A September 14, 1979 FILE: NG-3514(B)

SERIAL: GD-79-2336 Office of Nuclear Reactor Regulation Attention:

Mr. T. A. Iprolito, Chief Operating Reactors Branch No. 3 United States Nuclear Regulatory Commission Washington, D.C.

20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 LICENSE NOS. DPR-71 AND DPR-62 DOCKET NOS. 50-325 AND 50-324 INFORMATION ON TARGET ROCK SAFETY / RELIEF VALVES

Dear Mr. Ippolito:

In response to Mr. Brian Grimes' latter of July 16, 1979, requesting information on Target Rock safety / relief valves at 1.he Brunswick Steam Electric Plant Unit Nos. 1 and 2, Carolina Power & Light Company submits the following information:

1.

What is the status of each of the Target Rock safety / relief valves at your plant (s)?

a.

Are they in their original design configuration?

CP&L Response: Yea b.

What is the existing simmer margin?

CP&L Response:

100, 110, and 120 psig (setpoints at 1105, 1115 and 1125 psig; normal operating pressure is 1005 psig).

What modifications have you implemented to improve reliability?

c.

CP&L Response:

Increase setpoint (si=mer margin) by 25 psig.

J.

On what date vera these scdifications made?

CP&L Response: Unit No. 2 - June 1978; Unit No. 1 - 360036 September 1978.

\\

OP Ve

/

4 (b 7 9 09180 3 39 'Y[s h

c.

.~

...u..

\\

O Mr. T. A. Ippolito 2.

What main'cenance and testing do you routinely perform on these valves and how often is it performed?

CP&L Response:

(1) PT 19.4 verifies setpoint, inspect and rebuild pilot assembly; 18 months.

(2) PT 11.1.2 verifies operability of ADS valves; 18 months.

3.

What additional modifications and/or maintenance do you plan to implement in the future?

CP&L Response: None at present. We are observing and evaluating performance of the new two-stage topworks being tried at several other BWR's.

4.

On what date will the modification (s) and/or maintenance in Item 3 be implemented?

CP&L Response: Not applicable.

We trust that this information

.isfies the request for Target Rock safety / relief valve information.

Yours very truly, o'

/

o E. E. Utley i

Executive Vice President'.

Power Supply & Customer Services EEU/jcb I (5()(kbbh'