Category:CORRESPONDENCE-LETTERS
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216E6661999-09-10010 September 1999 Forwards Analysis of Capsule W Virginia Power North Anna Unit 1 Nuclear Power Plant Reactor Vessel Matl Surveillance Program, for Capsule Withdrawn on 980922 ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210N2921999-08-0505 August 1999 Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216E6661999-09-10010 September 1999 Forwards Analysis of Capsule W Virginia Power North Anna Unit 1 Nuclear Power Plant Reactor Vessel Matl Surveillance Program, for Capsule Withdrawn on 980922 ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML20196F1151999-06-22022 June 1999 Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program ML20212J2951999-06-22022 June 1999 Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS ML20195J7011999-06-15015 June 1999 Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARML18153C3661990-09-20020 September 1990 Forwards Topical Rept VEP-NE-3-A, Qualification of WRB-1 CHF Correlation in VEPCO Cobra Code. ML20065D5671990-09-20020 September 1990 Forwards Rev 15 to Security Personnel Training & Qualification Plan.Rev Withheld ML18153C3701990-09-18018 September 1990 Forwards Addl Info Re Facility Containment Isolation Valve Type C Test,Per 900914 10CFR50,App J Exemption Request ML18152A2341990-09-14014 September 1990 Requests Exemption from 10CFR50,App J Section III.D.3 Re Local Leak Rate Testing During Every Reactor Shutdown. Basis & Justification for Exemption Encl ML20059J3341990-09-13013 September 1990 Forwards Rev 15 to Nuclear Security Personnel Training & Qualification Plan.Rev Withheld ML20059H7391990-09-10010 September 1990 Forwards Rev 15 to ISFSI Nuclear Security Personnel Training & Qualification Plan.Rev Withheld ML20064A5201990-09-0707 September 1990 Responds to NRC Re Violations Noted in Insp Repts 50-338/90-15 & 50-339/90-15.Corrective Actions:Procedures Revised to Include Tolerance Bands for Temp Control Switch Setpoints & Involved Personnel Counseled ML20059H2931990-09-0707 September 1990 Advises of Review & Approval of ASME Section XI Inservice Insp Program Interval 1 Repair & Replacement Program Change to Applicable Code Edition & Addenda ML18151A2901990-08-31031 August 1990 Forwards Rev 10 to Updated FSAR for Surry Power Station Units 1 & 2,representing Second Updated FSAR Submitted This Yr ML20059E5481990-08-31031 August 1990 Forwards Supplemental Info Re Deletion of Pressurizer Safety Valve Requirement During Mode 5.Current Tech Spec Requiring One Operable Safety Valve in Mode 5 Unnecessary & May Be Deleted ML18153C3451990-08-29029 August 1990 Forwards Proprietary Semiannual Fitness for Duty Program Performance Data Rept for 900103-0630.Rept Includes Summaries of Mgt Sanctions Imposed,Actions Taken to Correct Program Weaknesses & Events Reported to Nrc.Encl Withheld ML18153C3381990-08-22022 August 1990 Responds to NRC 900723 Ltr Re Violations Noted in Insp Rept 50-280/90-21 & 50-281/90-21.Corrective actions:as-found-as- Left Conditions of Auxiliary Feedwater Evaluated & Found Operable ML18153C3391990-08-22022 August 1990 Requests Approval for Use of Plugs Fabricated of nickel- chromium-iron Uns N-06690 Matl (Alloy 690) to Plug Tubes in Steam Generators for Mechanical & Welded Applications ML20063Q1241990-08-15015 August 1990 Provides Supplemental Info for 900115 Tech Spec Change Request Re Max Allowable Control Rod Drop Time.Retained DNBR Margin Tracked & Documented by Calculational Note ML20058N5941990-08-0808 August 1990 Responds to NRC Re Violations Noted in Insp Repts 50-338/90-11 & 50-339/90-11.Corrective Actions:Procedure Revised to Limit Applicablity