Confirms That Procedures in Place & Will Be Maintained to Monitor Fluid Conditions within Auxiliary Feedwater Sys & Standby Sys & Steps Included in Procedures for Recognizing Steam Binding,Per Generic Ltr 88-03, Steam Binding Of....
ML17251A099
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/24/1988
From: Snow B
ROCHESTER GAS & ELECTRIC CORP.
To: Stahle C
NRC, NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
REF-GTECI-093, REF-GTECI-NI, TASK-093, TASK-93, TASK-OR GL-88-03, GL-88-3, IEB-85-001, IEB-85-1, NUDOCS 8805310048
Download: ML17251A099 (4)


Text

,s ~ ~

ACCELERATED D1oR1BUTJON DEMONS TgON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8805310048 DOC.DATE: 88/05/24 NOTARIZED: YES DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION Rochester Gas & Electric Corp.

'NOW,B.A.

RECIP.NAME RECIPIENT AFFILIATION STAHLE,C. NRC No Detailed Affiliation Given

SUBJECT:

Confirms that procedures in place to resolve Safety Issue 93 re steam binding of auxiliary feedwater pumps. R DISTRIBUTION CODE: A063D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Resolution of Generic Sfty Issue 93,"Steam Binding of Aux Feedwtr Pum NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 S

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PDl-3 LA 1 0 PD1-3 PD 1 1 STAHLE,C 1 1" A INTERNAL: ARM/DAF/LFMB'RR/DEST/PSB 1 0 NRR OLSHAN, L 1 1 8D 1 1 NRR/DEST/RSB 8E 1 1 NRR/DOEA 11-E-4 1 1 NRR/PMAS/ILRB12 1 1 NUDOCS-ABSTRACT 1 1 OGC 15-B-18 1 0 01 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 9

8 TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL 12

~ i

( MW/i~8 4~ II 0 Isa 8P.::::.

ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649.0001 TC1,CRHON C ARCA CODC TIC 546.2700 May 24, 1988 U.S. Nuclear Regulatory Commission Document Control Desk ATTN: Mr. Carl Stahle PWR Project Directorate No. 1 Nashington, DC 20555

Subject:

Response to Generic Letter 88-03 R.E. Ginna Nuclear Power Plant, Docket No. 50-244

Dear Mr. Stahle:

In accordance with USNRC Generic Letter 88-03, Resolution of

'eneric Safety Issue 93, ".Steam Binding of Auxiliary Feedwater Pumps", Rochester Gas and Electric Corporation (RG&E) confirms that procedures are in place and vill be maintained to monitor fluid conditions within the Auxiliary Feedwater Systemtimes and the Standby Auxiliary Feedwater System each shift during when the systems are recpxired to be operable. Steps are included in the procedures for recognizing steam binding and for restoring the Auxiliary Feedwater Systems to operable status should steam binding occur." These procedure vere implemented prior to, and in agreement with the recommendations of I.E. Bulletin 85-01.

This response recpxired 12 staff hours to perform the recgxested confirmation AND 8 staff hours to prepare the written report.

Very truly yours, Bruce A. Snow Superintendent Nuclear Production

'8805310048:.880524 .

PDR ADOCK 05000244

'P 'DCD

To: U.S. Nucle egulatory Commission Page 2 Date: May 24, 1988 Subscribed and sworn to before me this 2 h day of.May, 1988.

N tary Public SAMUEL H. BROWNE R 'e.

NOTARY PUBUC, Sttne d Neet YoA 4917N1 OaF hMoeoeOy.lWaynogg, uy Con n'ear apse Bee.ml,<a~

xco U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna USNRC Resident Inspector

~

BMWOA8 H 33UUA8 NeYeeN b mQ,QUQR YRAT51 aft@ M ~&mA

,.Q orgy)f'I.+ ecaN n!

Ct~~nammre3@l