ML19037A310

From kanterella
Jump to navigation Jump to search
Ltr. 02/05/19 Point Beach Nuclear Plant, Units 1 and 2 - Information Request for the Cyber-Security Full Implementation Inspection, Notification to Perform Inspection; Inspection Report 05000266/2019412; 05000301/2019412 (DRS-G.Hausman)
ML19037A310
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/05/2019
From: Hausman G
Engineering Branch 3
To: Craven R
Point Beach
References
IR 2019412
Download: ML19037A310 (8)


See also: IR 05000266/2019412

Text

February 5, 2019

Mr. Robert Craven

Site Director

NextEra Energy Point Beach, LLC

6610 Nuclear Road

Two Rivers, WI 54241-9516

SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2INFORMATION

REQUEST FOR THE CYBER-SECURITY FULL IMPLEMENTATION

INSPECTION, NOTIFICATION TO PERFORM INSPECTION; INSPECTION

REPORT 05000266/2019412; 05000301/2019412

Dear Mr. Craven:

On June 3, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin an inspection in

accordance with Inspection Procedure 71130.10P Cyber-Security, issued May 15, 2017, at

your Prairie Island Nuclear Generating Plant, Units 1 and 2. The inspection will be performed

to evaluate and verify your ability to meet full implementation requirements of the NRCs

Cyber-Security Rule, Title 10 of the Code of Federal Regulations, Part 73, Section 54,

Protection of Digital Computer and Communication Systems and Networks. The onsite

portion of the inspection will take place during the weeks of June 3, 2019, and June 17, 2019.

Experience has shown that these inspections are extremely resource intensive, both for the

NRC inspectors and the licensee staff. In order to minimize the inspection impact on the

site and to ensure a productive inspection for both parties, we have enclosed a request for

documents needed for the inspection. These documents have been divided into four groups.

  • The first group specifies information necessary to assist the inspection team in choosing

the focus areas (i.e., sample set) to be inspected by the Cyber-Security Inspection

Procedure. This information should be made available via compact disc and delivered

to the regional office no later than April 3, 2019. The inspection team will review this

information and, by April 17, 2019, will request the specific items that should be provided

for review.

  • The second group of additional requested documents will assist the inspection team in

the evaluation of the critical systems and critical digital assets, defensive architecture,

and the areas of your plants Cyber-Security Program selected for the Cyber-Security

Inspection. This information will be requested for review in the regional office prior to the

inspection by May 5, 2019.

  • The third group of requested documents consists of those items that the inspection team

will review, or need access to, during the inspection. Please have this information

available by the first day of the onsite inspection, June 3, 2019.

R. Craven -2-

  • The fourth group of information is necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to

the lead inspector as the information is generated during the inspection. It is important

that all of these documents are up to date and complete in order to minimize the number

of additional documents requested during the preparation and/or the onsite portions of

the inspection.

The lead inspector for this inspection is Mr. George M. Hausman. We understand that our

regulatory contact for this inspection is Mr. Tom Schneider of your organization. If there are any

questions about the inspection or the material requested, please contact the lead inspector at

630-829-9743 or via e-mail at George.Hausman@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA Jasmine Gilliam Acting for/

George M. Hausman, Senior Reactor Inspector

Engineering Branch 3

Division of Reactor Safety

Docket Nos. 50-266; 50-301

License Nos. DPR-24; DPR-27

Enclosure:

Document Request for Cyber-Security

Inspection

cc: Distribution via LISTSERV

R. Craven -3-

Letter to Robert Craven from George M. Hausman dated February 5, 2019.

SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2INFORMATION

REQUEST FOR THE CYBER-SECURITY FULL IMPLEMENTATION

INSPECTION, NOTIFICATION TO PERFORM INSPECTION; INSPECTION

REPORT 05000266/2019412; 05000301/2019412

DISTRIBUTION:

Michael McCoppin

RidsNrrDorlLpl3

RidsNrrPMPointBeach

RidsNrrDirsIrib Resource

Darrell Roberts

John Giessner

Jamnes Cameron

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number: ML19037A310

OFFICE RIII

NAME JGilliam for

GHausman:cl

DATE 02/05/19

OFFICIAL RECORD COPY

DOCUMENT REQUEST FOR CYBER-SECURITY INSPECTION

Inspection Report: 05000266/2019412; 05000301/2019412

Inspection Dates: Weeks of June 3, 2019, and June 17, 2019

Inspection Procedure: Inspection Procedure 71130.10P, Cyber-Security, Issue Date

May 15, 2017

Reference: Guidance Document for Development of the Request for

Information and Notification Letter for Full-Implementation of

the Cyber-Security Inspection, Issue Date October 26, 2017

(ML17156A215)

