MONTHYEARLIC-99-0096, Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With LIC-99-0084, Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With ML20210R1961999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Fcs,Unit 1 LIC-99-0065, Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With ML20210R2081999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Fcs,Unit 1 LIC-99-0053, Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 11999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 1 LIC-99-0047, Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With LIC-99-0034, Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With LIC-99-0025, Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With LIC-99-0003, Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With LIC-98-0172, Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0154, Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0136, Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0122, Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With LIC-98-0105, Monthly Operating Rept for July 1998 for Fort Calhoun Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Fort Calhoun Station LIC-98-0092, Monthly Operating Rept for June 1998 for Fort Calhoun Station,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Fort Calhoun Station,Unit 1 LIC-98-0078, Monthly Operating Rept for May 1998 for Fort Calhoun Station Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Fort Calhoun Station Unit 1 LIC-98-0070, Monthly Operating Rept for Apr 1998 for Ft Calhoun Station1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ft Calhoun Station LIC-98-0058, Monthly Operating Rept for Mar 1998 for Fcs,Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Fcs,Unit 1 LIC-98-0035, Monthly Operating Rept for Feb 1998 for Fcs,Unit 11998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Fcs,Unit 1 LIC-98-0016, Monthly Operating Rept for Jan 1998 for Fort Calhoun Station1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Fort Calhoun Station LIC-98-0002, Monthly Operating Rept for Dec 1997 for Fcs,Unit 11997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Fcs,Unit 1 LIC-97-0191, Monthly Operating Rept for Nov 1997 for Fcs,Unit 11997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Fcs,Unit 1 LIC-97-0179, Monthly Operating Rept for Oct 1997 for Fcs,Unit 11997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Fcs,Unit 1 LIC-97-0163, Monthly Operating Rept for Sept 1997 for Fcs,Unit 11997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Fcs,Unit 1 LIC-97-0149, Monthly Operating Rept for Aug 1997 for Fort Calhoun Station Unit 11997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Fort Calhoun Station Unit 1 LIC-97-0137, Monthly Operating Rept for Jul 1997 for Fort Calhoun Station1997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Fort Calhoun Station LIC-97-0115, Monthly Operating Rept for June 1997 for Fort Calhoun Station,Unit 11997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Fort Calhoun Station,Unit 1 ML20148L9291997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Fort Calhoun Station Unit 1 LIC-97-0081, Monthly Operating Rept for April 1997 for FCS1997-04-30030 April 1997 Monthly Operating Rept for April 1997 for FCS LIC-97-0054, Monthly Operating Rept for Mar 1997 for Fort Calhoun Station Unit 11997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Fort Calhoun Station Unit 1 ML20136G5911997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Fort Calhoun Station ML20134M4281997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Fort Calhoun Station Unit 1 LIC-97-0002, Monthly Operating Rept for Dec 1996 for Fort Calhoun Station Unit 11996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Fort Calhoun Station Unit 1 ML20134M4341996-12-31031 December 1996 Revised Monthly Operating Rept for Dec 1996 for Fort Calhoun Station Unit 1 LIC-96-0196, Monthly Operating Rept for Nov 1996 for Fort Calhoun Station Unit 11996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Fort Calhoun Station Unit 1 LIC-96-0174, Monthly Operating Rept for Oct 1996 for FCS Unit 11996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for FCS Unit 1 LIC-96-0152, Monthly Operating Rept for Sept 1996 for Fort Calhoun Station Unit 11996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Fort Calhoun Station