to perform non-E destructive testing of steam F

generator nozzle to piping velds pursuant to NRC IE Bulletin 79-14.

4

" I 2 3 4 Un F: Forced Reason: Method: Exhibit G-Instructions CD S: Scheduled A-Equipment Failura(Explain) 1-Manual for Preparation of Data

- B. Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C Refueling 3- Automatic Scram. Event ReporI (LER) File (NUREG-u D-Regulatory Restriction 4-Ot her ( Explain) . 01611

- E-Operator Training & License Examination CO F-Administrative 5 G-Operational Error (Explain) Exhibit I - Same Source (9/77) Il Other (Explain)

Refueling Information

_Ibrt Calhoun - Unit No.1 Aport for the nonth ending November 30, 1979.

1. Scheduled date for next refueling shutdown. January 14, 1980
2. Scheduled date for restart following refueling. March 15, 1980
3. Will refueling or resumption of operation thereafter require a tecimical specification change or other license amendment? Yes
a. If answr is yes, what, in general, will these be?

Stretching power to 1500 MWth is planned in conjunction with the change in fuel supplier to Exxon.

b. If answer is no, has the reload fuel design and core configuration been reviewed by '

your Plant Safety Review Corraittee to deter-mine whether any unreviewed safety questions are associated with the core reload.

c. If no such review has taken place, when is it scheduled?

Stretch Power Applicaton

4. Scheduled date(s) for submitting proposed licensing -Site Related Information, action and support information. July. 1979 - Submitted

-Core Related Analysis

5. Important licensing considerations associated with and Tech. Spec. Changes, refuelinn, e.g., new or different fuel design or November, 1979 Submitted supplier, unreviewul design or perfonaance analysis nethods, significant changes in fuel design, new operating procedures.

First use of Exxon fuel in Fort Calhoun.

Stretching power from 1420 MWth to 1500 MWth.

6. The number of fuel assemblies: a) in the core 133 assemblies b) in the spent fuel pool 157 c) spent fuel pool storage capacity 483 d) planned spent fuel pool storage capacity 483
7. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity. 1985 Prepared by , h.fLS Date December 4, 1979 a .

1581 319

. I CMAHA RJBLIC POWER DISTRICT Fort Calboun Station Unit No.1 November 1979 Mcnthly Operations Report I. OPERATIONS SUM 4ARY Fort Calboun Station Unit No.1 was shutdown on October 30 for an inspecticn of the feedvater nozzles. The unit returned to power operation on November 8,1979 The unit operated at essentially 100%

power the remainder of the month.

Operator training on the sixth operating shift as scheduled.

The preparation for the 1980 outage continued. The required modi fications to the station for fire protection and those required by NUREG-0578 (Three Mile Island) are being reviewed by the operations staff .

Two operators left the District during the month of November.

All required surveillance test s and operational checks were completed during the =onth of November.

A. PERFCRMANCE CEARACTERIDSTICS LER Number Deficiency 79-020 During inspections of accessible piping being performed in accordance with I.E. Bulletin 79-02, eight snubbers on the safety injection system piping were found to be inoperable because of improper installation of the anchor bolts. No significant occurrence took place, The probable consequences vould have been the inability of the snubbers to perform their design function during a seismic event.79-021 During the inspection and evaluation of safety-related piping systems and associated seismic restraints required by I.E. Bulletin 79-14, discrepancies were found between the design documents and the as-built configuration of several seisnic restraints. This LER includes only discrepancies where corrective action was initiated either before or after analysis, up to and including 11-9-79. Subsequent analysis performed to date on the affected lines have not indicated any significant safety problems. A final report will be submitted in accordance with I.E. Bulletin 7914.

1581 320

Monthly Operations Report Novesber 1979 Page Tw B. CHANGES IN OPEPATING METHODS Ncne C. RESULTS OF SURVEILLANCE TESTS AND HISPIITIONS None D. CHANGES, TESTS MID EXPEREGITS CARRIED OUT 'JITHCUT CCMMISSION APPROVAL Procedure D escription SP-FAUD.1 Fuel assembly uplift condition detecticn acceptance criterion was met satisfactorily.

E. RESULTS OF LEAK RATE TESTS Hone F. CHRIGES IN PLANT OPERATING STAFF None G. TRAINING Training the first two weeks of Nove:sber vere limited to On-the-job training during the unit cutage for feedvater no::le inspections.

Following the cutage training was geared toward fuel receipt and refueling procedures. Radiation protection refresher and procedural compliance refresher training was started for all badge holder at the Fort Calhoun Station.

H. CHNIGES, TESTS AND EXPERIME "I'S REQUIRING NUCLEAR REGULATORY CCMMISSION AUTHORIZATION RJRSUANT TO 10CFR50.59 Ncne h.I

\ \\

Approved 9/ '4\~v> '

'ManageI-Fort Calhoun Station I $

, \

cn1 ra t JDI JLi

Monthly Cperations Repcrt Nove=ber 1979 Page Three II. MAII'TE'IANCE (Significant Safety Related) 1 M. c. d i Cate i Descriptien  ; Corrective Acticn 2325 10-24-79 Diesel Generator #2 governor oil Filled governor to proper level.

