Monthly Operating Rept for Aug 1992 for Harris Nuclear Power Plant Unit 1.W/920915 Ltr
ML18010A766
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/31/1992
From: Crenshaw A, Vaughn G
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-923026, NUDOCS 9209170246
Download: ML18010A766 (13)


Text

accz~m~rzo o~ raxam.rOw OzmOxs a~nOw svSvzrvr REGULAT, INFORMATION DISTRIBUTION ZSTEM (RIDS) e:>>>>>> << . *: ssyesrzr FACIE.-:50 400 Shearon Harris Nuclear Power Plant, Unit 1, Ca'rolina DOCKET 05000400 AUTH. NAME AUTHOR AFFILIATION CRENSHAW,A. Carolina Power & Light Co.

VAUGHN,G.E. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly oper for Aug 1992 for Harris Nuclear Power, Plant unit 1 920915 r.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed. 05000400

/

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 3 3 PD2-1 PD 1 1 LE,N 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRRJKRQ/ PEB10 1 1 NRR/DOEA/OEAB 1 1 REG FILE 01 1 1 RGN2 1 1 EXTERNAL: EGSG BRYCEgJ.H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

t, c

~ ~

A II

CNNtL Carolina Power & Light Company P.O. Box 165 ~ New Hill NC 27562

~

G. E. VAUGHN Vice President Harris Nucfear Project SEP i 5 j992 File Number: SHF/10-15505 Letter Number: HO-923026 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO. 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power 6r Light Company herewith submits the report of operation statistics and shutdown experience for the month of August 1992.

Yours very truly, G. E. Vaughn Vice President Harris Nuclear Project APC:kjc Enclosure cc: Mr.-S. D. Ebneter (NRC-RII)

Mr. R. G. Oehl (DOE)

Mr. J. E. Tedrow (NRC-SHNPP)

'ti209170246 92083l ADOCK 05000400 PDR

'DR .'

MIS/DATAREP/1/OS4 180OOB

C t

4 II 'I

DOCKET NO.: 050-400 Harris Unit DATE'ugust UNIT:

COMPLETED BY:

1992 Amanda Crenshaw 1

OPERATIONS

SUMMARY

Harris Unit 1 operated at 100 percent Availability Factor for the referenced month and a 99.62 percent Capacity Factor. There were two significant power reductions in August. Details are provided on the Unit Shutdowns and Power Reduction Sheets.

There are 157 fuel assemblies in the reactor vessel, 745 spent fuel assemblies stored in the Spent Fuel Pools. 413 of the spent fuel assemblies are BWR and were shipped to Harris from CP6L's Brunswick Plant. 168 of the spent fuel assemblies are from CPGL's Robinson Plant. In addition to the spent fuel, 60 new fuel assemblies received from Westinghouse are in dry storage racks.

MIS/DATAREP/2/OS4

CPbL C5 NT PERFORMANCE DATA SYSTEM PAGE

" RUN DATE 09/03/92 OPERATlNG DATA REPORT RPD36-000 RUN TIPIE >6:23:3f HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY AMAHDA CRENSHAW OPERATING STATUS TELEPHONE (919)362-2868 UNIT NAME: HARRIS UNIT 1 ( NOTES 2 J REPORTING PERIOD: AUGUST 92 I 3 ~ LICENSED THERMAL POWER (MWT): 2775 I See Operations Summary.

4 NAMEPLATE RATING (GROSS MWE): 950.9 I

5. DESIGN ELECTRICAL RATING (NET MWE>: 900.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE>: 920.0 l 7 ~ MAX DEPENDABLE CAPACITY (NET MWE): 860.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7> SINCE LAST REPORT, GIVE REASONS: N/A
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): 95/
10. REASONS FOR RESTRICTION IF ANY: Due to problems with Governor Valve f/4, unit power will be maintained at 95/ until the plant enters Refueling Outage number 4. The governor valve will be repaired during the outage.