Unit 1 LIC-96-0134, Monthly Operating Rept for Aug 1996 for Fort Calhoun Station1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Fort Calhoun Station LIC-96-0113, Monthly Operating Rept for Jul 1996 for Fort Calhoun Station Unit 11996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Fort Calhoun Station Unit 1 LIC-96-0096, Monthly Operating Rept for June 1996 for Fort Calhoun Station Unit 11996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Fort Calhoun Station Unit 1 LIC-96-0084, Monthly Operating Rept for May 1996 for Fort Calhoun Station Unit 11996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Fort Calhoun Station Unit 1 ML20117G0821996-04-30030 April 1996 Monthly Operating Rept for April 1996 for FCS ML20117G0841996-03-31031 March 1996 Revised MOR for March 1996 for FCS LIC-96-0036, Monthly Operating Rept for Feb 1996 for Calhoun Station,Unit 11996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Calhoun Station,Unit 1 LIC-96-0016, Monthly Operating Rept for Jan 1996 for Fort Calhoun Station Unit 11996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Fort Calhoun Station Unit 1 LIC-96-0004, Monthly Operating Rept for Dec 1995 for Fort Calhoun Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Fort Calhoun Station LIC-95-0233, Monthly Operating Rept for Nov 1995 for FCS Unit 11995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for FCS Unit 1 ML20093G7571995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Fort Calhoun Station Unit 1 LIC-95-0172, Monthly Operating Rept for Aug 1995 for Fort Calhoun Station1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Fort Calhoun Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217B5401999-10-0606 October 1999 Safety Evaluation Supporting Amend 193 to License DPR-40 ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data LIC-99-0096, Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With ML20211J9321999-09-0202 September 1999 Safety Evaluation Concluding That Licensee Proposed Alternatives Provide Acceptable Level of Quality & Safety. Proposed Alternatives Authorized for Remainder of Third ten- Yr ISI Interval for Fort Calhoun Station,Unit 1 LIC-99-0084, Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With ML20216E6431999-08-26026 August 1999 Rev 19 to TDB-VI, COLR for FCS Unit 1 ML20210R1961999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Fcs,Unit 1 ML20210G2181999-07-27027 July 1999 Safety Evaluation Supporting Amend 192 to License DPR-40 ML20210D9951999-07-22022 July 1999 Safety Evaluation Supporting Amend 191 to License DPR-40 ML20216E6361999-07-21021 July 1999 Rev 18 to TDB-VI, COLR for FCS Unit 1 ML20210R2081999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Fcs,Unit 1 LIC-99-0065, Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20210P5461999-06-0808 June 1999 Rev 0,Vols 1-5 of Fort Calhoun Station 1999 Emergency Preparedness Exercise Manual, to Be Conducted on 990810. Pages 2-20 & 2-40 in Vol 2 & Page 4-1 in Vol 4 of Incoming Submittal Not Included ML20195B4581999-05-31031 May 1999 Rev 3 to CE NPSD-683, Development of RCS Pressure & Temp Limits Rept for Removal of P-T Limits & LTOP Requirements from Ts ML20207H7401999-05-31031 May 1999 Performance Indicators Rept for May 1999 LIC-99-0053, Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 11999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 1 ML20195B4521999-05-17017 May 1999 Technical Data Book TDB-IX, RCS Pressure - Temp Limits Rept (Ptlr) ML20206L4241999-05-10010 May 1999 Safety Evaluation Supporting Corrective Actions to Ensure That Valves Are Capable of Performing Intended Safety Functions & OPPD Adequately Addressed Requested Actions Discussed in GL 95-07 ML20206M2601999-05-0606 May 1999 SER Concluding That Licensee IPEEE Complete Re Info Requested by Suppl 4 to GL 88-20 & IPEEE Results Reasonable Given FCS Design,Operation & History LIC-99-0047, Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With ML20195E8621999-04-30030 April 1999 Performance Indicators, for Apr 1999 ML20205Q5831999-04-15015 April 1999 Safety Evaluation Supporting Amend 190 to License DPR-40 ML20210J4331999-03-31031 March 1999 Changes,Tests, & Experiments Carried Out Without Prior Commission Approval for Period 981101-990331.With USAR Changes Other than Those Resulting from 10CFR50.59 ML20206G2641999-03-31031 