Ltr. 04/04/19 Point Beach Nuclear Plant, Units 1 and 2 - Request for Information for an NRC Design Bases Assurance Inspection (Program): Implementation of the EQ Program; Inspection Report 05000266/2019013 and 05000301/2019013 (DRS-B.Jose)
ML19094B118
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/04/2019
From: Benny Jose
NRC/RGN-III/DRS/EB2
To: Craven R
Point Beach
References
IR 2019013
Download: ML19094B118 (6)


See also: IR 05000266/2019013

Text

April 4, 2019

Mr. Robert Craven

Site Director

NextEra Energy Point Beach, LLC

6610 Nuclear Road

Two Rivers, WI 54241-9516

SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2REQUEST FOR

INFORMATION FOR AN NRC DESIGN BASES ASSURANCE INSPECTION

(PROGRAM): IMPLEMENTATION OF THE ENVIRONMENTAL QUALIFICATION

PROGRAM; INSPECTION REPORT 05000266/2019013 AND 05000301/2019013

Dear Mr. Craven:

On June 24, 2019, the U. S. Nuclear Regulatory Commission (NRC) will begin a triennial

baseline Design Bases Assurance Inspection (Programs) at Point Beach Nuclear Plant.

This inspection will be performed in accordance with NRC Baseline Inspection

Procedure 71111.21N, Attachment 1.

The Design Bases Assurance Inspection will focus on the implementation of the Electrical

Equipment Environmental Qualification (EQ) Program to verify you are maintaining the qualified

status of equipment during the life of the plant. The EQ components to be reviewed during this

baseline inspection will be identified during the inoffice preparation week that occurs prior to the

onsite inspection week.

The inspection will include two weeks of onsite inspection. The inspection team will consist of

three NRC inspectors. The current inspection schedule is as follows:

Preparation week: June 17-21, 2019;

Onsite inspection weeks: June 24-28, 2019, and July 8-12, 2019.

Experience with previous baseline design inspections of similar depth and length has shown

that this type of inspection is extremely resource intensive, both for the NRC inspectors and the

licensee staff. In order to minimize the inspection impact on the site and to ensure a productive

inspection for both parties, we have enclosed a request for information needed for the

inspection.

It is important that all of these documents are up-to-date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection. Insofar as possible, this information should be provided electronically to the lead

inspector. The information request has been divided into three groups:

R. Craven

-2-

The first group lists information necessary for our initial inspection scoping activities.

This information should be provided to the lead inspector no later than May 20, 2019.

By May 31, 2019, the lead inspector will communicate the initial selected set of

approximately 12 EQ components.

The second group of documents requested is those items needed to support our

in-office preparation activities for the selected set of 9-12 EQ components. This set of

documents should be provided to the lead inspector at the Regional Office no later than

June 10, 2019. During the in-office preparation activities, the team may identify

additional information needed to support the inspection.

The last group includes the additional information above as well as plant specific

reference material. This information should be available to the team onsite on

June 24, 2019. It is also requested that corrective action documents and/or questions

developed during the inspection be provided to the lead inspector as the documents are

generated.

The lead inspector for this inspection is Mr. Benny Jose. We understand that our licensing

contact for this inspection is Ms. Kim Locke of your organization. If there are any questions

about the inspection or the material requested in the enclosure, please contact the lead

inspector at 630-829-9756 or via e-mail at Benny.Jose@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with Title 10 Code of Federal Regulations, Part 2.390, Public Inspections,

Exemptions, Requests for Withholding.

Sincerely,

/RA/

Benny Jose, Senior Reactor Engineer

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-266, 50-301

License Nos. DPR-24; DPR-27

Enclosure:

Document Request for Design Bases

Assurance Inspection EQ Program

cc: Distribution via LISTSERV

R. Craven

-3-

Letter to Robert Craven from Benny Jose Last dated April 4, 2019.

SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2REQUEST FOR

INFORMATION FOR AN NRC DESIGN BASES ASSURANCE INSPECTION

(PROGRAM): IMPLEMENTATION OF THE ENVIRONMENTAL QUALIFICATION

PROGRAM; INSPECTION REPORT 05000266/2019013 AND 05000301/2019013

DISTRIBUTION:

Michael McCoppin

RidsNrrDorlLpl3

RidsNrrPMPointBeach

RidsNrrDirsIrib Resource

Darrell Roberts

John Giessner

Jamnes Cameron

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number: ML19094B118

OFFICE

RIII

NAME

BJose:cl

DATE

04/04/19

OFFICIAL RECORD COPY

DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION EQ PROGRAM

Enclosure

Inspection Report: 05000266/2019013; 05000301/2019013

Inspection Dates:

June 24-28, 2019, and July 8-12, 2019

Inspection Procedure:

71111.21N, Design Bases Assurance Inspection (Program),

Attachment 1, Environmental Qualification (EQ) under

10 CFR 50.49 Programs, Processes, and Procedures

Lead Inspector:

Benny Jose

630-829-9756

Benny.Jose@nrc.gov

I.

