Technical Specifications, Issuance of Amendment No. 211 to Facility Operating License Removal of Vendor Recommended Diesel Generator Surveillance Requirement
ML070370431
Person / Time
Site: Waterford Entergy icon.png
Issue date: 02/06/2007
From:
NRC/NRR/ADRO/DORL/LPLIV
To:
Fields M, NRR/DORL/LP4, 415-3062
Shared Package
ML070240217 List:
References
TAC MD2357
Download: ML070370431 (2)


Text

or indirectly any control over (i) the facility, (ii) power or energy produced by the facility, or (iii) the licensees of the facility. Further, any rights acquired under this authorization may be exercised only in compliance with and subject to the requirements and restrictions of this operating license, the Atomic Energy Act of 1954, as amended, and the NRC's regulations. For purposes of this condition, the limitations of 10 CFR 50.81, as now in effect and as they may be subsequently amended, are fully applicable to the equity investors and any successors in interest to the equity investors, as long as the license for the facility remains in effect.

(b) Entergy Louisiana, LLC (or its designee) to notify the NRC in writing prior to any change in (i) the terms or conditions of any lease agreements executed as part of the above authorized financial transactions, (ii) any facility operating agreement involving a licensee that is in effect now or will be in effect in the future, or (iii) the existing property insurance coverages for the facility, that would materially alter the representations and conditions, set forth in the staffs Safety Evaluation enclosed to the NRC letter dated September 18, 1989. In addition, Entergy Louisiana, LLC or its designee is required to notify the NRC of any action by equity investors or successors in interest to Entergy Louisiana, LLC that may have an effect on the operation of the facility.

C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter 1 and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

1. Maximum Power Level E0I is authorized to operate the facility at reactor core power levels not in excess of 3716 megawatts thermal (100% power) in accordance with the conditions specified herein.
2. Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.211 , and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. E0I shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

AMENDMENT NO 211

ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

8. During shutdown, verifying the diesel generator's capability to:

a) Synchronize with the offsite power source while the generator is loaded with its emergency loads upon a simulated restoration of offsite power, b) Transfer its loads to the offsite power source, and c) Be restored to its standby status.

9. During shutdown, verifying that with the diesel generator operating in a test mode (connected to its bus), a simulated safety injection signal overrides the test mode by (1) returning the diesel generator to standby operation and (2) automatically energizes the emergency loads with offsite power.
10. Verifying that each fuel transfer pump transfers fuel to its associated diesel oil feed tank by taking suction from the opposite train fuel oil storage tank via the installed cross connect.
11. During shutdown, verifying that the automatic load sequence timer is OPERABLE with the time of each load block within +/-10% of the sequenced load block time.
12. Verifying that the following diesel generator lockout features prevent diesel generator starting only when required:

a) turning gear engaged b) emergency stop c) loss of D.C. control power d) governor fuel oil linkage tripped

f. Deleted
g. At least once per 10 years or after any modifications which could affect diesel generator interdependence by starting the diesel generators simultaneously, during shutdown, and verifying that the diesel generators accelerate to at least 600 rpm (60 +/- 1.2 Hz) in less than or equal to 10 seconds.
h. At least once per 10 years by:
1. Draining each diesel generator fuel oil storage tank, removing the accumulated sediment, and cleaning the tank using a sodium hypochlorite solution or equivalent.

WATERFORD - UNIT 3 3/4 8-6a AMENDMENT NO. 23,92,126, 1 211