THIS YR TO CUMUL MONTH DATE ATIVE HOURS IN REPORTIHG PERIOD 744.06 5855.00 46776.60 f2. NUMBER OF HOURS REACTOR CRITICAL 744.00 5537.95 38525.95

13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
34. HOURS GENERATOR OH LIHE 744.00 5508.83 38662.93

$ 5. UNIT RESERVE SHUTDOWN HOURS .00 .60 .06

)6. GROSS THERMAL ENERGY GEH. (MWH) 2045905.38 14841196.62 <008<7315.16

17. GROSS ELEC. ENERGY GEN. (MWH) 678723.00 4965545.00 33566908.06
38. NET ELEC. ENERGY GENERATED (MWH) 637403.00 4643715.66 31242378.66 UNlT SERVICE FACTOR <66.66 94.09 81.37
20. UNIT AVAILABILITYFACTOR 166.60 94.09 81.37
21. UNIT CAP. FACTOR (USING MDC HET) 99.62 92.22 77.66
22. UNIT CAP. FACTOR (USING DER NET) 95.f9 88. 32 74.2$
23. UNIT FORCED OUTAGE RATE .00 5.9f 4.16 SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling Outage number 4 is scheduled to begin September 12, 1992 and be completed November 21, 1992.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UHITS IH TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.(6 - 9 MEM/DATAREP/3~/OS4"

C I I

C$ '6L C() ORANT PERFORMANCE DATA SYSTEM PAGE RUN DATE 09/03/92 APPEDiX B AVERAGE DAILY POWER LEVEP RPD39-060 RUN TI(E 3 6: 2$ : 36 HARRIS UNIT 3 DOCKET NO. 050-466 COMPLETED BY AMANDA CRENSHAW TELEPHONE (939)362-2808 AUGUST DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 865 866 868 865 861 859 20 864 865 867 867 866 24 863 852 16 858 26 854 859 858 28 857 862 29 837 866 36 868 829 868 1.16 - 8 MEM/DATAREP/4'/OS4

I ~

UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME: Harris DATE: 09/08/92 COMPLETED BY: A. P. Crenshaw'919)

TELEPHONE: 362-2808 REPORT MONTH: August 1992 T1 R~ Method Cause 5 Corrective No. Date y Duration e of Licensee System Component Action to p (Hours) a Shutting Event Code 4 Code 6 Prevent Recurrence e s Down Report ¹ 0 Reactor n

92%14 920808 S 0.00 N/A Valve Power was reduced to 88% to perform the monthly turbine valve test. The test was completed satisfactorily and the unit returned to 100% at approximately 0200 on 08/09/92.

1 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: -Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-01 61)

E-Operator Training & License Examination 6-Reduced Load F-Administrative 6-Other 5 G-Operational Error (Explain) Exhibit 1 - Same Source H-Other (Explain)

I r

I PO t

J 4 I'

UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME: Harris DATE: 09/08/92 COMPLETED BY: A. P. Crenshaw TELEPHONE: (919) 362-2808 REPORT MONTH: August 1992 T1 Rz Method Cause 5 Corrective No. Date y Duration e of System Component Action to (Hours) a Shutting Event Code 4 Code 5 Prevent Recurrence e

P s Reactor'icensee Down Report ¹ 0

n 92%15 920808 F 0.00 A N/A HA Valve While unit power was at 88% to perform the turbine valve test (see Event ¹9214), a problem occurred with the Governor Valve ¹1 valve position limiter. Unit power was further reduced to 77% while repairs were made. The turbine valve test recommenced at 1645.

1 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG1 61)

E-Operator Training & License Examination 5-Reduced Load F-Administrative 6-Other 5 G-Operational Error (Explain) Exhibit 1 - Same Source H-Other (Explain)

- 'Duration hours equaled zero due to unit not online.

4 V

~ 4 i, 8

e t