Summary of Telephone Conference Call Held on September 30, 2014, Between the U.S. NRC and Nextera Energy Seabrook, LLC
ML14301A304
Person / Time
Site: Seabrook 
Issue date: 11/17/2014
From: Richard Plasse
License Renewal Projects Branch 1
To:
NextEra Energy Seabrook
Mitchell J, 301-415-3019
References
TAC ME4028
Download: ML14301A304 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 17, 2014 LICENSEE:

NextEra Energy Seabrook, LLC FACILITY:

Seabrook Station, Unit 1

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON SEPTEMBER 30, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND NEXTERA ENERGY SEABROOK, LLC. CONCERNING THE SEABROOK STATION LICENSE RENEWAL APPLICATION (TAC NO.

ME4028)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of NextEra Energy Seabrook, LLC (NextEra or the applicant), held a telephone conference call on September 30, 2014, to discuss and clarify the applicants responses to staff requests for additional information (RAIs), which were submitted by the applicant dated April 14, 2011, August 11, 2011 and June 24, 2014. Specifically, the applicant confirmed that inspections of the containment liner plate in April 2011, were performed in accordance with the augmented examination requirements of IWE 1241(a), and prior to a subsequent review that determined that the areas were incorrectly designated for augmented examination. Additionally, the applicant clarified the response to RAI B.2.1.31A-3 dated May 15, 2014, regarding the transition from Tier 2 - qualitative monitoring of cracks less than.05mm to Tier 2 - quantitative monitoring if the cracks are found to exceed.05mm. As part of this discussion, the applicant agreed to provide further clarification in a supplement to its RAI B.2.1.31A-3 response dated May 15, 2014.

The applicant had an opportunity to comment on this summary.

/RA/

Richard Plasse, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-443

Enclosure:

List of Participants cc w/encl: Listserv

ML14301A304

  • Concurred via e-mail OFFICE LA:DLR:RPB1* PM:DLR:RPB1 BC:DLR:RPB1 PM:DLR:RPB1 NAME YEdmonds RPlasse YDiaz-Sanabria RPlasse DATE 11/12/14 11/13/14 11/13/14 11/17/14

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON SEPTEMBER 30, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND NEXTERA ENERGY SEABROOK, LLC. CONCERNING THE SEABROOK STATION LICENSE RENEWAL APPLICATION (TAC NO. ME4028)

DISTRIBUTION EMAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsOgcMailCenter RidsNrrPMSeabrook Resource Jeffrey.Mitchell2@nrc.gov Lois.James@nrc.gov Richard.Plasse@nrc.gov Brian.Wittick@nrc.gov Yoira.Diaz-Sanabria@nrc.gov John.Lamb@nrc.gov David.McIntyre@nrc.gov Eugene.Dacus@nrc.gov Brian.Harris@nrc.gov Glenn.Dental@nrc.gov Paul.Cataldo@nrc.gov Chris.Newport@nrc.gov Jasmine.Gilliam@nrc.gov Nancy.McNamara@nrc.gov Doug.Tiff@nrc.gov Neil.Sheehan@nrc.gov Diane.Screnci@nrc.gov

ENCLOSURE TELEPHONE CONFERENCE CALL SEABROOK STATION, UNIT 1 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS September 30, 2014 PARTICIPANTS AFFILIATIONS Jeffrey Mitchell U.S. Nuclear Regulatory Commission (NRC)

Rick Plasse NRC Alice Erickson NRC Angela Buford NRC Edward Carley Seabrook Engineering Supervisor - License Renewal Brian Brown Seabrook Engineering Supervisor - Civil/Structural Robert Parry Seabrook Engineering Program Manager Scott Hamel Seabrook Principal Engineering Analyst UT Level III Paul Willouby Seabrook Principal Engineer-Licensing Glen Alexander Seabrook Engineering Supervisor-Fleet Programs Donna Silvon Seabrook Principal Engineering Analyst - UT Jaclyn Hulbert Seabrook Engineer - License Renewal Civil/Structural Lead