LER 96-005-00:on 960312,failure to Properly Test Containment Bldg Outer Personnel Air Lock Door Occurred.Caused by Personnel Error.Individual Involved Counseled.W/Undated Ltr
ML18012A213
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/15/1996
From: Donahue J, Verrilli M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-96-045, HNP-96-45, LER-96-005-01, LER-96-5-1, NUDOCS 9604180464
Download: ML18012A213 (6)


Text

CATEGORY 1 REGULATE INFORMATION DISTRIBUTION%STEM (RIDE)

ACCESSION NBR:9604180464 DOC.DATE: 96/04/15 NOTARIZED: NO DOCKET 4 FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAM='UTHOR AFF LIATION VERRILLr,M Carolina Power a Light Co.

DONAHUE,.T.W. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION SUB ECT: LER 96-005-00:on 960312,failure to properly test containment bldg outer personnel air lock door occurred. Caused by personnel error. individual involved counseled.W/undated ltr.

DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.

E NOTES:Application for permit renewal filed. 05000400 G

FECIPIENT COPIES RECIPIENT COPIES

D CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 LE,N 1, 1 INTERNAL: ACRS 1 1 AEOD~BQ/RAB 2 2 AEOD/SPD/RRAB 1 1 C'ILE CSeÃb 1 1 NRR/DE/ECGB 1 1 NRR/DE/EELB 1 1 NRR/DE/EMEB 1 1 NRR/DRCH/HHFB 1 1 NRR/DRCH/HICB 1 1 NRR/DRCH/HOLB 1 1 NRR/DRCH/HQMB 1 1 NRR/DRPM/PECB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 .1 RES/DSIR/EIB 1 1 RGN2 FILE 01 1 1 D EXTERNAL: L ST LOBBY WARD 1 1 iITCO BRYCEFJ H 2 2 NOAC MURPHY,G.A 1 1 NOAC POORE,W. 1 NRC PDR 1 1 NUDOCS FULL TXT . 1 1 E

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESKi ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl FULi TEXT CONVERSION REQJIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 26

Carolina Power & Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 U.S. Nuclear Regulatory Commission Serial: HNP-96-045 ATTN: NRC Document Control Desk 10CFR50.73 Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 LICENSEE EVENT REPORT 96-005-00 Gentlemen:

In accordance with Title 10 to the Code of Federal Regulations, the enclosed Licensee Event Report is submitted. This report concerns a failure to test the Containment Building Outer Personnel Air Lock door as required by Technical Specifications.

Sincerely, J. W. Donahue General Manager Harris Plant MV Enclosure c: Mr. J. B. Brady (NRC - HNP)

Mr. S. D. Ebneter (NRC - RII)

Mr. N. B. Le (NRC - PM/NRR)

~

9604iS0464 9604i5 PDR ADQCK 05000400 S PDR State Road ll34 New Hill NC

U. S. Nuclear Regulatory Commission Document Control Desk / HNP-96-045 Page 2 of 2 CC: Ms. P. B. Brannan Mr. R. K. Buckles (LIS)

Mr. W. R. Campbell (BNP)

Mr. J. M. Collins Mr. J. P. Cowan Mr. G. W. Davis Ms. S. D. Floyd Ms. S. F. Flynn Mr. H. W. Habermeyer, Jr.

Mr. G. D. Hicks (BNP)

Mr. M. D. Hill Mr. W.,J. Hindman Mr. R. M. Krich (RNP)

Ms. W. C. Langston Mr. C. W. Martin (BNP)

Mr. R. D. Martin Mr. J. P. McKone Mr. J. W. Moyer (RNP)

Mr. P. M. Odom (RNP)

Mr. W. R. Robinson Mr. G. A. Rolfson Mr. C. T. Sawyer Mr. R. S. Stancil Mr. G. M. Stokes Mr. J. P. Thompson (BNP)

Mr. T. D. Walt HNP Real Time Training INPO NLS File: HI/A-2D (L. M. Randall)

Nuclear Records

I NRC FORIUI 366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB No. 3150 0104 44 S5) EXPIRES 04130I98 ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THIS MANDATORY INFORMATION COLLECTIOH REOUEST: 50.0 HRS. REPORTED LESSONS LEARNED ARE LICENSEE EVENT REPORT (LER) INCORPORATED INTO THE UCENSlNG PROCESS ANO FEO BACK TO INDUSTRY.

FORWARD COMMENTS REGAROIHG BURDEN ESTIMATE TO THE INFORMATION AND RECORDS MANAGEMENT BRANCH IT4) F33L US. NUCLEAR REGULATORY COMMISSION, (See reverse for required number of WASXlNGTON, OC 205554)00), AND TO THE PAPERWORK REDUCTION PROJECT (3)50 digits/characters for each block) OI04L OFFICE OF MANAGEMENT ANO BUDGET, WASHUIGTON, OC 20503.

FACILITY NAME I)) DOCKET NUMBER (2) PAGE (3)

Harris Nuclear Plant Unit-1 50-400 1 OF 2 TITLE 44)

Failure to properly test the Containment Building Outer Personnel Air Lock door, resulting in a Technical Specification violation.

