'NOTICE OF VIOLATION Pacific Gas 8 Electric Company Diablo Canyon Unit 2 Docket No.
50-323 License No.
DPR-82 During an NRC inspection conducted from January 31 through February 10, '1994, a violation of NRC requirements was identified.
In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions,"
10 CFR Part 2, Appendix C, the violation is '1isted below:
Diablo Canyon Technical Specifications, Section 6.8.)(h), requires that written procedures be established, implemented, and maintained covering Fire Protection Program implementation.
Diablo Canyon Inter-Departmental Administrative Procedure OM8. ID1, "Fire Loss Prevention,"
Section 4.2.2 of Attachment 7.3, states:
The designation "NO STORAGE AREA" is referred to in the DCPP Fire Protection Plan.
It is included in the design basis of the plant as approved by the NRC.
The storage of combustible materials in the following areas is prohibited to assure compliance with the Fire Protection License condition:
l.
Area west of Battery Rooms ll and 21 on 115'l. of the Auxiliary Building.
Contrary to the above, on January 27,
- 1994, a transient combustible permit was issued by the licensee to store 749, 100 BTU of combustible materials in the Unit 2 115-foot elevation west of Battery Room 21 in the Auxiliary Building, and combustible materials were stored in the posted "No Storage" area on February 9,
1994.
This is a Severity Level IV violation (Supplement I), applicable to Unit 2.
Pursuant to the provisions of 10 CFR 2.201, Pacific Gas and Electric company is hereby required to submit a written statement or explanation to the U.S.
Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington D.C.
20555, with a copy to the Regional Administrator, Region V, and a copy to the NRC Resident Inspector, Diablo Canyon Power Plant, within 30 days of the date of the letter transmitting this Notice of Violation (Notice).'his reply should be clearly marked as a "Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results
- achieved, (3) the corrective steps that will be taken to avoid further violations, and
- 4) the date when full 9403310008 940315 PDR ADOCK ORN0275; 9
PM $<
0
compliance will be achieved.
If an adequate reply is not received within the time specified in this Notice, an Order or a Demand for Information may be issued to show cause why the license should not be modified, suspended, or
- revoked, or why such other action as may be proper should not be taken.
Where good cause is shown, consideration will be given to extending the response time.