to Small Refueling Cavity Leaks & Listed Evaluations & Revs Will Be Made to EOP ML18153C3171990-08-0101 August 1990 Resubmits Synopsis of Changes to Updated Operational QA Program Topical Rept Vep 1-5A ML18153C3161990-08-0101 August 1990 Provides Supplemental Response to NRC 900629 Ltr Re Electrical Crossties,Load Shedding on Nonblackout Unit & Emergency Diesel Generator Reliability.Emergency Diesel Generator Reliability Program in Place,Per Reg Guide 1.155 ML18153C3091990-07-30030 July 1990 Provides Outline of Plan to Meet 10CFR50 App G Requirements, for Low Upper Shelf Energy Matls,Per NRC 900521 Request ML18153C3061990-07-30030 July 1990 Forwards Revised Tech Spec Pages,Addressing Constitution of Quorum & Timeliness of Mgt Safety Review Committe Meeting Minutes,Per NRC Request ML18153C3101990-07-26026 July 1990 Forwards Decommissioning Financial Assurance Certification Rept..., Nuclear Decommissioning Trust Agreement & Nonqualified Nuclear Decommissioning Trust Amended & Restated Trust Agreement, Per 10CFR50.75 ML18153C3051990-07-26026 July 1990 Advises That Util Submitted Decommissioning Funding Plan & Financial Assurance Info W/Isfsi License Application ML18153C3041990-07-26026 July 1990 Responds to NRC 900626 Ltr Re Violations Noted in Insp Rept 50-281/90-20.Corrective Actions:Leaking Drain Plug & Upper Drain Plug on Motor Replaced W/Oil Drain Assemblies Composed of Piping & Valves ML18153C3031990-07-26026 July 1990 Advises of Withdrawal of Request for NRC Review & Approval of Engineering Evaluation 8.Revised Evaluation Will Be Maintained Onsite for NRC Audit During Future Insps,Per Generic Ltr 86-10 ML20055H5651990-07-20020 July 1990 Requests for Temporary Waiver of Compliance from Requirement of Tech Spec 3.3.1.1,Table 2.3-2 Re Response Time Testing. Request Does Not Pose Significant Hazards Consideration ML18153C2901990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Listed Transmitters Compiled.Transmitters Found Installed within Reactor Protection or ESFAS Have Been Replaced ML20055F9361990-07-16016 July 1990 Advises That No 30-day Rept Will Be Made Re Degradation of Seismic Support Bolts of post-accident Hydrogen Recombiners 1-HC-HC-1 & 2-HC-HC-1 ML20044B3501990-07-13013 July 1990 Forwards Monthly Operating Repts for June 1990 & Corrected May 1990 Rept Pages for North Anna Power Station ML18153C2861990-07-12012 July 1990 Requests Cancellation of Operator Licenses for Listed Individuals.Licenses No Longer Required ML18153C2871990-07-11011 July 1990 Responds to Violations Noted in Insp Repts 50-280/90-18 & 50-281/90-18.Corrective Actions:Permanent Drain Line Installed & Matrix Which Describes Proper Ventilation Alignment for Plant Conditions Provided for Personnel Use ML20055E8121990-07-0909 July 1990 Requests Cancellation of Licenses Listed ML18153C2851990-07-0606 July 1990 Forwards Response to Generic Ltr 90-04 Re Status of Generic Safety Issues ML20055D4841990-07-0303 July 1990 Requests That Operator Licenses for Listed Individuals Be Cancelled.Licenses No Longer Required ML20055D4831990-07-0303 July 1990 Requests That Operator License for Bl Shriver Be Cancelled. License No Longer Required ML18153C2831990-07-0303 July 1990 Advises That MW Hotchkiss No Longer Needs Operator License SOP-20548-1.Cancellation of License Requested ML18153C2821990-07-0303 July 1990 Requests Exemption from 10CFR50,App J,Paragraph III.A.6(b), Which Requires That When Two Consecutive Periodic Type a Tests Fail to Meet Applicable Acceptance Criteria Type a Test Shall Be Performed at Plant ML20055D7701990-06-29029 June 1990 Submits Supplemental Response to Violations Noted in Insp Repts 50-338/90-04 & 50-339/90-04 Re Failure to