ULNRC-05807, 60-Day Response to NRC Bulletin 2011-01, Mitigating Strategies

From kanterella
(Redirected from ML111930161)
Jump to navigation Jump to search

60-Day Response to NRC Bulletin 2011-01, Mitigating Strategies
ML111930161
Person / Time
Site: Callaway Ameren icon.png
Issue date: 07/11/2011
From: Reasoner C
Ameren Missouri
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML111930160 List:
References
BL-11-001, ULNRC-05807
Download: ML111930161 (4)


Text

~~

WAmeren Callaway Plant MISSOURI SECURITY-RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 July 11, 2011 ULNRC-05807 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50. 54(f)

Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 60-DAY RESPONSE TO NRC BULLETIN 2011-01, "MITIGATING STRATEGIES" The Nuclear Regulatory Commission (NRC) issued Bulletin 2011-01, "Mitigating Strategies," dated May 11, 2011, to request each licensee to provide a comprehensive verification of their compliance with the regulatory requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section

50. 54(hb)(2). Addressees are required to provide a written response to the NRC in accordance with 10 CFR 50.54(f).

In Bulletin 2011-01, the NRC requested each licensee to submit a written response within 30 days of the date of the Bulletin, which was provided for Callaway Plant on June 10, 2011.

The Enclosure to this letter forwards the response requested within 60 days of the date of the Bulletin to provide information for Callaway Plant regarding mitigation strategies programs for 10 CFR 50.54(hh)(2).

The Enclosure to this letter contains sensitive information.

Withhold from public disclosure under 10 CFR 2.390.

Upon removal of the Enclosure, this letter is uncontrolled.

SECURITY-RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 PO Box 620 Fulton, MO 65251 AmerenMissouri.com

ULNRC-05807 July 11, 2011 Page 2 The Enclosure includes information that addresses measures that are currently in place. There are no new regulatory commitments contained in this letter. If there are any questions, or if additional information is required, please contact Steve Hogan, Assistant Manager Protective Services, at 573-544-5881.

I declare under penalty of perjury that the foregoing and attached are true and correct.

Sincerely, Executed on: JuJ j I \ ) AD II ~t?

Cleveland o. Reasoner III Vice President Engineering KRNnls

Enclosure:

60-Day Response to Bulletin 2011-01

ULNRC-05807 July 11, 2011 Page 3 cc:

(copy w/out Enclosure except as noted with asterisk*)

Mr. Elmo E. Collins, Jr.

  • Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Mohan C. Thadani (2 copies)*

Senior Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8G 14 Washington, DC 20555-2738 Mr. James Polickoski*

Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8BIA Washington, DC 20555-2738

ULNRC-05807 July 11, 2011 Page 4 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4200 South Hulen, Suite 630 Fort Worth, TX 76109 (Certrec receives ALL attaclunents as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:

(electronic copy w/out Enclosure)

A. C. Heflin F. M. Diya C. O. Reasoner ill L. H. Graessle S. P. Banker S. P. Hogan S.M.Maglio T. B. Elwood S. L. Gallagher

~SRB Secretary Mr. Paul Parmenter, Director (SEMA)

Mr. Thomas Mohr, Senior REP Planner (SEMA)

Mr. John Campbell, REP Planner (SEMA)

Ms. Diane M. Hooper (WC~OC)

Mr. Tim Hope (Luminant Power)

Mr. Ron Barnes (APS)

Mr. Tom Baldwin (pG&E)

Mr. Wayne Harrison (STP~OC)

Ms. Linda Conklin (SCE)

Mr. John O'Neill (pillsbury Winthrop Shaw Pittman LLP)

Mr. Dru Buntin (DNR)

Text

~~

WAmeren Callaway Plant MISSOURI SECURITY-RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 July 11, 2011 ULNRC-05807 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50. 54(f)

Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 60-DAY RESPONSE TO NRC BULLETIN 2011-01, "MITIGATING STRATEGIES" The Nuclear Regulatory Commission (NRC) issued Bulletin 2011-01, "Mitigating Strategies," dated May 11, 2011, to request each licensee to provide a comprehensive verification of their compliance with the regulatory requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section

50. 54(hb)(2). Addressees are required to provide a written response to the NRC in accordance with 10 CFR 50.54(f).

In Bulletin 2011-01, the NRC requested each licensee to submit a written response within 30 days of the date of the Bulletin, which was provided for Callaway Plant on June 10, 2011.

The Enclosure to this letter forwards the response requested within 60 days of the date of the Bulletin to provide information for Callaway Plant regarding mitigation strategies programs for 10 CFR 50.54(hh)(2).

The Enclosure to this letter contains sensitive information.

Withhold from public disclosure under 10 CFR 2.390.

Upon removal of the Enclosure, this letter is uncontrolled.

SECURITY-RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 PO Box 620 Fulton, MO 65251 AmerenMissouri.com

ULNRC-05807 July 11, 2011 Page 2 The Enclosure includes information that addresses measures that are currently in place. There are no new regulatory commitments contained in this letter. If there are any questions, or if additional information is required, please contact Steve Hogan, Assistant Manager Protective Services, at 573-544-5881.

I declare under penalty of perjury that the foregoing and attached are true and correct.

Sincerely, Executed on: JuJ j I \ ) AD II ~t?

Cleveland o. Reasoner III Vice President Engineering KRNnls

Enclosure:

60-Day Response to Bulletin 2011-01

ULNRC-05807 July 11, 2011 Page 3 cc:

(copy w/out Enclosure except as noted with asterisk*)

Mr. Elmo E. Collins, Jr.

  • Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Mohan C. Thadani (2 copies)*

Senior Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8G 14 Washington, DC 20555-2738 Mr. James Polickoski*

Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8BIA Washington, DC 20555-2738

ULNRC-05807 July 11, 2011 Page 4 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4200 South Hulen, Suite 630 Fort Worth, TX 76109 (Certrec receives ALL attaclunents as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:

(electronic copy w/out Enclosure)

A. C. Heflin F. M. Diya C. O. Reasoner ill L. H. Graessle S. P. Banker S. P. Hogan S.M.Maglio T. B. Elwood S. L. Gallagher

~SRB Secretary Mr. Paul Parmenter, Director (SEMA)

Mr. Thomas Mohr, Senior REP Planner (SEMA)

Mr. John Campbell, REP Planner (SEMA)

Ms. Diane M. Hooper (WC~OC)

Mr. Tim Hope (Luminant Power)

Mr. Ron Barnes (APS)

Mr. Tom Baldwin (pG&E)

Mr. Wayne Harrison (STP~OC)

Ms. Linda Conklin (SCE)

Mr. John O'Neill (pillsbury Winthrop Shaw Pittman LLP)

Mr. Dru Buntin (DNR)