NPDES Noncompliance Notification:On 920706,approx 3,500 Gallons of Water,Containing 5.75 mg/1 Hydrazine,Discharged to Delaware River.Caused by Tank Fill Valve Left Open Longer than Necessary.Hose Reattached to Vent Line
ML18096A873
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/05/1992
From: Vondra C
Public Service Enterprise Group
To: Kugler S
NEW JERSEY, STATE OF
References
NLR-E92238, NUDOCS 9208120029
Download: ML18096A873 (10)


Text

Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 Nuclear Department CERTIFIED MAIL RETURN RECEIPT REQUESTED ARTICLE NUMBER: P 063 762 186 NLR-E92238 Bureau of Discharge Prevention NJ Department of Environmental Protection and Energy 401 East State Street CN-027 Trenton, New Jersey 08625-0027 Attention: Ms. Shelly Kugler

Dear Ms. Kugler:

DISCHARGE OF HYDRAZINE PUBLIC SERVICE ELECTRIC AND GAS COMPANY SALEM GENERATING STATION CASE #92-07-06-0339-00 30-DAY CONFIRMATION REPORT As per the requirements of NJAC 7:1E-5.8, PSE&G has prepared the attached report confirming the discharge of approximately 3500 gallons of water containing a concentration of 5.75 mg/l of Hydrazine, (CAS # 302-01-2). The discharge was due to an overflow from the No. 2 Auxiliary Feedwater Storage Tank (AFST) at the Salem Generating station. A portion of this overflow was discharged to the Delaware River through the north yard drain outfall, DSN 487. The discharge, which occurred at the facility on July 6, 1992, occurred during a precipitation event and while the measured concentration of hydrazine in the tank was 5.75 mg/l the measured concentration at the final outfall was 0.02 mg/l.

This discharge was a result of the tank fill valve being left open longer than necessary due 'to operator error. A hose had been placed on the tank vent line in order to route any overflow to a contained area. However, the hose became displaced from the line resulting in the discharge. The hose has been reattached to the vent line. The discharge did not cause any injuries.

The discharge of Hydrazine is regulated under 40 CFR 302.4 with a reportable quantity of one (1) pound. As the discharge did not exceed the reportable quantity, no notification of the release was reported to any agency other than the New Jersey Department of Environmental Protection and Energy (NJDEPE) and the Nuclear

....-----------=_!____ ..._ .-_~ - ---- - - - - - - -

( 9208120029 9208118 '\

The Energy People 95-2168 (87 5Mi 12-90

AUG 0 5 1992 NJ DE PE 2 NLR-E92238 Regulatory Commission {NRC), as required under 10 CFR 50.72, Significant Events.

PSE&G believes it acted in accordance with the intent of NJAC 7:1E, Subchapter 5, which requires all major facilities to notify the NJDEPE of discharges of petroleum and other potentially hazardous substances in any concentration. As a result of this discharge, PSE&G has taken measures to prevent recurrence of this inci.dent.

  • should you have any questions concerning the information contained herein, or require additional information, please contact Mr. David K. Hurka of Licensing and Regulation at

{60~) 339-1275.

AUG 0 51992 NJDEPE 3 NLR-E92238 c New Jersey Department of Environmental Protection and Energy Division of Responsible Party Site Remediation Southern Regional Enforcement 20 E. Clementon Road

  • Gibbsboro, New Jersey 08026 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C., 20555 Salem County Department of Health 98 Market street Salem, New Jersey 08079 Attention: Mr. James Warner

DISCHARGE CONFIRMATION REPORT CASE NO. 92-07-06-0339-00 INFORMATION RELATED TO DISCHARGE OF HYDRAZINE FROM SALEM GENERATING STATION INDIVIDUAL REPORTING DISCHARGE:

J. Serwan Senior Nuclear Shift Supervisor Public Service Electric and Gas Salem Generating Station P. 0. Box 236, M/C SOl Hancocks Bridge, New Jersey 08038 (609) 339-5200 INDIVIDUAL SUBMITTING CONFIRMATION REPORT.:

c. A. Vondra General Manager - Salem Operations Public Service Electric and Gas Nuclear Department P. O. Box 236, M/C SOS Hancocks Bridge, New Jersey 08038 (609) 339-2900 FACILITY OWNER/OPERATOR:

Public Service Electric and Gas Co.

P. o. Box S70-17G Newark, New Jersey 07101-0S70 (201) 430-5868 INDIVIDUAL(S) RESPONSIBLE FOR THE DISCHARGE:

c. A. Vondra General Manager - Salem Operations Public Service Electric and Gas Nuclear Department P. o. Box 236, M/C sos Hancocks Bridge, New Jersey 08038 (609) 339-2900 DISCHARGE SOURCE:

No. 2 Auxiliary Feedwater Storage Tank The discharge was caused by an overflow of the No. 2 AFST during a refilling operation and the subsequent failure of a temporary diversion hose. A portion of this overflow entered the yard drain system and discharged to the Delaware River through outfall DSN 487.

