ENCLOSURE 1
NOTICE OF VIOLATION Pacific Gas and Electric Company Diablo Canyon Nuclear Power Plant Docket Nos.:
50-275 50-323 License Nos.:
DPR-80 DPR-82 During an NRC inspection conducted on May 28 through June 28.
- 1996, one violation of NRC requi rements was identified.
In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," NUREG-1600, the violation is listed below:
Technical Specification 6.8. 1.h requires that written procedures be established, implemented.
and maintained to implement the Fire Protection Program.
Licensee Procedure OM8. ID4. "Control of Combustible Materials,"
Revision 3. dated December 21.
- 1995, paragraph 5.8. 1 required that all combustible materials stored in the auxiliary building, and not in a designated storage
- area, receive a transient combustible permit.
Contrary to the above.
on June 6,
1996 'he inspectors identified approximately 300 feet of 3-inch diameter rubber hose stored in the containment penetration area of Unit 2.
Specifically, the hose was found at the 100-foot elevation in the auxiliary building with no transient combustible permit.
This is a Severity Level IV violation (Supplement l)(323/96013-01)
Pursuant to the provisions of 10 CFR 2.201, Pacific Gas and Electr ic Company is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN:
Document Control
- Desk, Washington, D.C.
20555 with a copy to the Regional Administrator, Region IV ~
611 Ryan Plaza Drive, Suite 400, Arlington, Texas
- 76011, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice. within 30 days of the date of the letter transmitting this Notice of Violation (Notice).
This reply should be clearly marked as a "Reply to a Notice of Violation" and should include for each violation:
(1) the reason for the violation, or, if contested.
tHe basis for disputing the violation, (2) the corrective steps that have been taken and the results
- achieved, (3) the corrective steps that will be taken to avoid further violations.
and (4) the date when full compliance will be achieved.
Your response may reference or include previous docketed correspondence, if the correspondence adequately addresses the required response.
If an adequate reply is not received within the time specified in this Notice, an order or a
Demand for Information may be issued as to why the license should not be modified, suspended'r
- revoked, or why such other action as may be proper should not be taken.
Where good cause is shown, consideration will be given to extending the response time.
9608210027 9608ih PDR ADOCK 0S00027S 6
Because your response will be placed in the NRC Public Document Room (POR), to the extent possible. it should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction.
However, if you find it necessary to include such information, you should clearly indicate the specific information that you desire not to be placed in the PDR.
and provide the legal basis to support your request for withholding the information from the public.
Dated at Arlington, Texas this mf"day of ~~6-1996