Forwards Insp Repts 50-387/98-03 & 50-388/98-03 on 980428- 0608 & Nov.Violations of Concern Since Violations Indicate Weaknesses in Control of Safety Related Maintenance Activities
ML17164A726
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/31/1998
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17164A727 List:
References
50-387-98-03, 50-387-98-3, 50-388-98-03, 50-388-98-3, EA-98-349, EA-98-352, NUDOCS 9808110101
Download: ML17164A726 (9)


See also: IR 05000387/1998003

Text

ACCESSION NBR:

FACIL:50-387

~

~

~

50-388

AUTH.NAME

HEHL,C.W.

RECIP.NAME

BYRAM,R.G.

MMeL W&MW eL

4a

\\,

REGULATORY INFORMATION DISTRIBUTION SYSTEM

(RIDS)

9808110101

DOC.DATE: 98/07/31

NOTARIZED: NO

Susquehanna

Steam Electric Station, Unit 1, Pennsylva

Susquehanna

Steam Electric Station, Unit 2, Pennsylva

AUTHOR AFFILIATION

Region

1 (Post

820201)

RECIPIENT AFFILIATION

Pennsylvania

Power

& Light Co.

DOCKET

05000387

05000388

SUBJECT:

Forwards insp repts

50-387/98-03

S 50-388/98-03

on 980428-

0608

& NOV.Violations of concern since violations indicate

'eaknesses

in control of safety related maintenance

activities.

DISTRIBUTION CODE: IEOIF

COP1'ES

RECEIVED:LTR Q ENCL J

S1ZE: 5 7 Z

TITLE: General

(50 Dkt)-Insp"Rept/Notice of Violation Response

NOTES:

05000387

RECIPIENT

XD CODE/NAME

PD1-2

PD

INTERNAL: ACRS

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS2

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

II

RECIPIENT

XD CODE/NAME

NERSES,V

AEOD/SPD/RAB

DEDRO

NRR/DRCH/HOHB

NRR/DRPM/PERB

OE DIR

RGN1

FILE

01

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

.1

1

1

EXTERNAL: LITCO BRYCE,J H

NRC PDR

NOTES:

1

1

1

1

1

1

NOAC

NUDOCS FULLTEXT

1

1

1

1

1

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE

WASTETH

TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIST

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTRO

DESK

(DCD)

ON EXTENSION 415-2083

'TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

20

ENCL

20

July 31,

1998

EA

98-349

EA

98-352

Mr. Robert G. Byram

Senior Vice President - Nuclear

Pennsylvania Power 5 Light Company

2 North Ninth Street

Allentown, Pennsylvania

18101

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-387/98-03, 50-388/98-03;

NOTICE OF VIOLATION;AND EXERCISE OF ENFORCEMENT DISCRETION

Dear Mr. Byram:

On June 8, 1998, the NRC completed an integrated inspection at your Susquehanna

Steam

Electric Station (SSES)

1 5 2 reactor facilities. The inspection covered routine activities by

the resident inspectors and announced

inspections by inspectors from the NRC Region

I

office. The enclosed report presents the results of these inspections.

The inspectors

discussed the findings of this inspection with Mr. G. Kuczynski, General Manager SSES,

and others of your staff at the exit meeting on June 9, 1998.

During the 6-week period covered by this inspection report, your conduct of activities was

characterized

by safe operation and refueling activities on Units 2 and

1 respectively.

Decision making was generally conservative.

Based on the results of this inspection, the NRC has identified violations of NRC

requirements.

These violations are cited in the enclosed Notice of Violation (Notice) and

the circumstances

surrounding them are described in detail in the subject inspection report.

The violations are of concern since they indicate weaknesses

in the control of safety

related maintenance activities.

Weaknesses

in the control of maintenance

activities,

in'eneral,

have resulted in several past transients at Susquehanna.

The NRC also reviewed a licensee identified issue involving the operability'of 4.16 KV

switchgear busses

due to 4.16 KV breakers that were not being maintained in their

dynamically qualified position.

The issue is a violation of NRC requirements, which could

be considered for escalated'enforcement

and be subject to a civil penalty.

However, after

consultation with the Director, Office of Enforcement and the Regional Administrator,

I

have been authorized to exercise discretion to not issue a Notice of Violation and not

propose

a civil penalty in accordance with the provisions provided in Section VII.B.3 of the

NRC's Enforcement Policy. This decision was made after consideration that: (1) the

violation was identified by your staff's good questioning attitude during voluntary

initiatives; (2) corrective actions were comprehensive

and timely; (3) the conditions were

subtle in nature and not likely to be disclosed through routine surveillance or quality

assurance

activities; and (4) the violation is not reasonably linked to current performance.

9808ii0i0i 98073i

PDR

ADOCK 05000387

6

PDR

OFFICIAL RECORD

COPY

0

Robert G. Byram

2

The exercise of discretion acknowledges your good effort to identify and correct subtle

violations, that would not be identified by routine efforts, before the degraded safety

systems

are called upon.

In NRC Inspection Report 50-387,388/97-03,the

NRC dispositioned

LER 50-387/97-008

concerning your identification that Technical Specification Response

Time Testing

requirements were not being met.