March 1999 Performance Indicators Rept for Mar 1999 LIC-99-0034, Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With ML20205J8181999-02-28028 February 1999 Performance Indicators, for Feb 1999 LIC-99-0025, Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With ML20207F3291999-01-31031 January 1999 FCS Performance Indicators for Jan 1999 ML20203B0991998-12-31031 December 1998 Performance Indicators for Dec 1998 LIC-99-0026, 1998 Omaha Public Power District Annual Rept. with1998-12-31031 December 1998 1998 Omaha Public Power District Annual Rept. with LIC-99-0003, Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With ML20198S3771998-12-31031 December 1998 Safety Evaluation Supporting Amend 189 to License DPR-40 ML20198S4831998-12-31031 December 1998 Safety Evaluation Supporting Amend 188 to License DPR-40 ML20196G2251998-12-18018 December 1998 Rev 2 to EA-FC-90-082, Potential Over-Pressurization of Containment Penetration Piping Following Main Steam Line Break in Containment ML20198M3141998-11-30030 November 1998 Performance Indicators Rept for Nov 1998 LIC-98-0172, Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0160, Special Rept:On 981113,MSL RM RM-064 Was Declared Inoperable Due to Leakage Past Isolation Valve HCV-922.Troubleshooting Has Indicated That Leakage Has Stopped & Cause of Leak Continues to Be Investigated1998-11-25025 November 1998 Special Rept:On 981113,MSL RM RM-064 Was Declared Inoperable Due to Leakage Past Isolation Valve HCV-922.Troubleshooting Has Indicated That Leakage Has Stopped & Cause of Leak Continues to Be Investigated ML20203B0721998-11-16016 November 1998 Rev 6 to HI-92828, Licensing Rept for Spent Fuel Storage Capacity Expansion ML20196E4981998-10-31031 October 1998 Performance Indicators Rept for Oct 1998 ML20196G2441998-10-31031 October 1998 Changes,Tests & Experiments Carried Out Without Prior Commission Approval. with USAR Changes Other than Those Resulting from 10CFR50.59 LIC-98-0154, Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With ML20154M4881998-10-19019 October 1998 Safety Evaluation Supporting Amend 186 to License DPR-40 ML20154N2411998-10-19019 October 1998 Safety Evaluation Supporting Amend 187 to License DPR-40 LIC-98-0136, Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With ML20155G4261998-09-30030 September 1998 Performance Indicators for Sept 1998 ML20154A1251998-08-31031 August 1998 Performance Indicators, Rept for Aug 1998 LIC-98-0122, Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With ML20238F7231998-08-17017 August 1998 Owner'S Rept for Isis ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency 1999-09-30
[Table view] |
Text
. .
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-285 UNIT Fort Calhoun #1 DATE December 7.1979 COMPLETED BY B. J. Hickle TELEPilONE h02-536 kh13 MONTH November, 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe-Net) 1 0.0 g7 hh3.1 2 0.0 18 hh2.h 3 0.0 39 hh3.h 4 0.0 20 hh3.6 5 0.0 21 hhh.1 6 0.0 22 hhh.6 7 0.0 23 hhh.h 8 998.2 24 hhh.h _
9 108 0 4
25 hhh 8 10 h% 0 26 kl4h 8 gg h95 0 27 hhh.O 12 h3h.8 28 hh5.h 13 h43.0 29 hh5.5 34 hh2.7 30 hh3.6 15 hh3.8 3 16 443.s INSTRUCTIONS On this format. list the average daily unit power level in MWe-Net for each day in the reporting inonth. Compute to the nearest whole rnegawatt.
(4/77 )
1531 516 7912140 3 52
OPERATING DATA REPORT DOCKET NO. 50-285 DATE December 7, 1979 COMPLETED BY B.J. Hickle TELEPilONE 402-536 4413 OPER ATING STATUS Fort Calhoun Station Unit No. 1 Notes
- 1. Unit Name:
- 2. Reporting Period: November, 1979
- 3. Licensed Thennal Power (MWt): 1h20
- 4. Nameplate Rating (Gross MWe): 502
- 5. Design Electrical Rating (Net MWe): 457
- 6. Maximum Dependable Capacity (Gross MWe): NO1
- 7. Maximum Dependable Capacity (Net MWe): h57
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasoas:
N/A
- 9. Power Level To Which Restricted. If Any (Net MWe): N/A
- 10. Reasons For Restrictions. If Any: N/A This Month Yr.-to Date Cumulative
- 11. Ilours In Reporting Period 720.0 8,016.0 54,193.0
- 12. Number Of flours Reactor Was Critical 553.0 7,602.6 43,76'(.6
- 13. Reactor Reserve Shutdown flours 170.4 173.5 1,309.5
- 14. Ilours Generator On Line ShE. 6 7,758.0 h2,82h'.1
- 15. Unit Resene Shutdown flours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWil) 755.550.6 10.730.526.9 52,378,950.2 .
