ML113390281

From kanterella
Jump to navigation Jump to search

Request for Additional Information, 60-Day Response to NRC Bulletin 2011-01, Mitigating Strategies
ML113390281
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/07/2011
From: Thadani M
Plant Licensing Branch IV
To: Heflin A
Union Electric Co
Thadani, M C, NRR/DORL/LP4, 415-1476
References
TAC ME6411, BL-11-001
Download: ML113390281 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 7,2011 Mr. Adam C. Heflin Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251

SUBJECT:

CALLAWAY PLANT, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING 60-DAY RESPONSE TO BULLETIN 2011-01, "MITIGATING STRATEGIES" (TAC NO. ME6411)

Dear Mr. Heflin:

On May 11, 2011, the U.S. Nuclear Regulatory Commission (NRC) issued Bulletin 2011-01, "Mitigating Strategies" (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML111250360), to all holders of operating licenses for nuclear power reactors, except those that have permanently ceased operation and have certified that fuel has been removed from the reactor vessel. The purpose of the bulletin was to obtain a comprehensive verification that licensees' mitigating strategies, to maintain or restore core cooling, spent fuel cooling, and containment following large explosions or fires, were in compliance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(hh)(2).

The bulletin requested information on licensees' 10 CFR 50.54(hh)(2) mitigating strategies in light of the recent events at Japan's Fukushima Daiichi facility to determine if (1) additional efforts are needed to ensure compliance with current requirements, (2) whether enhancement to the existing regulations and guidance are necessary, and/or assessment of program implementation is needed, (2) the current inspection program should be enhanced, or (3) to determine if further regulatory action is warranted.

The bulletin required two sets of responses pursuant to the provisions of 10 CFR 50.54(f). The first responses were due 30 days after issuance of the bulletin. By letter dated June 10, 2011 (ADAMS Accession No. ML111640447), Union Electric Company (the licensee), provided a response to the first set of questions for Callaway Plant, Unit 1. The second responses were due 60 days after issuance of the bulletin. By letter dated July 11, 2011 (ADAMS Accession No. ML111930161), the licensee responded to this second set of questions.

The NRC staff has reviewed the information provided in your letters dated June 10 and July 11, 2011, and determined that additional information is needed for the NRC staff to complete its review of your 60-day response to the bulletin. Please respond to the enclosed request for additional information within 30 days of the date of this letter.

A. Heflin - 2 If you have any questions regarding this letter, please contact me at (301) 415-1476 or via e-mail at mohan.thadani@nrc.gov.

Sincerely, Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483

Enclosure:

As stated cc w/encl: See next page

REQUEST FOR ADDITIONAL INFORMATION 60-DAY RESPONSE TO NRC BULLETIN 2011-01. "MITIGATING STRATEGIES" UNION ELECTRIC COMPANY CALLAWAY PLANT. UNIT 1 DOCKET NO. 50-483 On May 11, 2011, the U.S. Nuclear Regulatory Commission (NRC) issued Bulletin 2011-01, "Mitigating Strategies" (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML111250360), to all holders of operating licenses for nuclear power reactors, except those that have permanently ceased operation and have certified that fuel has been removed from the reactor vessel. The purpose of the bulletin was to obtain a comprehensive verification that licensees' mitigating strategies, to maintain or restore core cooling, spent fuel cooling, and containment following large explosions or fires, were in compliance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(hh)(2).

The bulletin required two sets of responses pursuant to the provisions of 10 CFR 50.54(f). The first responses were due 30 days after issuance of the bulletin. By letter dated June 10, 2011 (ADAMS Accession No. ML111640447), Union Electric Company (the licensee), provided a response to the first set of questions for Callaway Plant, Unit 1. The second responses were due 60 days after issuance of the bulletin. By letter dated July 11, 2011 (ADAMS Accession No. ML111930161), the licensee responded to this second set of questions.

The NRC staff has reviewed the information provided in your letters dated June 10 and July 11, 2011, and determined that additional information is needed for the NRC staff to complete its review of your 60-day response to the bulletin.

1. Please describe in detail how you ensure there is sufficient fuel for the pumping source when needed.

The bulletin requested that each licensee describe in detail the maintenance of equipment supporting the mitigating strategies to ensure that it will be functional when needed.

Enclosure

ML113390281 OFFICE NRR/DORLlLPL4/PM NRR/DORLlLPL4/LA NRR/DPR/PGCB/PM NAME MThadani JBurkhardt BPurnel1 DATE 12/6/11 12/6/11 12/6/11 OFFICE NRRIDPR/PGCB/BC NRRIDORLlLPL4/BC NRRIDORLlLPL4/PM NAME SRosenberg MMarkley (JRHall for) MThadani DATE 12/6/11 12/7/11 12/7/11