In reviewing this matter, the NRC concluded that your

LER was insufficient in that it did not address the inadequate

10 CFR 50.59 safety

evaluation as a cause of not meeting the TS requirements

and therefore did not specify any

corrective actions proposed or taken for the inadequate safety evaluation.

While we are

not reopening any enforcement action pursuant to Section XIIIof the NRC's Enforcement

Policy, it is requested that you either supplement the LER or otherwise address

on the

docket your corrective actions taken or proposed for the failure of your 10 CFR 50.59

safety evaluation process.

You are required to respond to this letter and should followthe instructions specified in the

enclosed Notice when preparing your response.

The NRC will use your response,

in part,

to determine whether further enforcement action is necessary to ensure compliance with

regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of this letter,

its enclosure(s),

and your response will be placed in the NRC Public Document Room

(PDR).

Sincerely,

Original Signed by:

Charles W. Hehl, Director

Division of Reactor Projects

Docket Nos.: 50-387;50-388

License Nos:

NPF-14, NPF-22

Enclosures:

1

~ Notice of Violation

2. Inspection Report 50-387/98-03, 50-388/98-03

Robert G. Byram

cc w/encls:

R. F. Saunders, Vice President - Nuclear Operations

'.

T. Jones, Vice President - Engineering 5 Support

G. J. Kuczynski, General Manager

J

~ M, Kenny, Supervisor, Nuclear Licensing

G. D. Miller, General Manager - Nuclear Engineering

R. R. Wehry, Nuclear Licensing

F. P. Arcury, Nuclear Services Manager, General Electric

C. D. Lopes, Manager - Nuclear Security

A. M. Male, Manager, Nuclear Assessment

Services

H. D. Woodeshick, Special Assistant to the President

J. C. Tilton, III, Allegheny Electric Cooperative, Inc.

Commonwealth of Pennsylvania

Robert G. Byram

Distribution w/en

Distribution w/encls: (Via E-Mail)

B. McCabe, OEDO

R. Capra, PDI-2, NRR

V. Nerses, Project Manager, NRR

D. Brinkman, NRR

Inspection Program Branch, NRR (IPAS)

R. Correia, NRR

F. Talbot, NRR

M. Campion, ORA

DOCDESK

cls:

Region

I Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

PUBLIC

H. Miller, RA/W. Axelson, DRA

B.,Boger, ADPR, NRR

J. Goldberg, OGC

J. Lieberman, OE (OEIVIAIL)

D. Holody, ORA

C. Anderson, DRP

D. Florek, DRP

K. Jenison,

DRP

R. Junod, DRP

DOCUMENT NAME: G:iBRANCH4iSUSiSUS9803:INS

"See previous concurrence

To receive a copy of this document, indicate in the box: "C" = Copy without

attachment/enc

osure

"E" =

py with attachment/enclosure

"N" = No copy

OFFICE

R/

RI/0RA

OE

RI/

RP

DATE

NAME

K

i

n

f7/98

d

son

/I /98

DHolo

JLie'r

an

07/2Ã98

07/ /98

C

/98

)~ OFF(CIAL RECORD COPY

)'i

at)>PW

Robert G. Byram

cc w/encls:

R. F. Saunders, Vice President - Nuclear Operations

G. T. Jones, Vice President - Engineering & Support

G. J. Kuczynski, General Manager

J. M. Kenny, Supervisor, Nuclear Licensing

G. D. Miller, General Manager - Nuclear Engineering

R. R. Wehry, Nuclear Licensing

F. P. Arcury, Nuclear Services Manager, General Electric

C. D. Lopes, Manager - Nuclear Security

A. M. Male, Manager, Nuclear Assessment

Services

H. D. Woodeshick, Special Assistant to the President

J. C. Tilton, III, Allegheny Electric Cooperative, Inc.

Commonwealth of Pennsylvania

Distribution w/encis:

Region

I Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

PUBLIC

H. Miller, RA/W. Axelson, DRA

B. Boger, ADPR, NRR

J. Goldberg, OGC

J ~ Lieberman, OE (OEMAIL)

D. Holody, ORA

C. Anderson, DRP

D. Florek, DRP

K. Jenison,

DRP

R. Junod, DRP

Distribution w/encls: (Via E-Mail)

B. McCabe, OEDO

R. Capra, PDI-2, NRR

V. Nerses, Project Manager,

NRR

D. Brinkman, NRR

Inspection Program Branch, NRR (IPAS)

R. Correia, NRR

F. Talbot, NRR

M. Campion, ORA

DOCDESK

DOCUMENT NAME: G tBRANCH4iSUSiSUS9803. INS

To receive a copy of this document,

indicate in the box:

"C" = Copy without attachment/enclosure

"E" = Copy with attachment/enclosure

"N" = No

copy

OFFICE

RI/DRP

KJenison

07/

/98

RI/DRP

CAnderson

07/

/98

RI/DRP

CHeh1

07/

/98

OE

JLieberman

07/

/98

RI/ORA

DHo1ody

/

/98

WAx

son

/98

RI

HMi

/

/