ML15131A313
| ML15131A313 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 05/08/2015 |
| From: | Robert Daley Engineering Branch 3 |
| To: | Mccartney E Point Beach |
| References | |
| IR 2015010 | |
| Download: ML15131A313 (7) | |
See also: IR 05000266/2015010
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE RD. SUITE 210
LISLE, IL 60532-4352
May 8, 2015
Mr. Eric McCartney
Site Vice President
NextEra Energy Point Beach, LLC
6610 Nuclear Road
Two Rivers, WI 54241
SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - INFORMATION REQUEST
FOR AN NRC TRIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59
(MOD/50.59) BASELINE INSPECTION 05000266/2015010; 05000301/2015010
Dear Mr. McCartney:
On August 10, 2015, the U.S. Nuclear Regulatory Commission (NRC) will begin a MOD/50.59
baseline inspection at the Point Beach Nuclear Plant, Units 1 and 2. This inspection will be
performed in accordance with the NRC baseline Inspection Procedure (IP) 71111.17T. The
onsite portion of the inspection will take place on August 10 -14, 2015, and August 24-28, 2015.
Experience has shown that these baseline inspections are extremely resource intensive, both
for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on
the site and to ensure a productive inspection for both parties, we have enclosed a request for
documents needed for the inspection. These documents have been divided into three groups.
The first group of information is necessary to ensure that the inspection team is adequately
prepared for the inspection. This information should be made available via compact disc, and
delivered to the regional office no later than June 30, 2015. The inspection team will review this
information and, by July 14, 2015, will request specific items that should be provided for review
in the regional office by July 27, 2015.
The second group of requested documents contains additional items that the team will review,
or need access to, during the inspection. Certain documents contained within Group II
(i.e., Item [1]), will be requested for review in the regional office prior to the inspection by
July 27, 2015, as identified above. The remaining documents should be available by the first
day of the on-site inspection, August 10, 2015.
The third group lists information necessary to aid the inspection team in tracking issues
identified as a result of the inspection. It is requested that this information be provided to the
lead inspector as the information is generated during the inspection. It is important that all of
these documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the on-site portions of the inspection.
The lead inspector for this inspection is Mr. Jorge Corujo-Sandín. We understand that our
regulatory contact for this inspection is Ms. Kim Locke of your organization. If there are any
questions about the inspection or the material requested, please contact the lead inspector at
(630) 829-9741, or via e-mail at Jorge.Corujo-Sandin@nrc.gov.
E. McCartney
-2-
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter, its enclosure, and your response (if any) will be available electronically for public
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
/RA Dariusz Szwarc Acting for/
Robert C. Daley, Chief
Engineering Branch 3
Division of Reactor Safety
Docket Nos. 50-266; 50-301
Enclosure:
Modification and 50.59 Inspection Document Request
cc w/encl: Distribution via LISTSERV
MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST
Enclosure
Inspection Report: 05000266/2015010; 05000301/2015010
Inspection Dates:
August 10-14, 2015
August 24-28, 2015
Inspection Procedure:
IP 71111.17T, Evaluations of Changes, Tests, and Experiments
and Permanent Plant Modifications
Lead Inspector:
Jorge Corujo-Sandín
(630) 829-9741
Jorge.Corujo-Sandin@nrc.gov
I.
Information Requested for In-Office Preparation Week
The following information is requested by June 30, 2015, or sooner, to facilitate the
selection of specific items that will be reviewed during the onsite inspection week. The
inspection team will select specific items from the information requested below, and
submit a list to your staff by July 14, 2015. We will request that certain items be made
available to the regional office prior to the inspection by July 27, 2015. We request that
the remaining items selected from the lists be available and ready for review on the first
day of inspection. All requested information should identify the associated system, and
cover the time frame from the receipt of information for the last MOD/50.59 inspection to
the present.
The required information identified below should be provided on compact disc (CD).
Please provide three copies of each CD submitted (i.e., one for each inspector).
The preferred file format is a searchable pdf file. The CDs should be indexed and
hyper-linked to facilitate ease of use, if possible. If you have any questions regarding
this information, please call the inspection team leader as soon as possible.
(1)
List of permanent plant modifications to systems, structures or components that
are field work complete. (For the purpose of this inspection, permanent plant
modifications include permanent: plant changes, design changes, set point
changes, equivalency evaluations, suitability analyses, and commercial grade
The list should contain the number of each document, the title, the revision
(or date), and the affected system. In addition to the list, please provide a
description of each modification and a list of associated calculations and affected
procedures.
(2)
List of all Title 10, Code of Federal Regulations (CFR) Part 50.59 completed
evaluations involving (a) calculations, (b) procedure revisions, (c) changes to the
facility (modifications), (d) non-routine operating configurations, or (e) departures
in methods of analyses. This list should include 50.59 evaluations for the
following:
MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST
2
a.
Changes that have been made under the provisions of 10 CFR 50.59 that
have been updated in accordance with 10 CFR 50.71(e)(4) since the last
MOD/50.59 inspection;
b.
