Notice of Violation from Insp on 980428-0608.Violation Noted:On or About 960206 & 980203,controls of Parts & Components Installed on EDG Not Adequate to Prevent Use of Incorrect or Defective Parts & Components
ML17164A728
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/31/1998
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML17164A727 List:
References
50-387-98-03, 50-387-98-3, 50-388-98-03, 50-388-98-3, EA-98-349, EA-98-352, NUDOCS 9808110108
Download: ML17164A728 (4)


Text

ENCLOSURE 1

NOTICE OF VIOLATION Pennsylvania Power and Light Company (PPSL)

Susquehanna Steam Electric Station (SSES)

Unit 1 and Unit 2 Docket Nos. 50-387, 50-388 License Nos. NPF-14, NPF-22 EA 98-349 EA 98-352 During an NRC inspection conducted between April 28, 1998 and June 8, 1998, one violation of NRC requirements was identified.

In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions", NUREG-1600, the violation is listed below:

10 CFR 50, Appendix B, Criterion Vill, Identification and Control of Materials, Parts and components, requires, in part, that measures shall be established for the identification and control of parts and components.

These measures shall assure that identification of the item is maintained by an appropriate means, either on the item or on records traceable to the item. These identification and control measures shall be designed to prevent the use of incorrect or defective material, parts, and components.

PP5L procedure, NDAP-QA-0201, Material Control Activities, established the requirements for receipt inspection for quality materials, and stated that all quality materials shall be forwarded to the receipt inspection group for inspection in accordance with procedure NP-QA-0401, Receiving Inspection.

NP-QA-0401, section 6.1, required, in part, item inspections to assure cleanliness.

Contrary to the above, on or about February 6, 1996 and February 3, 1998, controls of parts and components installed on the emergency diesel generators were not adequate to prevent the use of incorrect or defective parts and components, as evidenced by the following examples:

a \\

While performing maintenance activities on the "A"emergency diesel generator on or about February 3, 1998, under Work Authorization H70311 an emergency diesel generator head was installed that was not receipt inspected in accordance with NP-QA-0401, in that the head was not clean and'contained foreign material.

b.

PPSL procedure, NDAP-QA-0201, Material Control Activities, established the requirements for receipt inspection for quality materials, and stated that all quality materials shall be forwarded to the receipt inspection group for inspection in accordance with procedure NP-QA-0401, Receiving Inspection.

On or about February 6, 1996, emergency diesel generator (EDG) components were received and placed on the "C" EDG without the receipt inspection performed by the receipt inspection group.

9808220208 980732 PDR ADOCK 05000387 6

PDR

Enclosure 1

2 This is a Severity Level IV Violation (Supplement I). This violation applies to both SSES Unit 1 and 2.

Pursuant to the provisions of 10 CFR 2.201, Pennsylvania Power and Light Company is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region 1, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a "Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation or severity level, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that willbe taken to avoid further violations, and (4) the date when full compliance will be achieved.

Your response may reference or include previous docketed correspondence, if the correspondence adequately addresses the required response.

If an adequate reply is not received within the time specified in this Notice, an order or a Demand for Information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken.

Where good cause is shown, consideration will be given to extending the response time.

lf you contest this enforcement action, you should also provide a copy of your response to the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001.

Because your response will be placed in the NRC Public Document Room (PDR), to the extent possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction.

If personal privacy or proprietary information is necessary to provide an acceptable

response, then please provide a bracketed copy of your response that identifies the information that should be protected and a redacted copy of your response that deletes such information. If you request withholding of such material, you must specifically identify the portions of your response that you seek to have withheld and provide in detail the bases for your claim of withhold-ing (e.g., explain why the disclosure of information will create an unwarranted invasion of personal privacy or provide the information required by 10 CFR 2.790(b) to support a request for withholding confidential commercial or financial information). If safeguards information is necessary to provide an acceptable
response, please provide the level of protection described in 10 CFR 73.21.

Dated at King of Prussia, Pennsylvania this 31st day of July 1998