Notice of Violation from Insp on 940926-1028.Violation Noted:Documented Instructions Not Appropriate to Circumstances for Resistance Temp Detector Mod Project on Unit 2
ML16342C734
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/16/1994
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML16342C733 List:
References
50-275-94-25, 50-323-94-25, NUDOCS 9411220012
Download: ML16342C734 (4)


Text

'(I APPENDIX A NOTICE OF VIOLATION Pacific Gas and Electric Company Diablo Canyon Nuclear Power Plant Unit 1

and 2

Oockets:

50-275 50-323 Licenses; DPR-80 DPR-82 During an NRC inspection conducted on September 26 through October 7, with in-office inspection through October 28,

1994, a violation of NRC requirements was identified.

In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions,"

10 CFR 2, Appendix C, the violation is listed below:

Criterion V of Appendix B to 10 CFR Part 50 requires, in part, that activities affecting quality shall be prescribed by documented instructions, procedures, or drawings of a type appropriate to the circumstances, and shall be accomplished in accordance with these documented instructions, procedures, or drawings.

Administrative Procedure OM7. ID1 requires the documentation of all identified hardware-related or administrative problems relative to nuclear power generation activities, through the initiation of an action request, so that the cause of the problems can be identified and actions developed to ensure the problems do not happen again or to reduce the chance of the problems recurring.

Contrary to the above:

A.

Documented instructions were not appropriate to the circumstances for the resistance temperature detector modification project on Unit 2, in that they did not provide adequate measures for controlling or containing reactor coolant system water that spilled out of the Loop 1

hot leg during machining operations on October 5, 1994, during Refueling Outage 2R6.

(A similar event occurred in Unit 1 during Refueling Outage 1R6).-

B.

An action request to'ocument a problem was not initiated during Refueling Outage 1R6 (between March 12 and May 7, 1994) to identify the cause of a reactor coolant system water spill during the resistance temperature detector modification project on Unit 1, and to develop actions to ensure the that problem did not recur.

This is a Severity Level IV violation (Supplement

1) (275;323/9425-01)

Pursuant to the provisions of 10 CFR 2.201, Pacific Gas and Electric Company is hereby required to submit a written statement or explanation to the U.S.

Nuclear Regulatory Commission, ATTN:

Document Control

Desk, Washington, D.C.

20555 with a copy to the Regional Administrator, Region IV, 611 Ryan Plaza Drive, Suite 400, Arlington, Texas

76011, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice).

94ii220012 94iii6' PDR ADOCK 05000275 8

PDR

This reply should be clearly marked as a "Reply to a Notice of Violation" and should include for each violation:

(I) the reason for the violation, or, if

, contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results

achieved, (3) the corrective steps that wi 11 be taken to avoid further violations, and (4) the date when full compliance will be achieved.

If an adequate reply is not received within the time specified in this Notice, an order or a Demand for Information may be issued to show cause why the license should not be modified, suspended, or

revoked, or why such other action as may be proper should not be taken.

Where good cause is shown, consideration will be given to extending the response time.

Dated at Arlington, Texas this /g '-~ day, of/i.:3i994

0