DISCHARGE CONFIRMATION REPORT CASE NO. 92-07-06-0339-00 INFORMATION RELATED TO DISCHARGE OF HYDRAZINE FROM SALEM GENERATING STATION DISCHARGE LOCATION:

Salem Generating Station End of Buttonwood Road Block#: 26 Lot#: 4.01 Municipality: Lower Alloways Creek Township County: Salem County Zip Code: 08038.

Tax #: 22-1212-800 EPA ID#: NJD077070811 (Map enclosed - See Figures 1 and 2)

CHEMICAL DISCHARGED: Hydrazine CAS Number: 302-01-2 QUANTITY DISCHARGED: Approximately 3500 gallons DATE/TIME DISCHARGE BEGAN: July 6, 1992 0230 hours0.00266 days <br />0.0639 hours <br />3.80291e-4 weeks <br />8.7515e-5 months <br /> DATE/TIME DISCHARGE ENDED: July 6, 1992 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> DATE/TIME DISCHARGE DISCOVERED: July 6, 1992 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> DATE/TIME DISCHARGE REPORTED July 6, 1992 0339 hours0.00392 days <br />0.0942 hours <br />5.605159e-4 weeks <br />1.289895e-4 months <br /> TO NJDEPE HOTL.,TNE:

JUSTIFICATION FOR DELAY IN 15 MINUTE NOTIFICATION:

At the time of the spill, hydrazine was not believed to be present in the discharge. When the presence of hydrazine was confirmed by analysis, the spill was immediately reported to the NJDEPE Hotline.

DISCHARGE CONFIRMATION REPORT CASE NO. 92-07-06-0339-00 INFORMATION RELATED TO DISCHARGE OF HYDRAZINE FROM SALEM GENERATING STATION MEASURES TAKEN TO CONTAIN, CLEANUP AND REMOVE THE DISCHARGE:

Upon discovery of the overflowing tank, Operations personnel immediately closed the fill valve, reattached the diversion hose and called Chemistry personnel so that the overflow could be analyzed. No cleanup of this discharge was warranted due to the breakdown of hydrazine in the presence of oxygen and naturally occurrring organics, both of which were plentiful due to the precipitation event. As a result, no cleanup costs are associated with this discharge.

CORRECTIVE MEASURES:

A design change, DCP # lEC-3123, was completed July 8, 1992 which by design will prevent the addition of hydrazine to both the No.,

1 and No. 2 AFST's in the future. This design change provides a-permanent injection point downstream of the Auxiliary Feedwater Pumps and discharge check valves. The check valves will prevent the addition of hydrazine to the AFST's while hydrazine is being added to the steam Generators.

INDIVIDUAL(S) INVOLVED IN CONTAINMENT/CLEANUP:

Containment activities associated with the release of the hydrazine, consisting of closing #2AFST fill valve and reattaching the diversion hose, were conducted by Operations personnel. The, responsible individual is:

Philip P. O'Donnell -

Operating Engineer Public Service Electric & Gas Salem Generating Station P. o. Box 236, M/C SOl Hancocks Bridge, NJ 08038 (609)339-2622

DISCHARGE CONFIRMATION REPORT CASE NO. 92-07-06-0339-00 INFORMATION' RELATED TO DISCHARGE OF HYDRAZINE FROM SALEM GENERATING STATION TYPE, QUANTITY, LOCATION AND DATE OF SAMPLES:

QUANTITY: Five INDIVIDUAL CONDUCTING ANALYSIS: William Pauley Public Service Electric & Gas Chemistry Department PO Box 236, M/C SO?

Hancocks Bridge, Nj 08038 (609)339-2651 QUALITY ASSURANCE PROCEDURES: Procedures requiring the use of check standards,blanks, buffers and control charts.

SAMPLE METHODOLOGY: Hydrazine - Chemets and/or UV/VIS Spectrophotometry RATIONALE FOR SAMPLING LOCATION &

NUMBER OF SAMPLES: One sample was obtained to to determine if the discharge was reportable. The other samples were obtained to determine the extent and concentration of the release.

The samples were obtained from the tank itself and various yard drain inlets.

FINANCIAL RESPONSIBILITY:

PSE&G satisfies the requirements for self-insurance established by N.J.A.C. 7:1E-4.5(g) and will include appropriate documentation of this in its Discharge Cleanup and Removal (OCR)

Plan as required by N.J.A.C. 7:1E-4.4(a)9.

J

  • CERTIFICATION state of New Jersey:

County of Salem . SS I certify under penalty of law that the information provided in this document is true, accurate and complete. I am aware that there are significant civil and criminal penalties, including fines or imprisonment or both, for submitting false, inaccurate or incomplete information.

Sworn and subscribed b9/!15..re m~

on this f" day of ~~' 1992.

Notary Pub~ c'~aA<Y lbma

I /

{

... \*

\ '

' FIGURE 1)

ARTIFICIAL ISLAND

~ ,

~\. \

\ .

\\

\\

\\

\ \\

.\

\ .

~ \\

\ \\

\ \\\\ -

\'

'1,

' \ 1JC*

  • I

(',

((]

) .\

\

"\

\

\\ \ I I

i H

F I

J \

  • ~

\ \

\

' DI :3CHAR1:;E

  • CJ

.s E NO.

FIGURE 2 92-07-06-0339-0~ .

I / '

,.