Information Requested for Initial Inspection Scoping Activities

The following information is requested by May 20, 2019, or sooner, to facilitate

inspection preparation. If you have any questions regarding this information, please call

the team leader as soon as possible. (Please provide the information electronically in

pdf files, Excel, or other searchable formats, preferably on some portable electronic

media (e.g., CD-ROM, DVD, etc.). The portable electronic media should contain

descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information

in lists should contain enough information to be easily understood by someone who

has knowledge of light water reactor technology).

1. Risk-ranking of top 50 to 75 components required to meet Environmental

Qualifications (EQ) from your site-specific probabilistic safety analysis sorted by

Fussell Vesely Importance. Please list the component ID, Description and its

installed location (e.g., Turbine Bldg., Aux. Bldg., Containment etc.)

2. U.S. Nuclear Regulatory Commission Safety Evaluation Report(s) associated with

EQ.

3. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications,

and Technical Specifications Bases. Specifically identify which Updated Final Safety

Analysis Report sections address EQ (including seismic).

4. Identify the various EQ standards (including year, edition, or revision) that the station

is committed to.

5. Site (and corporate if applicable) procedures associated with the Title 10 of the Code

of Federal Regulations, Part 50.49, EQ Program for electrical components. Include

procedures for procurement of qualified equipment, maintenance of qualified

equipment, modification to qualified equipment (including Equivalency or Commercial

Grade Dedication (CGD) Programs), and material storage and shelf life controls.

6. Copy of EQ Design Basis Document, if applicable.

7. Copy of any open licensing commitments related to EQ, if applicable.

DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION EQ PROGRAM

2

8. Equipment Qualification Master List. Specific issues to be identified include: safety

classification (safety-related or nonsafety-related), Regulatory Guide 1.97

instrumentation, EQ (e.g., DOR, NUREG 588, 50.49), original or replaced after

implementation of 50.49, and plant location.

9. List of any installed equipment removed from the Equipment Qualification Master List

and basis for removal.

10. List of EQ solenoid valves that are normally continuously energized.

11. For units that have entered the period of extended operation if EQ files were

reviewed for aging management effects of license renewal, identify which EQ files

were modified/changed to incorporate appropriate actions for the period of extended

operation. Copies of any EQ Aging Management Programs.

12. List or drawings of plant areas that are subjected to EQ, identifying design (limiting)

temperature, both normal and accident, high energy line break, radiation levels, etc.

that the associated equipment will have to be qualified to meet EQ. If unit has

obtained a power uprate (greater than 5 percent) provide same information

pre-update (earliest available if multiple uprates).

13. List of CGD evaluations performed, for which the dedicated parts have been issued

for installation (parts issued for the last 10 years) on EQ applications in the plant.

Include CGD evaluation number, name of part, component ID or description of the

component the part was issued to repair, work order, and date issued or installed.

14. List of Corrective Action Documents related to the EQ Program or EQ of specific

components for the last 3 years.

15. Current management and engineering organizational chart.

II.

Information Requested (for the approximate 9-12 selected components) to be

Available by June 10, 2019

1. EQ summary report for each component/subcomponent.

2. Qualification Maintenance Requirement Sheet or equivalent.

3. List of corrective action documents associated with each of the selected components

for the last 3 years.

4. Photos of any component in containment or high radiation areas, if available.

5. EQ file, including associated Qualification Test Reports.

6. Vendor manual (electronic copy or availability of hard copy during inspection).

7. Preventive maintenance template.

8. Last performed work order (WO) for each associated EQ preventive maintenance.

DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION EQ PROGRAM

3

9. List of corrective maintenance WOs for the last 5 years. Include WO number, date

performed, and brief one line description.

10. If repair work (e.g., a motor rewind) was performed under a purchase order, provide

copy of the purchase order.

11. Thermal life calculation.

12. Any self-assessments of the EQ Program in the last 3 years.

This information should be separated for each selected component, especially if

provided electronically (e.g., folder with component name that includes EQ files,

Qualification Test Reports, calculations, corrective action documents, maintenance

history, etc.).

III.

Additional Information to be Provided on June 24, 2019, Onsite

1. During the in-office preparation activities, the team may identify additional

information needed to support the inspection. The lead inspector will provide

a list of the additional information needed during the week of June 17, 2019.

V.

Information Requested to be Provided Throughout the Inspection

1. Copies of any corrective action documents generated as a result of the teams

questions or queries during this inspection.

2. Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily by 2:00 p.m.

during the inspection to each team member).

If you have questions regarding the information requested, please contact the lead inspector.