ML17258A515

From kanterella
Jump to navigation Jump to search
Forwards Response to 801222 Ltr Re NUREG-0612 Control of Heavy Loads. Response Identifies Extent to Which Facility Conforms to Section 2.1, General Requirements for Overhead Handling Sys.
ML17258A515
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/01/1982
From: Maier J
ROCHESTER GAS & ELECTRIC CORP.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR GL-81-07, GL-81-7, NUDOCS 8202090246
Download: ML17258A515 (6)


Text

REGULATORY I RMATION DISTRIBUTION SYS (RIDS)

ACCESSION NBR 82020902 l6 DOC ~ DATE ~ 82/02/0 1 NOT AR I'ZED YES DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plantr Unit 1i Rochester G 05000244 AUTH INANE AUTHOR AFFILIATION MAIERp J,E, Rochester Gas L .Electric Corp.

RE'CIP ~ NAME RECIPIENT, AFFILIATION EISENHUTiD.G, Division of Licensing

SUBJECT:

Forward ds r esponse to 801222 tr r e NUREG 0612 "Control of 1

Heavy Loads." Response i,dentifies extent to which .facility conforms to Section 2, 1i "General Requirements for Overhead DISTRIBUTION -CODE: A033S,COPIES RECEI YED:LTR ENCL SIZE:.=

TITLE: Conrtol of Heavy Loads Near Spent Fuel (USI A 36) Operating Reactor NOTES: 1 copy:SEP Sect. Ldr.: 05000244 RECIPIENT COPIES . RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL ACTION ~ ORB 05 BC 7 7 NRR CLEMENSON01 INTERNAL: IE 07 2 NRR REQUAiG 09 1 1 NRR/DL/ORAB 12 1 1 NRR/DS I/ADCCS11 1 1 NR I/AE8 1 1 NRR/DS I/RA8 10 1 1 04 1 1 EXTERNAL: ACRS 13 10 1'0 LPDR 03 NRC PDR 02 1 1 NSIC 06 NTIS 1 1 9/

TOTAL NUMBER OF COPIES REQUIRED: LTTR ENCL 3

1 p

F/IFI/I T///T///

TOKK

! FIIII/F/FI/ /STIFF i Iv@88'n~ STATE ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649 ee!! p~

JOQF!r E. MAFBR T E L E F! H O N E vlcc SFTeeklent '! AREA COOE Tld 546.2700 February 1, 1982 BECalVFD 01 Mr. Darrell G. Eisenhut, Director U.S. Nuclear Regulatory Commission Division of Licensing Washington, D.C. 20555 6

~E~-

DI ITSY QQymy 8~98'~

DIIIIyIttv~iy@

TIDC

~

SUBJECT:

"Control of Heavy Loads" Response to Section 2.1, "General Re uirements For Overhead Handlin S stems"

Dear Mr. Eisenhut:

Enclosed please find our response to your letter of December 22, 1980, "Control of Heavy Loads". This response concerns Section 2.1 of said letter, General Requirements For Overhead Handling Systems.

Sincerely, J. E. Maier Subscribed and sworn to me on this /~day of February 1982 SHARON G. CAVALERI NOTARY PUBLIC, State of N. Y., Monroe County My Commission Expires March 30, 19~~

o 0

8202090246'820201 PDR ADOCK 05000244 P.. I"-, I . = .P.DR ..-.

I E

4

NUREG 0612 CONTROL OF HEAVY LOADS LIST OF COMMITMENTS (6 MONTHREPORT)

1. SPECIAL LIFTING DEVICES COMPARISON ANALYSIS DONE TO, DETERMINE EXTENT OF COMPLIANCE WITH ANSI N14.6-1978 (WESTINGHOUSE ELECTRIC CORPORATION, $ 30,317).
2. OVERHEAD HANDLING SYSTEM STUDIES TO DETERMINE LOAD WEIGHT AND HEIGHT RESTRICTIONS IN CERTAIN AREAS FOR THE FOLLOWING-
1) RHR Basement, Monorail
2) Containment 100(20) Ton Overhead Crane
3) 10 Ton Jib in Containment
4) 1 Ton Jib (E), 1 Ton Jib (W); Containment
5) 3 Ton Jib, 2 Ton Jib; Containment
6) Turbine Hall 125(25) Ton Overhead Crane
7) Intermediate Bldg. Monorail (Upper Level)
3. ANALYSIS AND MODIFICATIONS REQUIRED TO INSURE COMPLIANCE OF ALL MONORAIL SYSTEMS LISTED IN THIS REPORT WITH ANSI B30.11-1980, "MONORAILS AND UNDERHUNG CRANES" RGScE ENGINEERING 6 MODIFICATIONS $ 10,000
4. "

ADMINISTRATIVE CONTROL AND PROCEDURE DEVELOPMENT.

5. ESTIMATED ANALYTICAL COSTS 80 100K RGRE ENGINEERING

.0 li L

LL L