EVENT DATE (5) LER NUMBER (6) REPORT DATE (7) OTHER FACILITIES INVOLVED (8)

FAG IL)TY NAME DOCKET NUMBER SEQUENTIAl REVISION MONTH OAY YEAR MONTH OAY YEAR NUMBER NUMBER 05000 FACILITYNAME OOCKETNUMBER 15 96 96 005 00 15 96 05000 OPERATING THIS REPORT IS SUBMITTED PURSUANT To THE REQUIREMENTS OF 10 CFR I): (Chock one or more) (ill MODE (9) 20. 2201 (b) 20.2203(a) (2)(v) 50.73(a) (2)(i) 50.73(a)(2) (viii)

POWER 20.2203(3)(1) 20.2203(al(3)(i) 50.73(a)(2)(iil 50.73(al(2) (x) 1 00ok LEVEL (10) 20.2203(a) (2)(i) 20.2203(a) (3) (iil 50.73(a) (2) (iii) 73.71 20.2203(a) (2) (ii) 20.2203(a)(4) 50.73(al(2)(iv) OTHER 20.2203(al(2)(iii) 50.36(c)(1) 50.73(al(2)(v) Spectlv m Abstract below or tn NRC Form 366A 20.2203(a) (2) (iv) 50.36(c) (2) 50.73(a) (2)(vii)

LICENSEE CONTACT FOR THIS LER (12)

NAME TELEPNONE NUMBER ltrtcrvrta Area Cate)

Michael Verrilli Sr. Analyst - Licensing (919) 362-2303 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT (13)

REPORTABLE REPORTABLE CAUSE SYSTEM COMPONENT MANUFACTURER CAUSE SYSTEM COMPONENT MANUFACTURER TO NPROS TO NPROS SUPPLEMENTAL REPORT EXPECTED (14) EXPECTED MONTH OAY YEAR YES SUBMISSION (If yos, complete EXPECTED SUBMISSION DATE). X No DATE (15)

ABSTRACT (Limit to 1400 spaces, i.o., approximately 15 singlo-spaced typowrinon lines) (16)

On March 12, 1996, surveillance testing was performed on the Containment Building Personnel Air Lock (PAL)

Barrel to satisfy the six month type-8 local leak rate testing required by Technical Specification 4.6.1.3.b. This testing measures overall leakage across the PAL barrel from inside containment to outside. During thir process, the outer door was opened as required by the surveillance procedure, but due to a misinterpretation of Technical Specification requirements, individual door seal leakage across the outer door was not tested within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after opening, per the requirements of Technical Specification 4.6.1.3.a. This condition was caused by personnel error on the part of the individual that coordinated the PAL testing. Corrective actions included counseling the involved individual.

N M

NRC fORM 35oA US. NUCLEAR REGUUITORT COMMISSION j4.95)

LiCENSEE EVENT REPORT (LER)

TEXT CONTINUATION fACIL)tt NAME u) OOCKET LER NUMBER (6) PAGE 0)

SEOUENTIAL Rty)SION TEAR NUMBER NUMBER Shearon Harris Nuclear Plant . Unit 41 50400 2 OF 2 96 - 005 00 TEXt rN moro sposo ls rovvi orL vso orr<N<oosl ropes ol A'RC Form NQI I) il EVENT DESCRIPTION:

On March 12, 1996, Engineering Surveillance Test (EST-222), Containment Building Personnel Air Lock (PAL)

Barrel Overall Test (EIIS Code NH-AL) was performed to satisfy the six month type-8 local leak rate testing (LLRT) required by Technical Specification 4.6.1.3.b. This testing measures overall leakage across the PAL barrel from inside containment to outside. During this process, the outer door was opened, as directed by the surveillance procedure, to place a pyrometer in the airlock chamber to monitor temperature. Following completion of EST-222, the PAL outer door was not tested for individual door seal leakage within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> as required by Technical Specification 4.6.1.3.a. This condition was identified on March 16, 1996, when the Operations control room staff, closing an associated Equipment Inoperable Record, questioned Engineering (LLRT) personnel about Technical Specification testing requirements. When this question was raised, an incorrect determination was made by the LLRT test coordinator that the overall barrel test satisfied the testing requirements for individual door seal leakage. This determination was also contrary to a precaution and limitation contained in EST-222, which states that the individual door seal leakage requirements of Technical Specification 4.6.1.3.a are not satisfied and that the PAL Door Seal LLRT Test (EST-219) shall be performed as required.

This condition constitutes a violation of Technical Specifications. The decision to not perform an individual door seal leakage test following an overall barrel test has also occurred previously. It has been a practice during the last 4 barrel tests (approximate 2 year period) for LLRT testing personnel to use the barrel overall test to meet the individual door seal test requirements. Prior to the recent four barrel overall tests, the PAL outer door was immediately tested following removal of the temperature monitoring pyrometer. This condition is reportable per 10CFR50.73(a)(2)(i)(B).

CAUSE:

This condition was caused by personnel error on the part of the individual coordinating the PAL LLRT testing.

Specifically, upon completion of EST-222, the LLRT test coordinator determined that individual door seal leakage testing on the outer door was not required since the overall test had been satisfactorily completed. This determination was based on past experience and an interpretation of design testing requirements, but was not cognitive. The individual incorrectly assumed that the PAL overall barrel test satisfied Technical Specification testing requirements and did not comply with the precaution and limitation contained in EST-222.

SAFETY SIGNIFICANCF<:

This Technical Specification violation resulted in no adverse safety consequences. The total PAL leak rate determined by EST-222 on March 12, 1996 was 332 sccm, which is below the Technical Specification individual door seal leakage acceptance criteria of 1688 seem.

PREVIOUS SIMILAR EVENTS:

There have been no previous similar events reported pertaining to PAL individual door seal leakage testing.

Corrective Actions Com leted:

1. The individual that incorrectly interpreted PAL testing requirements was counseled on March 18, 1996.

EIIS Codes:

Containment Building - NH