November 22, 1997
SUBJECT:
NRC.INSPECTION REPORT 50-275/97-18; 50-323/97-18
Dear Mr. Rueger:
e An NRC inspection was conducted October 6-10, 1997, at your Diablo Canyon Nuclear Power Plant, Units 1 and 2 reactor facilities. The enclosed report presents the scope and results of that inspection.,
~
~
Our inspection verified that your liquid and gaseous radioactive waste effluent management program was properly implemented.
In accordance with 10 CFR 2.790 of the NRC's",Rules of Practice," a copy of this inspection report will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, Blaine Murray, Chief Plant Support Branch Division of Reactor Safety Docket Nos.:
50-275; 50-323 License Nos.:
NRC Inspection Report 50-275/97-1 8; 50-323/97-1 8
'P7ii050054 97i03i PDR ADQCK 05000275
PDR lllllllllllllllllllllllllflllllllllll
Pacific Gas and Electric Company-2-cc w/enclosures:
Dr. Richard Ferguson Energy Chair Sierra Club California 1100 lith Street, Suite 311 Sacramento, California 95814 Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, California 93448 Chairman San Luis Obisp'o County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Mr. Truman Burns>Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, California 94102 Robert R. Wellington, Esq.
Legal Counsel Diablo Canyon Independent Safety Committee 857 Cass Street, Suite D Monterey, California 93940 Mr. Steve Hsu Radiologic Health Branch State Department. of Health Services P.O. Box 942732 Sacramento, California 94234 Christopher J. Warner, Esq.
Pacific Gas and Electric Company P.O. Box 7442 San Francisco, California 94120
Pacific Gas and Electric Company Robert P. Powers, Vice President and Plant Manager Diablo Canyon Power Plant P.O. Box 56 Avila Beach, California 93424 Managing Editor Telegram-Tribune 1321 Johnson Avenue P.O. Box 112 San Luis Obispo, California 93406
Pacific Gas and Electric Company-4-E-Mail report to T. Frye (TJF)
E-Mail report to T. Hiltz (TGH)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bcc to DCD (IE06)
bcc distrib. by RIV:
Regional Administrator DRP Director DRS Director Branch Chief (DRP/E, WCFO)
Senior Project inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
WCFO File Resident Inspector DRS-PSB DRS Deputy Director MIS System RIV File M. Hammond (PAO, WCFO)
DOCUMENT NAME: GAREPORTS>DC718RP.JBN To receive copy of document, Indicate in box: "C" = Copy witho enclosures
"F'
Copy with enclosures "N" -" No copy RIV'SRS:P B
E C:PSB E
C:DRP/E JBNicholas
/go/97 BMurray
/
/97 HWong
/97 OFFICIAL RECORD COPY
Pacific Gas and Electric Company
.4-E-Mail report to T. Frye (TJF)
E-Mail report to T. Hiltz (TGH)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bcc to DCD (IE06)
bcc distrib. by RIV:
Regional Administrator DRP Director DRS Director Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
WCFO File Resident Inspector DRS-PSB DRS Deputy Director MIS System RIV File M. Hammond (PAO, WCFO)
DOCUMENT NAME: G:>REPORTS>DC718RP.JBN To receive copy of document, Indicate In box: "C" ~ Copy withe enciosures
"E'
Copy viith enciosures "N"-"No copy RIV:SRS:P B
E C:PSB E
C:DRP/E JBNicholas
/go/97 BMurray
/
/97 HWong
/97 OFFICIAL RECORD COP