Monthly Operating Rept for Feb 1994 for Shearon Harris Nuclear Power Plant.W/940310 Ltr
ML18011A395
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/28/1994
From: Crenshaw A, Robinson W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-94-021, HNP-94-21, NUDOCS 9403150448
Download: ML18011A395 (7)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM

. REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION CRENSHAW,A. Carolina Power & Light Co.

ROBINSON,W.R. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept eb 1994 for Shearon Harris Nuclear Power Plant. 40310 D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed. 05000400 A

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-1 PD 1 1 LE,N 1 1 D

INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 N B~CgtS/OEAB 1 1 NRR/DRIL/RPEB 1 1 MBXZS 01 1 1 RGN2 1 1 EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 R

D D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 21

t I'

~

f I

Carolina Power 8 Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 MAR $ 0 l994 File HO 941033 Serial HNP-94-021 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATIONS REPORT Gentlemen:

r In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of February 1994.

Very truly yours, W. R. Robinson SGR:smh Attachments c: Mr. S. D. Ebneter (NRC-RII)

Mr.'N. B. Le (NRR)

Mr. J. E. Tedrow (NRC-SHNPP)

.'9403iS0448 940228

'PDR ADOCK 05000400

. PDa-,,

State Road 113'ew Hill NC i

/

C I

J ll as

Serial HNP-94-021 O Page 1 of 2 OPAL .CO PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 03/03/94 OPERATING DATA REPORT RPD36-000

~

RUN TIME 09:30:25 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY AMA)U)A CRENSHAW OPERATING STATUS TELEPHONE (919)362-2808

1. UNIT NAME: HARRIS UNIT 1 'OTES
2. REPORTING PERIOD: FEBRUARY 94
3. LICENSED THERMAL POWER (MWT): 2775
4. NAMEPLATE RATING (GROSS MWE): 950.9
5. DESIGN ELECTRICAL RATING (NET MWE): 900.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 '.

MAX DEPENDABLE CAPACITY (NET MWE): 860.0

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIvE REAsoNS. None
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): None
10. REASONS FOR RESTRICTION IF ANY: N/tA THIS YR TO CUMUL MONTH DATE ATIVE
11. HOURS IN REPORTING PERIOD 672. 00 1416. 00 59881, 00
12. NUMBER OP HOURS REACTOR CRITICAL 672. 00 1416. 00 49718. 31
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 672.00 1416.00 ,

49193.63

15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1859818.32 3908547.54 131167201.50
17. GROSS ELEC. ENERGY GEN. (MWH) '27389.00 1319070.00 43753291.00
18. NET ELEC. ENERGY GENERATED (MWH) 588277.00 1237106.00 40770503.00
19. UNZT SERVICE FACTOR 100.00 100.00 82.15
20. UNIT AVAILABILITYFACTOR 100.00 100.00 82.15
21. UNIT CAP. FACTOR (USING MDC NET) 101.79 101.59 79.17
22. UNIT CAP. FACTOR (USING DER NET) 97.27 97.07 75.65
23. UNIT FORCED OUTAGE RATE .00 .00 3.25
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Unit Scheduled for shutdown on March 19, 1994 for Refu cling Outage Number 5.

Planned duration for Outage is 45 days.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR To COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COPHERCIAL OPERATION 1.16 - 9

CP&L CO PLANT PERFORHANCE DATA SYSTEH t

PAGE Serial Page 2 1

HHP-94-021 of 2 RUN DATE 03/03/94 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 RUA TIHE 09:30:25 HARRIS UNIT 1 DOCKET NO. 050"400 COHPLETED BY AHANDA CRENSBAW TELEPHONE (919)362-2808 FEBRUARY 1994 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (HWE-NET) (HWE-NET) 880 17 877 881 '18 675 878 19 871 877 20 836 874 21 871 875 22 878 876 23 880 872 876 865 25 877 10 881 26 877 883 27 880 12 881 28 880 13 879 879 15 876 16 877 Note: There were no significant power reductions for the month of February 1994.