Take Timely Corrective Action for Repair of B Low Head Safety Injection Pump (1-SI-P-1B).No Addl Purchasing Procedure Required ML18153C3591990-06-28028 June 1990 Responds to SALP Repts 50-280/90-16 & 50-281/90-16 for Period 890701-900331.Corrective Actions Focus on Issues of Maint Backlog,Maint planning,post-maint Testing,Staffing & Procurement ML20043H9421990-06-21021 June 1990 Forwards Proprietary WCAP-12351, North Anna Unit 1 Evaluation for Tube Vibration Induced Fatigue, Per Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs. Rept Withheld (Ref 10CFR2.790) ML18153C2611990-06-21021 June 1990 Responds to NRC 900522 Ltr Re Violations Noted in Insp Repts 50-280/90-07 & 50-281/90-07.Corrective actions:as-built Configurations of 120-volt Ac & Dc Vital & Semivital Panel Breaker Installations Verified to Be Acceptable ML18153C2581990-06-18018 June 1990 Forwards Reissued Semiannual Radioactive Effluent Release Rept,Jul-Dec 1989. Rept Contains Info Re SR-89,Sr-90 & Fe-55 Analytical Results for Liquid Composite Samples ML18153C2591990-06-18018 June 1990 Forwards Response to NRC 900524 Request for Addl Info Re NRC Bulletin 88-004, Potential Safety-Related Pump Loss. Engineering Will Initiate Study to Evaluate Enhancements of Cooldown & Possible Heatup Operation ML20055C8661990-06-15015 June 1990 Forwards Application for Reissuance of NPDES Permit ML20043G5711990-06-15015 June 1990 Forwards Response to Request for Addl Info Re Insp Rept 50-339/89-20 Concerning Plant Safety Sys Outage Mod Insp. Response Withheld (Ref 10CFR73.21) ML20043H1131990-06-15015 June 1990 Concludes That Removal of Temporary Loose Parts Monitoring Sys Does Not Increase Probability of Acccident,Create Possibility of New Kind of Accident & Does Not Reduce Margin of Safety ML18153C2541990-06-15015 June 1990 Forwards Corrected Tech Specs Page 3.1-3,per Identification of Typo in 900522 Application for Amends to Licenses DPR-32 & DPR-37 ML20043G8731990-06-14014 June 1990 Discusses Evaluation of ASME Section XI Testing for Outside Recirculation Spray Pumps ML18153C2521990-06-14014 June 1990 Responds to NRC 900515 Ltr Re Violations Noted in Insp Repts 50-280/90-09 & 50-281/90-09.Corrective Actions:Abnormal Procedures & Fire Contingency Action Procedures Being Upgraded Via Technical Procedure Upgrade Program ML20043H2091990-06-13013 June 1990 Forwards List of Corrective Actions & Current Status in Response to NRC Bulletin 88-004, Potential Safety-Related Pump Loss ML20043F4531990-06-0808 June 1990 Forwards, Core Surveillance Rept for North Anna 2,Cycle 7 W/Extended License Burnup Limit. Rept Contains Specific Power Distribution Limits Applicable for Cycle 7 Operation W/Burnup Limit Extension ML18153C2501990-06-0808 June 1990 Confirms That Primary Policy Re Onsite Property Damage Insurance,Provided by Nuclear Mutual Limited 1990-09-07
[Table view] |
Text
e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND? VIRGINIA 23261 W. L. STEWART VICE PRESIDENT NUCLEAR OPERATIONS July 1, 1983 Mr. Harold R. Denton, Director Serial No. 006A Office of Nuclear Reactor Regulation NO/JHL:acm Attn: Mr. D. G. Eisenhut, Director Docket Nos. 50-280 Division of Licensing 50-281 U. S. Nuclear Regulatory Commission 50-338 Washington, D. C. 20555 50-339 License Nos. DPR-32 DPR-37 NPF-4 Gentlemen: NPF-7 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NOS. 1 AND 2 NORTH ANNA POWER STATION UNIT NOS. 1 AND 2 PROCEDURES GENERATION PACKAGE SUBMITTAL Per our Response to Supplement 1 to NUREG-0737 (Generic Letter No. 82-33),
dated April 15, 1983 (Serial No. 006), attached is the Procedures Generation Package for the Emergency Operating Procedures for the Surry and North Anna Power Stations.