- 17. Gross Electrical Energy Generated (MWil) 250,264.0 3,572,265.9 17.376,521.,6_
- 18. Net Electrical Energy Generated (MWil) 237.055.1 3.396.539.1 16.h17.Qhh.8 '
- 19. Unit Senice Factor 76.3 96.8 79.0
- 20. Unit Availability Factor 76.3 96.8 79.0
- 21. Unit Capacity Factor IUsing MDC Net) 72.3 92.7 66.8
- 22. Unit Capacity Factor (Using DER Net) 72.3 92 7 66.3
- 23. Unit Forced Outage Rate 0.0 1.1 4.3
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each t:
Ref'neling Outage, January 18, 8 Week Duration
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
- 26. Units in Test Status IPrior to Commercial Operation): Forecast Achiesed INITI A L CRITICALITY IN111AL ELECTRICITY COMMERCIAL OPER ATION Z'
) [.) Uo ) JI (9/77) ,
s UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-285 UNIT NAME Fort Cnide,m o DATE Decembar 7.1o79 REPORT MONTi{ November, 1979 COMPLETED BY B. J. AucEle TELEPIIONE h02-5jo-4413 C %t i D - EO 'e E Licensee Ee he Cause & Corrective 4 No. Date { jj j ]j5 Event (i E$ Action to H g3 E 5 ~59 s Report
- mV 5O Prevent Recurrence O h
- c CD
-- 79-05 79111 S 170.4 B 1 Reactor shutdown to perform non-E destructive testing of steam F
generator nozzle to piping velds pursuant to NRC IE Bulletin 79-14.
4
" I 2 3 4 Un F: Forced Reason: Method: Exhibit G-Instructions CD S: Scheduled A-Equipment Failura(Explain) 1-Manual for Preparation of Data
- B. Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C Refueling 3- Automatic Scram. Event ReporI (LER) File (NUREG-u D-Regulatory Restriction 4-Ot her ( Explain) . 01611
- E-Operator Training & License Examination CO F-Administrative 5 G-Operational Error (Explain) Exhibit I - Same Source (9/77) Il Other (Explain)
Refueling Information
_Ibrt Calhoun - Unit No.1 Aport for the nonth ending November 30, 1979.
- 1. Scheduled date for next refueling shutdown. January 14, 1980
- 2. Scheduled date for restart following refueling. March 15, 1980
- 3. Will refueling or resumption of operation thereafter require a tecimical specification change or other license amendment? Yes
- a. If answr is yes, what, in general, will these be?
Stretching power to 1500 MWth is planned in conjunction with the change in fuel supplier to Exxon.
- b. If answer is no, has the reload fuel design and core configuration been reviewed by '
your Plant Safety Review Corraittee to deter-mine whether any unreviewed safety questions are associated with the core reload.
- c. If no such review has taken place, when is it scheduled?
Stretch Power Applicaton
- 4. Scheduled date(s) for submitting proposed licensing -Site Related Information, action and support information. July. 1979 - Submitted
-Core Related Analysis
- 5. Important licensing considerations associated with and Tech. Spec. Changes, refuelinn, e.g., new or different fuel design or November, 1979 Submitted supplier, unreviewul design or perfonaance analysis nethods, significant changes in fuel design, new operating procedures.
First use of Exxon fuel in Fort Calhoun.
Stretching power from 1420 MWth to 1500 MWth.