NRC Inspectors: George M. Hausman, Lead Jasmine A. Gilliam

630-829-9743 630-829-9831

George.Hausman@nrc.gov Jasmine.Gilliam@nrc.gov

NRC Contractors: Alan B. Konkal Chris Fiotes

561-989-0210 301-415-7000

Alan.Konkal@nrc.gov Chris.Fiotes@nrc.gov

Observers: Robert C. Daley

630-829-9749

Robert.Daley@nrc.gov

I. Information Requested for In-Office Preparation

The initial request for information (i.e., first Request for Information (RFI)) concentrates

on providing the inspection team with the general information necessary to select

appropriate components and Cyber-Security Program (CSP) elements to develop a

site-specific inspection plan. The first RFI is used to identify the list of critical systems

and critical digital assets (CSs/CDAs) plus operational and management security control

portions of the CSP to be chosen as the sample set required to be inspected by the

Cyber-Security Inspection Procedure. The first RFIs requested information is specified

below in Table RFI #1. The Table RFI #1 information is requested to be provided to the

regional office by April 3, 2019, or sooner, to facilitate the selection of the specific items

that will be reviewed during the onsite inspection weeks.

The inspection team will examine the returned documentation from the first RFI and

identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more

focused follow-up request to develop the second RFI. The inspection team will submit

the specific systems and equipment list to your staff by April 17, 2019, which will identify

Enclosure

DOCUMENT REQUEST FOR CYBER-SECURITY INSPECTION

the specific systems and equipment that will be utilized to evaluate the CSs/CDAs,

defensive architecture, and the areas of the licensees CSP selected for the

Cyber-Security Inspection. All requests for this information shall follow the Table RFI #1

and the guidance document referenced above.

The required Table RFI #1 information shall be provided on compact disc (CD) to the

lead inspector by May 5, 2019. Please provide five copies of each CD submitted

(i.e., one for each inspector/contractor). The preferred file format for all lists is a

searchable Excel spreadsheet file. These CDs should be indexed and hyper-linked to

facilitate ease of use. If you have any questions regarding this information, please call

the inspection team leader as soon as possible.

Table RFI #1

Reference Section 3, Paragraph Number/Title: Items

1 List All Identified CSs and CDAs All

2 List CDA Facility and Site EthernetTransmission Control All

Protocol/Internet Protocol Based Local Area Networks (LANs)

and Identify Those LANs That Have Non-CDAs On Them

3 List CDA Facility and Site Non-Ethernet Transmission Control All

Protocol/Internet Protocol Based LANs Including Those Industrial

Networks and Identify LANs That Have Non-CDAs On Them

4 Network Topology Diagrams (Be Sure To Include All Network All

Intrusion Detection Systems and Security Information and Event

Managements (SIEM) for Emergency Preparedness Networks

and Security Level 3 and 4 Networks)

8 List All Network Security Boundary Devices for EP Networks and All

All Network Security Boundary Devices for Levels 3 and 4

9 List CDA Wireless Industrial Networks All

11 Network Intrusion Detection System Documentation for CSs That 11.a.1) 11.a.2)

Have CDAs Associated with Them

12 SIEM Documentation for CSs That Have CDAs Associated with 12.a.1) 12.a.2)

Them

14 List EP and Security Onsite and Offsite Digital Communication All

25 Cyber-Security Assessment and Cyber-Security Incident All

Response Teams

28 Copy of Current Cyber Security Plan and Copy of 50.54(p) All

Analysis To Support Changes To That Plan

29 Copy Of Any Licensee-Identified Violations and Associated All

Corrective Action Program Documentation To Resolve Issue(s)

In addition to the above information please provide the following:

(1.) Electronic copy of the Updated Finals Safety Analysis Report and technical

specifications.

(2.) Name(s) and phone numbers for the regulatory and technical contacts.

(3.) Current management and engineering organizational charts.

2

DOCUMENT REQUEST FOR CYBER-SECURITY INSPECTION

Based on this information, the inspection team will identify and select specific systems

and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and

submit a list of specific systems and equipment to your staff by April 17, 2019, for the

second RFI (i.e., Table RFI #2).

