LER 79-124/03L-0:on 790920,quench Spray Pump 1-QS-P-1A Was Removed from Svc to Repair Leak in Downstream Flow Element. Caused by Deteriorated Gaskets at Flanges.Flex Gaskets Replaced & Pump Tested & Returned to Svc
ML19250A804
Person / Time
Site: North Anna Dominion icon.png
Issue date: 10/19/1979
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19250A788 List:
References
LER-79-124-03L, LER-79-124-3L, NUDOCS 7910240630
Download: ML19250A804 (2)


Text

NRC FORM 366 . U L AR REGULATORY COMMISSI N (7 77) -

LICENSEE EVENT REPORT CONTROL BLOCK: l 1

l l l l lh 6

(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 7 0 i 8 9 IVlAINIAlS LICENSEE CODEll@15l010 14

- 10 LICENSE l 0 l 0NUMBER l 0101- 0101@l4 l1L 11 25 26 l1 l1 l@l57 CAT CENSE TYPE JO I

58 l@

CON'T 7

O i 8

,g g L jgl 015 010 0 3l3l8l@l0l9l2l0 a

60 61 DOCKET NUMBER 68 69 719 l@l 1 ol119 EVENT DATE 74 75 REPORT DATE 7l780@

EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h lO12IlOn September 20, 1979, during Mode 1 operation, quench spray pump 1-0S-P-1 A was I o a i removed from service to repair a leak in the downstream flow element. This action i O i4, resulted in the inoperability of the Train A quench spray subsystem which is contrarv i 10 i s i to T.S. 3.6.2.1 and reportable pursuant to T.S. 6.9.1.9.b. The public health and i O s isafety were not affected because the system was restored to operable status within 1 j o l 7 l l the time limit allowed by the ACTION Statement. I O a i l C E CODE S OCO E COMPONENT CODE SUSC DE S E t o_19 ] ISIB @ LE j@ LX_j @ l P l I P l E l X l X l@ W@ l Z20 ,l @

7 8 9 10 11 12 13 18 19

,_ SEQUENTIAL OCCUR R E NCE REPORT REVISION LER/RO EVENT YE AR REPORT NO. CODE TYPE N O.

@yREP= 7 19 21 22 L-J 23 l 11 21 41 24 26 Ld 27 28 013I 29 I tl 30 L]

31 LO_I 32 T Kr A O ONPt NT ET HOURS S8 IT ~ FOR1 8. S PLIE MAN F CTURER l33A l@l2 l@ Zl@ l36 Zl@ l 010 01 01 [_Yj @ lNI@ Al@ F 1l5 31@

34 35 31 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS i o l Flow element FE-0S101A leaked because of deteriorated aaskets at the flances. The l i i l flex gaskets were replaced and the quench spray pump was satisfactorily tested and I i 2 Ireturned to service.

I i a l I

u L4.J 8 g l 80 7

^

STA  % POWE R OTHER STATUS dis O RY DISCOVERY DESCRIPTION i s

[E_J@ l 0l 7 Ol@l NA l l A l@l Operator Observation l ACTIVITY CO TENT RELE ASED OF RELEASE AYOUNT OF ACTIVITY LOCATION OF RELEASE IiIsl LZ_j @ tZ_j@l NA l NA l PERSONNEL E XPOS ES NUUSER TYPE DE SCRIPTION y l0l010l@lZl@l NA l

,ERSONNe'L ,Nau'4ES Nuy8ER DESCRiPriON@ 17nb ic : c8I Ii s l010 0l@l NA l 7 8 9 11 12 p 80

'A ' " ESC ^"*%'N '^ " @

P NA 7910240 l 7

i o 8 9 W @l10 80 ISSUE  %

l 2 l a l LN_j@l DESCRIPTION NA I IIIIIIIII I I 7 8 9 10 68 69 80 S NAME OF PREPARER

. R. Cartwright psoye: 703-894-5151 2,

Virginia Electric and Power Company North Anna Power Station, Unit #1

Attachment:

Page 1 of 1 Docket No. 50-338 Report No. LER 79-124/03L-0 Description of Event On September 20, 1979, during steady state operation at 70% power, quench spray pump 1-QS-P-1A was removed from service to repair a leak in the flow element downstream of the pump. This action rendered the Train A quench spray subsystem inoperable which is contrary to T.S. 3.6.2.1.

Probable Consequences of Occurrence The consequences of this event were limited because the Train A quench spray subsystem was returned to operable status within the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> time limit allowed by the ACTION statement and because the Train B quench spray subsystem remained operable to depressurize the containment if required. As a result, the health and safety of the general public were not endangered by this event.

There are no generic implications associated with this occurrence.

Cause of Occurrence The leak in flow element FE-QS101A was caused by deteriorated flex gaskets at the flanges.

Immediate Corrective Action The flex gaskets at the flanges of the flow element were replaced and the quench spray pump was satisfactorily tested and returned to service.

Scheduled Corrective Action No scheduled corrective action is required.

Actions Taken to Prevent Recurrencee No further actions are required.