- 6. The number of fuel assemblies: a) in the core 133 assemblies b) in the spent fuel pool 157 c) spent fuel pool storage capacity 483 d) planned spent fuel pool storage capacity 483
- 7. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity. 1985 Prepared by , h.fLS Date December 4, 1979 a .
1581 319
. I CMAHA RJBLIC POWER DISTRICT Fort Calboun Station Unit No.1 November 1979 Mcnthly Operations Report I. OPERATIONS SUM 4ARY Fort Calboun Station Unit No.1 was shutdown on October 30 for an inspecticn of the feedvater nozzles. The unit returned to power operation on November 8,1979 The unit operated at essentially 100%
power the remainder of the month.
Operator training on the sixth operating shift as scheduled.
The preparation for the 1980 outage continued. The required modi fications to the station for fire protection and those required by NUREG-0578 (Three Mile Island) are being reviewed by the operations staff .
Two operators left the District during the month of November.
All required surveillance test s and operational checks were completed during the =onth of November.
A. PERFCRMANCE CEARACTERIDSTICS LER Number Deficiency 79-020 During inspections of accessible piping being performed in accordance with I.E. Bulletin 79-02, eight snubbers on the safety injection system piping were found to be inoperable because of improper installation of the anchor bolts. No significant occurrence took place, The probable consequences vould have been the inability of the snubbers to perform their design function during a seismic event.79-021 During the inspection and evaluation of safety-related piping systems and associated seismic restraints required by I.E. Bulletin 79-14, discrepancies were found between the design documents and the as-built configuration of several seisnic restraints. This LER includes only discrepancies where corrective action was initiated either before or after analysis, up to and including 11-9-79. Subsequent analysis performed to date on the affected lines have not indicated any significant safety problems. A final report will be submitted in accordance with I.E. Bulletin 7914.
1581 320
Monthly Operations Report Novesber 1979 Page Tw B. CHANGES IN OPEPATING METHODS Ncne C. RESULTS OF SURVEILLANCE TESTS AND HISPIITIONS None D. CHANGES, TESTS MID EXPEREGITS CARRIED OUT 'JITHCUT CCMMISSION APPROVAL Procedure D escription SP-FAUD.1 Fuel assembly uplift condition detecticn acceptance criterion was met satisfactorily.
E. RESULTS OF LEAK RATE TESTS Hone F. CHRIGES IN PLANT OPERATING STAFF None G. TRAINING Training the first two weeks of Nove:sber vere limited to On-the-job training during the unit cutage for feedvater no::le inspections.
Following the cutage training was geared toward fuel receipt and refueling procedures. Radiation protection refresher and procedural compliance refresher training was started for all badge holder at the Fort Calhoun Station.
H. CHNIGES, TESTS AND EXPERIME "I'S REQUIRING NUCLEAR REGULATORY CCMMISSION AUTHORIZATION RJRSUANT TO 10CFR50.59 Ncne h.I
\ \\
Approved 9/ '4\~v> '
'ManageI-Fort Calhoun Station I $
, \
cn1 ra t JDI JLi
Monthly Cperations Repcrt Nove=ber 1979 Page Three II. MAII'TE'IANCE (Significant Safety Related) 1 M. c. d i Cate i Descriptien ; Corrective Acticn 2325 10-24-79 Diesel Generator #2 governor oil Filled governor to proper level.
I level is lov. Possible source of leak found.
Leak was very m:all.
234T 10-26-79 Pipe supports ACS-202 and ACS-203 Pipe supports repaired as per require repair as a result of the Maintenance Order instructions.
OIE Bulletin 79-14 inspection.
251T 11-5-79 Primary Sample Delay coil. Svagelocks Tightened svagelock fitting.
fitting on inlet to primary sample syste= delay coil leaking.
2201 11-7-7 9 FW-161 leaking Replaced gaskets.
23h9 10-26-79 DG-2' Air Ccnpressor cannot keep up Re=oved and cleaned regulator.
vith leakage.