Modifications that are field work complete; and
c.
Changes to calculations (or initiation of new calculations) that have been
issued. The list should contain the number and title of each document, a
brief description of the change, and the corresponding number and type
of the affected document (i.e., the modification or procedure to which the
evaluation applies). The list should NOT include any evaluations in
which prior NRC approval was sought and obtained.
(3)
A list of all 10 CFR 50.59 changes that have been screened out as not requiring
a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes
to the facility (modifications); (d) non-routine operating configurations; or
(e) departures in methods of analyses.
The list should contain the number and title of each document, a brief description
of the change, and the corresponding number and type of the affected document
(i.e., the modification or procedure to which the evaluation applies).
(4)
A list of any modifications, procedure revisions, or Updated Final Safety Analysis
Report (UFSAR) changes where it was determined that 10 CFR 50.59 did not
apply.
(5)
A list of calculation changes that have been issued for use.
(6)
A list of corrective action documents (open and closed) that address permanent
plant modifications or 10 CFR 50.59 issues, concerns, or processes. These
documents should also include the corrective action documents associated with
the modification, and the 50.59 change implementation.
The list should contain the number, title and revision (or date) of each document,
the affected system and corresponding documentation (if applicable), and should
be sorted in order of significance.
(7)
Copies of procedures addressing the following: modifications, design changes,
set point changes, equivalency evaluations or suitability analyses, commercial
grade dedications, post-modification testing, 10 CFR 50.59 evaluations and
screenings, and UFSAR updates.
(8)
UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide
copies of the complete submittal.
(9)
Copy of the UFSAR change log or a synopsis of the changes. This should
include all of the changes made to the UFSAR that were incorporated in the last
10 CFR 50.71(e)(4) submittal.
(10)
Electronic copy of the UFSAR and technical specifications, if available.
(11)
Name(s) and phone numbers for the regulatory and technical contacts.
(12)
Current management and engineering organizational chart.
MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST
3
II.
Information Requested to be Available Prior to Inspection. Requests will be Made
for Specific Item (1) Documents by July 14, 2015, for Availability of Requested
Item (1) Documents in Regional Office by July 27, 2015, and Items (2), (3) and
(4) Documents on First Day of Inspection (August 10, 2015).
(1)
Copies of all selected items from Section I. This includes copies of
associated documents such as calculations, post-modification test packages,
10 CFR 50.59 evaluations or screenings, and any corrective action documents.
(2)
Copies of these documents do not need to be solely available to the inspection team
as long as the inspectors have easy and unrestrained access to them.
a. UFSAR, if not previously provided;
b. Original FSAR Volumes;
c. Original SER and Supplements;
d. FSAR Question and Answers;
e. Quality Assurance Plan;
f. Technical Specifications, if not previously provided;
g. Latest IPE/PRA Report;
h. Vendor Manuals; and
i.
The latest 10 CFR 50.59 UFSAR Update Submittal.
(3)
Please ensure that other supporting documents for the selected items have been
located and are readily retrievable as the inspection team will likely be requesting
these documents during the inspection. Examples of supporting documents are:
a.
Drawings supporting the modifications;
b.
Procedures affected by the modifications; and
c.
UFSAR change papers generated due to a 10 CFR 50.59 evaluation.
(4)
Assessment and Corrective Actions:
a.
The most recent MOD/50.59 Quality Assurance (QA) audit and/or self-
assessment; and
b.
Corrective action documents (e.g., condition reports, including status of
corrective actions) generate as a result of the most recent MOD/50.59 Quality
Assurance (QA) audit and/or self-assessment.
MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST
4
III.
Information Requested to be provided throughout the inspection
(1)
Copies of any corrective action documents generated as a result of the inspection
teams questions or queries during this inspection.
(2)
Copies of the list of questions submitted by the inspection team members and the
status/resolution of the information requested (provide daily during the inspection to
each inspection team member).
If you have any questions regarding the information requested, please contact the inspection
team leader.
E. McCartney
-2-
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document displays
a currently valid Office of Management and Budget Control Number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections,
Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its
enclosure, and your response (if any) will be available electronically for public inspection in the NRCs
Public Document Room or from the Publicly Available Records (PARS) component of the NRC's
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the
NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA Dariusz Szwarc Acting for/
Robert C. Daley, Chief
Engineering Branch 3
Division of Reactor Safety
Docket Nos. 50-266; 50-301;
Enclosure:
Modification and 50.59 Inspection Document Request
cc w/encl: Distribution via LISTSERV
DISTRIBUTION w/encl:
Kimyata MorganButler
RidsNrrDorlLpl3-1 Resource
RidsNrrPMPointBeach
RidsNrrDirsIrib Resource
Cynthia Pederson
DRPIII
DRSIII
ADAMS Accession Number ML15131A313
Publicly Available
Non-Publicly Available
Sensitive
Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE
RIII
RIII
RIII
RIII
NAME
JCorujo-Sandin:cl
DSzwarc for RDaley
DATE
05/07/15
05/08/15
OFFICIAL RECORD COPY