UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 4, 2012 Mr. Larry Meyer Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241
SUBJECT:
MID-CYCLE ASSESSMENT LETTER - POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2
Dear Mr. Meyer:
On August 8, 2012, the NRC completed its mid-cycle performance review of Point Beach Nuclear Plant, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011, through June 30, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The assessment reflects the integration of the Security Cornerstone into Inspection Manual Chapter 0305, Operating Reactor Assessment Program.
The NRC determined the performance at Point Beach Nuclear Plant, Units 1 and 2, during the most recent quarter was within the Regulatory Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix, because of one inspection finding in the Emergency Preparedness Cornerstone being classified as having low to moderate safety significance (White) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). The White finding, effective the second quarter of 2012, involved a failure to develop and have in place guidelines for the choice of protective actions during an emergency that were consistent with Federal guidance.
Once the NRC is notified of your readiness for it to conduct a supplemental inspection to review the actions taken to address the performance issues, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area. This inspection is conducted to provide assurance that the root causes and contributing causes of risk-significant performance issues are understood, the extent of condition and extent of cause of risk-significant performance issues are identified, and the corrective actions are sufficient to prevent recurrence.
The NRC also plans to conduct non-routine inspections and temporary instructions at your facility, including: Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal; IP 71111.05, Fire Protection; IP 71152, Problem Identification and Resolution; Temporary Instruction (TI) 2515/182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks (Phase 2); TI 2515/187, Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns; and TI 2515/188, Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns.
The enclosed inspection plan lists the inspections scheduled through December 31, 2013.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (630) 829-9601 with any questions you have regarding this letter.
Sincerely,
/RA by Kenneth OBrien, Acting for/
Gary L. Shear, Acting Division Director Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27
Enclosure:
Inspection Plan cc w/encl: Distribution via ListServ
The enclosed inspection plan lists the inspections scheduled through December 31, 2013.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (630) 829-9601 with any questions you have regarding this letter.
Sincerely,
/RA by Kenneth OBrien, Acting for/
Gary L. Shear, Acting Division Director Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27
Enclosure:
Inspection Plan cc w/encl: Distribution via ListServ DISTRIBUTION:
See next page DOCUMENT NAME: PTBH MOC 2012 Letter.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII E
RIII RIII RIII NAME MKunowski:rj KOBrien for GShear DATE 08/24 /12 08/27/12 OFFICIAL RECORD COPY
Letter to L. Meyer from G. Shear dated September 4, 2012
SUBJECT:
MID-CYCLE ASSESSMENT LETTER - POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 DISTRIBUTION:
Silas Kennedy RidsNrrDorlLpl3-1 Resource RidsNrrPMPointBeach RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov
Page 1 of 2 Planned Dates Start End Inspection Activity Title No. of Staff on Site Point Beach Inspection / Activity Plan 09/01/2012 - 12/31/2013 INSP
- POWER UPRATE INSPECTION 3
IP Power Uprate 71004 01/01/2012 09/30/2012 TI-187
- TI-187 FLOODING WALKDOWN 2
IP Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns 2515/187 07/01/2012 12/30/2012 TI-188
- TI-188 SEISMIC WALKDOWN 2
IP Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns 2515/187 07/02/2012 12/31/2012 BI OLRQ
- REQUALIFICATION PROGRAM INSPECTION 1
IP Licensed Operator Requalification Program - Annual Review 7111111A 09/24/2012 09/28/2012 BI ISI
- INSERVICE INSPECTION - UNIT 2 1
IP Inservice Inspection Activities - PWR 7111108P 11/01/2012 12/05/2012 RENEWAL
- LICENSE RENEWAL INSPECTION 71003 PHASE 1 2
IP Post-Approval Site Inspection for License Renewal 71003 11/01/2012 12/05/2012 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/05/2012 11/09/2012 IP Occupational Dose Assessment 71124.04 11/05/2012 11/09/2012 OL PREP
- POINT BEACH INIT PREP - 11/2012 3
OL - INITIAL EXAM - 2012 DEC - POIN W90268 11/05/2012 11/09/2012 STRIKE
- STRIKE CONTINGENCY - SECURITY 2
IP Licensee Strike Contingency Plans 92709 12/01/2012 12/31/2012 BI HS
- TRIENNIAL HEAT SINK INSPECTION 2
IP Heat Sink Performance 7111107T 11/26/2012 11/30/2012 OL EXAM
- POINT BEACH INIT EXAM - 12/2012 3
OL - INITIAL EXAM - 2012 DEC - POIN W90268 12/03/2012 12/14/2012 LIC RENW
- LICENSE RENEWAL INSPECTION 71003 PHASE 2 3
IP Post-Approval Site Inspection for License Renewal 71003 01/22/2013 02/08/2013 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 02/11/2013 02/15/2013 IP Reactor Coolant System Activity 71151-BI01 02/11/2013 02/15/2013 IP Occupational Exposure Control Effectiveness 71151-OR01 02/11/2013 02/15/2013 IP RETS/ODCM Radiological Effluent 71151-PR01 02/11/2013 02/15/2013 ISI BI
- ISI INSPECTION 2
IP Inservice Inspection Activities - PWR 7111108P 03/18/2013 04/05/2013
Page 2 of 2 Planned Dates Start End Inspection Activity Title No. of Staff on Site Point Beach Inspection / Activity Plan 09/01/2012 - 12/31/2013 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/08/2013 04/12/2013 IP Occupational ALARA Planning and Controls 71124.02 04/08/2013 04/12/2013 BI EPR
- EP ROUTINE INSPECTION / PI VERIFICATION 2
IP Alert and Notification System Testing 7111402 04/29/2013 05/03/2013 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 04/29/2013 05/03/2013 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 04/29/2013 05/03/2013 IP Performance Indicator Verification 71151 04/29/2013 05/03/2013 TI 182
- TI 182 BURIED PIPE PHASE 2 2
IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 06/17/2013 06/21/2013 BI PI&R
- BIENNIAL PROBLEM IDENTIFICATION AND RES 4
IP Problem Identification and Resolution 71152B 07/15/2013 08/02/2013 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Radiological Hazard Assessment and Exposure Controls 71124.01 07/15/2013 07/19/2013 IP Radiological Environmental Monitoring Program 71124.07 07/15/2013 07/19/2013 BI OLRQ
- BIENNIAL REQUAL PROGRAM INSPECTION 2
IP Licensed Operator Requalification Program 7111111B 07/22/2013 07/26/2013 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 08/19/2013 08/23/2013 BI FIRE
- FIRE PROTECTION INSPECTION & BAG TRIP 3
IP Fire Protection [Triennial]
7111105T 10/14/2013 11/15/2013 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/21/2013 10/25/2013 IP Occupational ALARA Planning and Controls 71124.02 10/21/2013 10/25/2013 OL PREP
- POINT BEACH INIT PREP - 10/2013 3
OL - INITIAL EXAM - 2013 OCT-NOV - POINT BEACH W90291 10/28/2013 11/01/2013 OL EXAM
- POINT BEACH INIT EXAM - 11/2013 3
OL - INITIAL EXAM - 2013 OCT-NOV - POINT BEACH W90291 11/18/2013 11/29/2013