NOTICE OF VIOLATION Pacific Gas and Electric Company Diablo Canyon Units 1
& 2 Docket Nor. 50-275 and 50-323 License Nos.
DPR-80 and DPR-82 During an NRC inspection conducted on April 21 through June 1,
- 1992, one violation of NRC requirements was identified.
In accordance with the "General Statement of Policy and Procedure for gRC Enforcement Actions," 10 CFR Part 2, Appendix C, the violation is identified below:
Diablo Canyon Technical Specification 6.8. 1 states, in part, that written procedures shall be established, implemented and maintaiged covering the applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2, dated February 1978.
Appendix A of Regulatory Guide 1.33, Revision 2, February
- 1978, recom-mends the establishment of procedures for. the control of radioactivity, including procedures covering handling of spent resins and filter sludge.
Work Order C0100168, issued for the disassembly and reassembly of a shipping cask containing radioactive resin waste, listed Haintenance Procedure M-50.23, "Loading Pre-loaded Liners Into The NUPAC 10-142 RADWASTE Shipping Cask," for precautions and as a reference for the Work Order.
Naintenance Procedure N-50.23 listed Administrative Procedure C-702, "Rigging and Load Handling," as a prerequisite for tagging and inspecting all hoisting equipment.
Paragraph 4.3.1 of Administrative Procedure C-702, Revision 7, states that "Rigging equipment shall not be loaded beyond its Safe Working Load, as certified by the manufacturer or T.E.S.,
except for load test purposes."
Contrary to the above, on Hay 28, 1992, licensee personnel incorrectly used two one-ton chainfalls for load leveling while lifting the 10-142 cask primary and secondary lids, with each chainfall loaded to approxi-mately 2400 pounds.
This is a Severity Level IV Violation (Supplement 3)
Pursuant to the provisions of 10 CFR 2.201, Pacific Gas and Electric Company is hereby required to submit a written statement or explanation to the U.S.
Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, D.C.
20555, with a copy to the Regional Administrator, Region V, and a copy to the NRC Resident Inspector at the Diablo Canyon Power Plant, within 30 days of the date of this letter transmitting this Notice of Violation (Notice).
This reply should be clearly marked as a "Reply to a Notice of Violation" and should include:
(1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results
- achieved, (3) the corrective steps that will be taken to avoid future violations, and (4) the date when full compliance will be achieved. 'If an adequate reply is not received within the time specified in this Notice, the commission may issue an order or a demand for information as to why the 9207270291 920707 PDR ADQCK 05000275 8
l I
~
~
~
~
~
~
~
~
~
license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken.
Where good cause is shown, consideration will be given to extending the response time.