I level is lov. Possible source of leak found.

Leak was very m:all.

234T 10-26-79 Pipe supports ACS-202 and ACS-203 Pipe supports repaired as per require repair as a result of the Maintenance Order instructions.

OIE Bulletin 79-14 inspection.

251T 11-5-79 Primary Sample Delay coil. Svagelocks Tightened svagelock fitting.

fitting on inlet to primary sample syste= delay coil leaking.

2201 11-7-7 9 FW-161 leaking Replaced gaskets.

23h9 10-26-79 DG-2' Air Ccnpressor cannot keep up Re=oved and cleaned regulator.

vith leakage.

2315 10-25-79 Ealon System in switchgear room Replaced ZH-30 module.

in alarn.

2437 11 7 9 SIS-32 Anchor Bolts / Shells found Reinstalled correctly.

Lastalled incorrectly.

2h64 11-3-7 9 SIS-26A Anchor Bolts / Shells found Reinstalled correctly.

installed incorrectly.

2h60 11-2-79 SIS-38C Anchor Bolts / Shells fcund Reinstalled correctly.

Lastalled incorrectly.

2461 11-1-79 SIS-32A Anchor Bolts / Shells found Reinstalled correctly.

installed incorrectly.

2h63 10-31-79 SIS-28 Anchor Bolts / Shells found Reinstalled correctly.

installed inccrrectly.

2465 11-1-7 9 SIS-27A Anchor Bolts / Shells found Reinstalled correctly.

installed incorrectly.

2L62 10-31-79 SIS-33 Anchor Bolts / Shells found Reinstalled correctly.

installed incorrectly.

2629 11-6-79 DG-2 governor oil level is lov. Added oil.

2531 11-5-79 NG-115 leaks through Removed diaphram and re-assembled.

2532 11-5-79 PCV-266 vill not control pressure. Replaced lover seat and reinstalle L.

2515 11-5-7 9 WD-130 has a blown diaphrs= Replaced diaphra=.

m 1581 322

Menthly Operations Report November 1Sr79 Page Four II. MAIrE'IANCE (Significant Safety Related) (Continued) i

! M. O.

  • I Cate  ! Jescription , Corrective Acticn 21684 11-5-79 Repair PCV-103-2 Dismantled, cleaned and l reassembled. i l

2338 10-31-79 SA-170 leaks Found valve not to be leaking.

2503 11-7-79 AC-3B Packing 01and leaking Install two new seals.

2651 11-10-79 ACS-315 Ancher shell pulled loose Repair ec=pleted per during inspection. MP-3EISMIC-l.

2664 n-9-79 ACS-8hA Anchor shells pulled loose Repair completed per during inspection. MP-3EISMIC-1.

2475 n-3-7 9 FP-1B Insulate Diesel fire pump Wrapped line.

bearing oil line.

1972 11-8-79 WD-28A vill only pump 55# of Tested pump when system was p re ssur e. leaded and compressor pumped 97 lbs.

1711 9-10-79 WD-28B vill only pump hl#. Repair relief valve.

2622 11-7-79 Install a trape::e pipe hanger and Cc=pleted.

remove two hangers which cannect redundent safety piping en HPSI pump suction line frc= shutdown cooling heat exchanger.

26hh n-8-79 Instan pipe hangers for the fire Installed.

system pressure sensing line for the diesel fire pump starting circuit.

693 11 h-79 FW-665 repair ferminited valve. Cc=pleted per procedure.

1423 n-5-79 Centainment Su=p Indication failed Installed new transeiver.

to pu=p.

2401 11-3-79 HCV-2883A vill not open frc= Replaced terminal strip.

control roc = switch.

2685 11-9-79 C/TU h "C" Chnnnel trip Unit #h - Completed.

reset trip points.

27h6 11-15-79 CH-1A Charging Pump check both Cc=pleted.

couplings for align =ent and lube.

2685 n-9-79 RES "C" Channel trip unit #h - Cc=pleted.

c alib rate.

kn ,3 1581

'knthly Cperations Report November 1979 Page Five II. MAE!!I~!KICE (Significant Safety Related) (Continued)

I M. C.

  • i Cate t Descrittien t Corrective Mt' ,a -

2262 11-20-79 HC7-k84 - Air b1cving out of Repacked cylinder.

I controller .

i 280h 11-21-79 HCV-2908 von't close. Disassembled and repaired.

2802 11-26-79 DG-Fuel Storage Tank - pump 55 gal. Cc pleted.

of fuel oil from butten.

1860 11-16-79 DG-1 & 2 Inspect lube oil coolers Cc=pleted.

for cracks around periphery of the tube sheet.

su e

.