Ve~
W. L. Stewart ;.("
Attachment cc: Mr. James P. O'Reilly Regional Administrator Region II Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing Mr. Robert A. Clark, Chief Operating Reactors Branch No. 3 Division of Licensing Mr. D. J. Burke NRC Resident Inspector Surry Power Station Mr. M. B. Shymlock NRC Resident Inspector North Anna Power Station 8307120386 830701 PDR ADOCK 05000280 F PDR
50-280/281 .. SURRY ... VEPCO EMERGENCY PROCEDURE GENERATION PACKAGE w/ltr,* 7/l /83 ... 8307120386 THE ATTACHED FILES ARE OFFICIAL REC'JRDS OF THE DIVISION OF DOCUMENT CONTROL. Th!: 'i' HAVi:: SEEN CHARGED TO YOU FOR A LIMITED Tin';,~ c;ERlOD AND MUST BE RETURNED TO THE REC(h'_'D'.:. F ;~.C!UTY BRANCH 016. PLEASE DO NOT SEN::1 _DOCUPicENTS CHARGED OUT THROUGH THE MAIL. RE.'k:JV.D.L Gt ANV PAGE(S) FROM DOCUMENT FOR REPRO,J'...iCTiOf'-; MUST BE REFERRED TO FILE PERSONNEL.
DEADLINE RETURN DATE ----*------------
RECORDS FACIU,Y BRANCH
VIRGINIA ELECTRIC AND POWER COMPANY EMERGENCY PROCEDURE GENERATION PACKAGE A. INTRODUCTION This procedure generation package was developed in accordance with Item 7.2.b of Supplement 1 to NUREG-0737 and describes the method that will be used to develop and implement the initial set of improved, human factored, function and event oriented, emergency response procedures for Virginia Electric and Power Company's. Surry Power Station and North Anna Power Station.
This procedure generation package consists of the following six parts:
A. Introduction B. Procedure Development Program
- c. Writers Guide D. Procedure Verification Program E. Procedure Validation Program F. Procedure Training Program The program described in this package will be implemented by the issuance of station Administrative Procedures, or other similar documents, approved by the Station Nuclear Safety and Operating Committee (SNSOC).
In response to Item I.C.l of NUREG-0737, and because it was felt prudent to provide the operator* with improved methods for mitigating emergency events as soon as these methods became available, Vepco has been engaged in the development and implementation of improved emergency procedures for some time now. The method presently being used to develop and implement these procedures is in basic compliance with the method described in this package. However, the initial set of improved emergency procedures may not have available all the supporting documentation described in this pack~ge. Since a major revision of these procedures is: anticipated following the issuance and approval. of Revision 1 to the Westinghouse Emergency Response Guidelines, it is intended to apply the methods described in this package to these revisions.
Page 2 It is also our intent to apply the methods described in this package in the generation of future emergency procedures and in the revision of existing emergency procedures. However, changes may be made to these methods in the future by revising the Administrative Procedures: or other documents, in accordance with the applicable Technical Specification and 10CFR 50.59 requirements for revising procedures .
Page 3
B. PROCEDURE
DEVELOPMENT PROGRAM
- 1. General The procedure development program will develop plant specific emergency procedures from generic Westinghouse Emergency Response Guidelines (ERGs). The initial set of improved plant specific emergency procedures will be developed using the Basic Revision of the Westinghouse ERGs, dated September 1, 1981. Once the pending Revision 1 of the Westinghouse ERGs is issued and receives NRC approval, it will be incorporated into later revisions of the emergency procedures.
- 2. Writing Team A procedure writing team will be designated by the Superintendent Operations to develop the plant specific emergency procedures. This writing team will consist of one or more individuals knowledgeable in station operations. The leader of the team shall possess a current Reactor Operator or Senior Reactor Operator license.
- 3. Reference Material The writing team will have available and use the following reference material in developing the plant specific emergency procedures:
0 Westinghouse ERGs, 0 writers guide, 0 FSAR, 0 Technical Specifications, 0 existing plant procedures (Emergency Procedures, Abnormal Procedures, Operating Procedures, etc.),
o plant drawings, o setpoint documents, and q manufacturers technical manuals
- 4. Procedure Development
- The.writing team will follow the ERGs step by step when writing the plant specific procedures.
where required, They will change step content ana sequence based on the differences between the Westinghouse reference plant and the plant for which the procedures are being developed. They will add .,. footnoted information where designated in the ERGs. They will use the reference material as appropriate to ensure the correctness of each step.
- 5. Documentation During the writing of each procedure, each step will be documented.
This documentation will:
o justify any significant deviation between the ERG step and the procedure step, o justify the sequence of the ,step,
justify any setpoint used, and list any reference material used.