II. Additional Information Requested to be Available Prior to Inspection

As stated above, in Section I. of this enclosure, the inspection team will examine the

returned documentation requested from Table RFI #1 and submit the list of specific

systems and equipment to your staff by April 17, 2019, for the second RFI

(i.e., Table RFI #2). The second RFI will request additional information required to

evaluate the CSs/CDAs, defensive architecture, and the areas of the licensees CSP

selected for the Cyber-Security Inspection. The additional information requested for the

specific systems and equipment is identified in Table RFI #2. All requests for this

information shall follow the Table RFI #2 and the guidance document referenced above.

The Table RFI #2 information shall be provided on CD to the lead inspector by

May 5, 2019. Please provide five copies of each CD submitted (i.e., one for each

inspector/contractor). The preferred file format for all lists is a searchable Excel

spreadsheet file. These CDs should be indexed and hyper-linked to facilitate ease of

use. If you have any questions regarding this information, please call the inspection

team leader as soon as possible.

Table RFI #2

Reference Section 3, Paragraph Number/Title: Items

5 Plant Computer System Block Diagram (If Plant Computer All

System Is Selected for Inspection)

6 Plant Security System Block Diagram (If Security Computer All

System Is Selected for Inspection)

7 Systems That Are Distributed Block Diagrams (For Systems All

Selected for Inspection)

10 Host-Based Intrusion Detection System Documentation (For 10.a.1) 10.a.2)

CDAs for Systems Selected for Inspection)

13 List All Maintenance and Test Equipment Used On CDAs for All

Systems Selected for Inspection

15 Configuration Management All

16 Supply Chain Management 16.b. 16.c.1),

16.c.5), 16.c.6)

17 Portable Media and Mobile Device Control All

18 Software Management All

3

DOCUMENT REQUEST FOR CYBER-SECURITY INSPECTION

Table RFI #2

Reference Section 3, Paragraph Number/Title: Items

20 Vendor Access and Monitoring All

21 Work Control All

22 Device Access and Key Control All

23 Password/Authenticator Policy All

24 User Account/Credential Policy All

26 Corrective Actions Since Last U.S. Nuclear Regulatory All

Commission Inspection

27 Cyber Security Assessments for Selected Systems All

III. Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in this enclosuresSection II., provide

the following RFI (i.e., Table 1st Week Onsite) on CD by June 3, 2019, the first day of

the inspection. All requests for this information shall follow the Table 1st Week Onsite

and the guidance document referenced above.

Please provide five copies of each CD submitted (i.e., one for each inspector/contractor).

The preferred file format for all lists is a searchable Excel spreadsheet file. These CDs

should be indexed and hyper-linked to facilitate ease of use. If you have any questions

regarding this information, please call the inspection team leader as soon as possible.

Table 1st Week Onsite

Reference Section 3, Paragraph Number/Title: Items

10 Host-Based Intrusion Detection System Documentation for CDAs 10.a.3) thru

for Systems Selected for Inspection 10.a.12)

11 Network Intrusion Detection System Documentation for CSs That 11.a.3) thru

Have CDAs Associated with Them 11.a.15)

12 SIEM Documentation for CSs That Have CDAs Associated with 12.a.3) thru

Them 12.a.14)

16 Supply Chain Management 16.c.2) 16.c.3)

16.c.4)

19 Cyber-Security Event Notifications All

29 Update to Licensee Identified Violations and Corrective Action All

Program Actions Taken Since the Initial Request Was Made

In addition to the above information please provide the following:

(1.) Copies of the following documents do not need to be solely available to the

inspection team as long as the inspectors have easy and unrestrained access to

them.

a. Original Final Safety Analysis Report Volumes;

b. Original Safety Evaluation Report and Supplements;

4

DOCUMENT REQUEST FOR CYBER-SECURITY INSPECTION

c. Final Safety Analysis Report Question and Answers;

d. Quality Assurance Plan;

e. Latest Individual Plant Examination/Probabilistic Risk Assessment Report;

and

f. Vendor Manuals.

(2.) Assessment and Corrective Actions:

a. The most recent Cyber-Security Quality Assurance audit and/or

self-assessment; and

b. Corrective action documents (e.g., condition reports, including status of

corrective actions) generated as a result of the most recent Cyber-Security

Quality Assurance audit and/or self-assessment.

IV. Information Requested To Be Provided Throughout the Inspection

(1.) Copies of any corrective action documents generated as a result of the

inspection teams questions or queries during the inspection.

(2.) Copies of the list of questions submitted by the inspection team members and

the status/resolution of the information requested (provided daily during the

inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the inspection

team leader.

5