2315 10-25-79 Ealon System in switchgear room Replaced ZH-30 module.
in alarn.
2437 11 7 9 SIS-32 Anchor Bolts / Shells found Reinstalled correctly.
Lastalled incorrectly.
2h64 11-3-7 9 SIS-26A Anchor Bolts / Shells found Reinstalled correctly.
installed incorrectly.
2h60 11-2-79 SIS-38C Anchor Bolts / Shells fcund Reinstalled correctly.
Lastalled incorrectly.
2461 11-1-79 SIS-32A Anchor Bolts / Shells found Reinstalled correctly.
installed incorrectly.
2h63 10-31-79 SIS-28 Anchor Bolts / Shells found Reinstalled correctly.
installed inccrrectly.
2465 11-1-7 9 SIS-27A Anchor Bolts / Shells found Reinstalled correctly.
installed incorrectly.
2L62 10-31-79 SIS-33 Anchor Bolts / Shells found Reinstalled correctly.
installed incorrectly.
2629 11-6-79 DG-2 governor oil level is lov. Added oil.
2531 11-5-79 NG-115 leaks through Removed diaphram and re-assembled.
2532 11-5-79 PCV-266 vill not control pressure. Replaced lover seat and reinstalle L.
2515 11-5-7 9 WD-130 has a blown diaphrs= Replaced diaphra=.
m 1581 322
Menthly Operations Report November 1Sr79 Page Four II. MAIrE'IANCE (Significant Safety Related) (Continued) i
! M. O.
- I Cate ! Jescription , Corrective Acticn 21684 11-5-79 Repair PCV-103-2 Dismantled, cleaned and l reassembled. i l
2338 10-31-79 SA-170 leaks Found valve not to be leaking.
2503 11-7-79 AC-3B Packing 01and leaking Install two new seals.
2651 11-10-79 ACS-315 Ancher shell pulled loose Repair ec=pleted per during inspection. MP-3EISMIC-l.
2664 n-9-79 ACS-8hA Anchor shells pulled loose Repair completed per during inspection. MP-3EISMIC-1.
2475 n-3-7 9 FP-1B Insulate Diesel fire pump Wrapped line.
bearing oil line.
1972 11-8-79 WD-28A vill only pump 55# of Tested pump when system was p re ssur e. leaded and compressor pumped 97 lbs.
1711 9-10-79 WD-28B vill only pump hl#. Repair relief valve.
2622 11-7-79 Install a trape::e pipe hanger and Cc=pleted.
remove two hangers which cannect redundent safety piping en HPSI pump suction line frc= shutdown cooling heat exchanger.
26hh n-8-79 Instan pipe hangers for the fire Installed.
system pressure sensing line for the diesel fire pump starting circuit.
693 11 h-79 FW-665 repair ferminited valve. Cc=pleted per procedure.
1423 n-5-79 Centainment Su=p Indication failed Installed new transeiver.
to pu=p.
2401 11-3-79 HCV-2883A vill not open frc= Replaced terminal strip.
control roc = switch.
2685 11-9-79 C/TU h "C" Chnnnel trip Unit #h - Completed.
reset trip points.
27h6 11-15-79 CH-1A Charging Pump check both Cc=pleted.
couplings for align =ent and lube.
2685 n-9-79 RES "C" Channel trip unit #h - Cc=pleted.
c alib rate.
kn ,3 1581
'knthly Cperations Report November 1979 Page Five II. MAE!!I~!KICE (Significant Safety Related) (Continued)
I M. C.
- i Cate t Descrittien t Corrective Mt' ,a -
2262 11-20-79 HC7-k84 - Air b1cving out of Repacked cylinder.
I controller .
i 280h 11-21-79 HCV-2908 von't close. Disassembled and repaired.
2802 11-26-79 DG-Fuel Storage Tank - pump 55 gal. Cc pleted.
of fuel oil from butten.
1860 11-16-79 DG-1 & 2 Inspect lube oil coolers Cc=pleted.
for cracks around periphery of the tube sheet.
su e
.