The completed documentation will provide a basis for each procedure step and will* assist in the procedure verification, review, and approval process. It will also be available for reference when making later revisions to the procedure.
Page 5 C. WRITERS GUIDE
- 1. Gen~ral The writers guide used to develop plant specific emergency procedures was initially developed to assist in the development of improved Emergency Plan Implemen~ing Procedures in 1982 and was modified to allow its use in developing other emergency response procedures.
The writers guide covers the following major topics:
.o procedure designation and numbering, o procedure format, o writing of instructional steps, and o mechanics of style.
Th.e writers guide provides guidance for writing procedures in the dual column format and gives numerous examples to illustrate the various rules. A copy of the writers guide for Surry Power Station is provided as Attachment 1. The North Anna *Power Station writers guide is identical except for certain administrative details such as power station name and referenced procedure numbers
D. PROCEDURE
VERIFICATION PROGRAM
- 1. Gen~ral Procedure verification is the process performed to confirm the written correctness of the plant specific procedure and to ensure that the applicable generic and piant specific technical information has been properly incorporated.
The* procedure verification program was developed using the industry document, Emergency Operating Procedures Verification Guideline (INPO 83-004), as guidance. This document was developed by the Emergency Operating Procedures Implementation Assistance (EOPIA)
Review Group, in which Vepco was a participant, and published by INPO.
- 2. Verification Method Procedure verification will be done using one, or both, of two different methods. These methods are:
o in-plant review method, where a verification team reviews the plant specific procedures, or o reference method, where reference is made to verification of a similar procedure at a similar plant or to verification of a generic ERG.
The method(s) used to verify a specific procedure will be determined by the Superintendent Operations based on the attributes of the procedure and the resources available at the time of verification.
- 3. Verification Team Procedure verification will be performed by one or more knowledgeable individuals (normally members of the Safety Engineering Staff)
- designated by the Superintendent Technical Services.
individuals designated to perform verification of a procedures shall Those
Page 7 not be the same individuals who wrote or revised the procedure being verified. The selection of individuals to perform verification will tak~ into consideration their:
o plant experience, o understanding of plant equipment, o understanding of ERGs~ and o familiarity with the writers guide.
- 4. Written Correctness Criteria The verification of written correctness will confirm that the information in the plant specific procedures is presented in accordance with the instructions in the writers guide. To do this, the assessment will use evaluation criteria which address the following areas:
0 legibility, 0 format consistency, o identification information, o information presentation, and o procedure referencing and branching.
- 5. Technical Accuracy Criteria The verification of technical accuracy will ensure that the technical information contained in the plant specific procedure is consistent with and adequately incorporates the technical information contained in the procedure source documents. To do this, the assessment will use evaluation criteria which address the following areas:
o entry condition (symptom) information; o instruction step, caution, and note information; o quantitative information; and o plant equipment information
- 6. Assessment Wri~ten correctness and technical accuracy will be verified by comparing each step of the plant specific procedure against the writers guide and other appropriate source documents, using the evaluation criteria. In addition, the procedure step justification documentation developed during the writing of the procedure will be used as reference material. Any discrepancies which are not addressed by the justifying documentation will be identified and documented.
- 7. Resolution Once discrepancies have been identified and documented, they will be given to the procedure writer for resolution. The writer may resolve the discrepancy by providing additional justification or by revising the step. The proposed resolution will then be returned to the verifier for acceptance. Any discrepancies which cannot be resolved between the writer and the verifier will be forwarded to the Superintendent Operations, or his designee, for final resolution.
- 8. Documentation Documentation will record the major activities performed during the verification process to facilitate future verification activities.
The documentation will include the following:
o verification method used, o discrepancies identified, o resolution of discrepancy, 0 bases for resolution, o certification of verification of written correctness, and o certification of verification of technical accuracy
E. PROCEDURE
VALIDATION PROGRAM
- 1. Gen~ral Procedure validation is the process performed to confirm that control room operators can manage emergency situations using the procedures by ensuring the usability an,d operational correctness of the procedures.
The procedure validation program was developed using guidance provided by the EOPIA Review Group, in which Vepco was a participant.
- 2. Validation Method Procedure validation will be done using any one, or a combination, of four different methods. These methods are:
o simµlator method, where control room operators perform procedure steps on a simulator using a scenario; o walk-thru method, where control room operators conduct a step-by-step enactment of their actions on the control board during a scenario without performing actual control manipulations; o table-top method, where personnel explain and discuss procedure steps in response to a scenario; o reference method, where reference is made to validation of a similar procedure at a similar plant or validation of a generic ERG.
