Monthly Operating Rept for Mar 1994 for Shearon Harris Nuclear Power Plant,Unit 1.W/940413 Ltr
ML18011A415
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/31/1994
From: Robinson W, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-94-030, HNP-94-30, HO-940294, NUDOCS 9404190337
Download: ML18011A415 (8)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION ROGERS,S.G. Carolina Power & Light Co.

ROBINSON,W.R. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for for Shearon Harris Nuclear Power Plant, Unit .W/940413 ltr. D DISTRIBUTION CODE: IE24D COPIES RECEIVED LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed. 05000400

/

A RECIPIENT COPIES RECIPIENT COPIES D ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 LE,N 1 1 D

INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 NRR/AORS/OEAB 1 1 NRR/DRIL/RPEB 1 1 EC~ILE 01 1 1 RGN2 1 1 EXTERNAL EG&G BRYCE i J ~ H 1 1 NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 21

Carolina Power & Light Company William R. Robinson PO Box 165 Vice President New Hill NC 27562 Horns Nuclear Plant

.APR 1 3 1994 File: HO-940294 Serial HNP 94-030 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT Gentlemen:

In accordance with Technical Specification 6.9.1.5 for the Shearon Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of March 1994.

Very truly yours, SGR:dtp Attachments c: Mr. S. D. Ebneter (NRC-RII)

Mr. N. B. Le (NRR)

Mr. J. E. Tedrow (NRC-SHNPP) 9404190337 940331

'ADOCK 05000400 QQ ~'R

' "., 'PDR ". P,DR '.

State Road 1134 New Hill NC Tel 919362-2502 Fax 919362.6950 /pe

C

'I

1. ~

. United".States Nuclear Re atory Commission Page 2 bc: Mr. T. A. Baxter, Esq.

Ms. C. M. Brown Mr. R. K. Buckles (LIS)

Mr. W. R. Campbell Mr. H. W. Habermeyer, Jr.

Mr. E. M. Harris Ms. T. A. Head (GLS File)

Mr. J. D. Heidt Mr. W. J. Hindman Mr. G. Honma (BNP)

Mr. R. M. Krich (RNP)

Mr. R. D. Martin Admiral K. R. McKee Mr. J. W. Moyer Mr. W. S. Orser Mr. G. A. Rolfson Mr. L. S. Rowell Mr. R. S. Stancil Mr. M. G. Wallace

.Nuclear. Records File: HI/A-2D

Serial HNP-94-030 Page 1 of 4 CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 04/05/94 OPERATING DATA REPORT RPD36-000 RUN TIME 11:04:39 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS TELEPHONE (919)362-2573

1. UNIT NAME: HARRIS UNIT 1 'OTES
2. REPORTING PERIOD: MARCH 94
3. LICENSED THERMAL POWER (MWT): 2775
4. NAMEPLATE RATING (GROSS MWE): 950.9
5. DESIGN ELECTRICAL RATING (NET MWE): 900.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920 0

~

7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS: NONE
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
10. REASONS FOR RESTRICTION IF ANY: N/A THIS YR TO CUMUL MONTH DATE ATZVE
11. HOURS IN REPORTING PERIOD 744.00 2160.00 60625.00
12. NUMBER OF HOURS REACTOR CRITICAL 433. 83 1849. 83 50152. 14
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR",ON LINE 433.55 1849.55 49627.18
15. UNIT RESERVE SHU)DOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1159652.52 5068200.06 132326854.02
17. GROSS ELEC. ENERGY GEN. (MWH) 389451.00 1708521.00 44142742.00
18. NET ELEC. ENERGY GENERATED (MWH) 359213.00 1596319.00 41129716.00
19. UNIT SERVICE FACTOR 58. 27 85.63 81.86
20. UNIT AVAILABILITYFACTOR 58.27 85.63 81.86
21. UNIT CAP. FACTOR (USING MDC NET) 56.14 85. 93 78. 89
22. UNIT CAP. FACTOR <USING DER NET) 53.65 . 82.12 75.38
23. UNIT FORCED OUTAGE RATE .00 .00 3.22
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Unit was shutdown on Harch 19, 1994 for Refueling Outage Number 5.

Planned duration for Outage is 45 days.

25. IF sHUTDowN AT END QF REPQRT PERI0D, EsTIMATED DATE QF sTART UP: Hay 2, 1994
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9

Serial HNP-94-030 CP&L CO P a PERFORMANCE DATA SYSTEM PAGE 1 Page 2 of '4',

RUN DATE 04/05/94 APPENDIX B - AVERAGE DAILY POHER LEVEL RPD39-000 RUN TIME 11:04:38 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 MARCH 1994 DAY AVG. DAILY POHER LEVEL DAY AVG. DAILY POHER LEVEL (5lE-NET) (MHE-NET) 880 17 786 874 18 755 877 -31 873 20 -32 874 21 875 22 -25 864 23 -18 861 24 866 25 "12 10 853 26 "12 857 27 -9 12 851 28 13 842 29 -12 812 30 -12 15 798 31 -12 16 791 Note: There were 2 significant power reductions for the month of hfarch.1994.

Please see summary on attached'nit Shutdowns and Power Reduction reports.

1.16 - 8

UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME: Harris DATE: 4/5/94 COMPLETED BY: S. G. Rogers TELEPHONE: (91 9) 362-2573 SERIAL NO.: HNP-94t030 REPORT MONTH: MARCH 1994 R~

Tl e Method No. Date y Duration a of System Component Cause 5. Corrective (Hours) s Shutting Event Code 4 Code 5 Action to P

e 0 Reactor'icensee Down Report ¹ Prevent Recurrence n

94-006 940307 0 N/A zz zzzzz Unit ramped down in preparation for refueling outage 5 which commenced on 3/19/94 at 01:33.

1 2 3 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-01 61)

E-Operator Training 5 License Examination 5-Reduced Load F-Administrative 6-Other 5 G-Operational Error (Explain) Exhibit 1 - Same Source H-Other (Explain)

W S 00 tb lA 0

I C

I C) o

UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME: Harris DATE: 4/5/94 COMPLETED BY: S. G. Rogers TELEPHONE: (91 9) 362-2573 SERIAL NO.: HNP-94 030 REPORT MONTH: MARCH 1994 R~

T e Method No. Date y Duration a of Licensee System Component Cause 8a Corrective P (Hours) s Shutting Event Code 4 Code 5 Action to e 0 Down Report ¹ Prevent Recurrence n Reactor 94-007 940319 310.45 N/A zz Zzzzz Unit was shutdown for the scheduled RF05 refueling outage.

1 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-01 61)

E-Operator Training 5 License Examination 5-Reduced Load F-Administrative 6-Other 5 G-Operational Error (Explain) Exhibit 1 - Same Source H-Other (Explain)