The extent to
- which a given procedure must be validated and the method (s) to be used in validating it will be determined by the Superintendent Operations based on.., the attributes of the procedure and the resources available at the time of validation.
- 3. Operator Team The Superintendent Operations will designate an operator team to
- perform the procedure steps during validation. The composition of
Page 10 this team will be consistent with the expected numbers and level of training for a normal operating shift.
- 4. Review Team The Superintendent Operations will designate a review team to develop required scenar:i:os, observe operator responses, and identify performance deviations during procedure assessment. In selecting members of the review team, consideration will be given to their knowledge of plant operations and procedures.
- 5. Usability Criteria The validation of usability will confirm that the procedures provide sufficient and understandable information to allow the operator to manage emergency situations. To* do this, the assessment will use evaluation criteria which address:
0 o
level of detail and understandability Operational Correctness Criteria The validation of operational . correctness will confirm that the procedures are compatible with the expected operator responses, plant equipment, and shift manning. To do this, the assessment will use evaluation criteria which address:
o plant equipment compatibility and 0 operator compatibility
- 7. Scenario
- A scenario, or written description, of a transient wil1 be used to exercise* the procedure during assessment. The scenario will be
- developed by the review team and approved *by the Superintendent
Page 11 Operations or his designee. The scenario will be designed to guide the operator team through the anticipated evaluation path so the evc!luation criteria can be addressed. The detail contained in the scenario will vary depending on the validation method used. For example, the scenario for a walk-thru method will be more detailed than one used for the simulator method. The scenario will, at a
'1.*.
minimum, contain:
o prerequisite conditions and o expected sequence of plant symptoms and operator responses
- 8. Assessment Procedure usability and operational correctness will be validated using one or more of the four validation methods to exercise the procedure during the transient condition described in the scenario.
During this exercise, the review team will observe operator responses. Based on these observations and using the evaluation
the review team If appropriate, will detect a debriefing with following the exercise may also be held.
and record the performance operator team
- 9. Resolution Deviations identified during assessment will be evaluated by . the review team to determine if resolution is required. For those deviations where resolution is required, the review team will recommend a course of action, such as training, design change, or procedure revision. The Superintendent Operations, or his designee, will review the recgmmendations and determine the resolution action to be taken.
- 10. Documentation Documentation will record the major activities performed during the validation process to facilitate future validation activities. The documentation will include:
Page 12 o participants, o validation method(s) used, o scenario(s) used, o deviations identified, o resolution of deviations, o certification of validation for usability, and o certification of va].i.dation for operational correctness
F. PROCEDURE
TRAINING PROGRAM
- 1. General An emergency pro*cedure training program will be established to support the transition from the present emergency procedures to the improved procedures. Tb.e objectives of this training program are to provide the operators with:
o an understanding of the procedure structure, o an understanding of the technical bases of the procedure, o an understanding of the content of the procedure, and o the ability to use the procedure under operational conditions.
This training will be given to all licensed operators, licensed operations supervisors, and Shift Technical Advisors.
- 2. Initial Training Training on the initial set of improved procedures will be conducted prior to implementing the procedures. The training will consist of classroom instruction and simulator exercises. The classroom instruction will cover:
o general format and structure of procedures, o guidelines for use of procedures, o technical bases of each procedure, and o content of each procedure.
Simulator exercises using scenarigs will be conducted on selected procedures. During this training, the participants will perform their normal control room functions
- Page 14 3* Continuing Training Th~ existing training programs in place at both stations already contain emergency procedure training as part of operator license training and retraining programs. No changes are required in these training programs due to the introduction of the new procedures, other than to substituta,.the new procedures for the old ones.
- 4. Training on Revisions When revisions are made to the improved procedures, the Superintendent Operations will evaluate the extent of the revision and determine the training required. If the revision is judged to be minor in nature, training on the revision will be conducted through required reading (self-taught), shift briefings, or classroom instruction as part of the retraining program. Training on major revisions will be conducted by using classroom instruction and, if appropriate, simulator exercises *
- 5. Documentation Documentation of training on emergency procedures will be in accordance with the existing station requirements for documenting training.