April 11, 2019 Mr. Fadi Diya, Senior Vice President and Chief Nuclear Officer Ameren Missouri Callaway Plant 8315 County Road 459 Steedman, MO 65077
SUBJECT:
CALLAWAY PLANT - NOTIFICATION OF CYBER SECURITY INSPECTION (NRC INSPECTION REPORT 05000483/2019410) AND REQUEST FOR INFORMATION
Dear Mr. Heflin:
On September 23, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin an inspection in accordance with Inspection Procedure (IP) 71130.10P, Cyber Security, Revision 0, at the Callaway Plant (CWY). This inspection evaluates and verifies your ability to meet the full implementation requirements of the NRCs Cyber Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73, Section 54, Protection of Digital Computer and Communication Systems and Networks. The onsite portion of the inspection will take place during the weeks of September 23 and October 7, 2019.
Experience has shown that these inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. The document request has been divided into four groups.
The first group specifies information necessary to assist the team in choosing the focus areas (i.e., sample set) to be inspected in accordance with the cyber security inspection procedure.
This information should be made available using either a secure document management service or passive media (i.e. CD, DVD) and delivered to the regional office no later than June 24, 2019. The inspection team will review this information and by the end of the planned information gathering visit on August 8, 2019, will request the specific items that should be provided for review. The second group of requested documents will assist the team in their evaluation of the critical systems and critical digital assets, defensive architecture, and the areas of the cyber security plan selected for inspection. This information will be requested for our review in the regional office prior to the inspection by August 26, 2019.
F. Diya 2
The third group of requested documents consists of those items that the team will review or need access to, during the inspection. Please have this information available by the first day of the onsite inspection, September 23, 2019.
The fourth group of information is necessary to aid the team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is Greg Pick. We understand that our regulatory contact for this inspection is Alexis Hunt. If there are any questions about the inspection or the material requested, please contact the lead inspector at 817-200-1270 or by e-mail at greg.pick@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Frances C. Ramírez, Chief Engineering Branch 2 Division of Reactor Safety Docket: 50-483 License: NPF-30
Enclosure:
Callaway Plant -
Cyber Security Inspection Document Request cc w/ encl: Electronic Distribution
Enclosure Callaway Plant - Cyber Security Inspection Document Request Inspection Report: 05000483/2019410 Inspection Dates:
Weeks of September 23, 2019, and October 7, 2019 Inspection Procedure:
IP 71130.10P, Cyber Security, Revision 0 Reference 1:
ML17156A215 - Guidance Document for Development of the Request for Information (RFI) and Notification Letter for Full-Implementation of the Cyber Security Inspection, Revision 1, dated October 26, 2017 NRC Inspectors:
Greg Pick, Lead Steven Alferink 817-200-1270 817-200-1548 greg.pick@nrc.gov steven.alferink@nrc.gov NRC Contractors:
Leyton Pitzer Chris Fiotes 703-869-5309 240-994-3075 leyton.pitzer@nrc.gov chris.fiotes@nrc.gov I. Information Requested for In-Office Preparation The initial request for information (i.e., first RFI) provides the team with the general information necessary to select appropriate components and cyber security plan elements to develop a site-specific inspection plan. The team will use the first set of information requested to identify the list of critical systems and critical digital assets plus operational and management security control portions of the cyber security plan to be chosen as the sample set required to be inspected during this inspection. The first information request is specified in Table RFI #1. Provide the first set of information to the team leader in the regional office by June 24, 2019, or sooner, to facilitate the selection of the specific items that will be reviewed during the onsite inspection weeks.
The required Table RFI #1 information shall be provided on a secure document management service or passive media (i.e. CD or DVD) to the lead inspector by June 24, 2019. Please provide four copies of each media submitted (i.e., one for each inspector/contractor). The preferred file format for all lists is a searchable Excel spreadsheet file on a CD or DVD. These files should be indexed and hyperlinked to facilitate efficient review. If you have any questions regarding this information, please contact the inspection team leader as soon as possible.
2 Table RFI #1 Section 3: Initial Documentation Requests (See Reference 1)
Paragraph Number/Title:
Items 1
List all identified critical systems and critical digital assets All 2
List critical digital asset facility and site ethernet - transmission control protocol/internet protocol (TCP/IP) based local area networks (LANs) and identify those LANs that have non-critical digital assets on them All 3
List critical digital asset facility and site non-ethernet TCP/IP based LANs including those industrial networks and identify LANs that have non-critical digital assets on them All 4
Network topology diagrams (be sure to include all network intrusion detection systems and security information and event management (SIEMs) for emergency preparedness (EP) networks and security level 3 and 4 networks)
All 8
List all network security boundary devices for EP networks and all network security boundary devices for levels 3 and 4 All 9
List critical digital asset wireless Industrial networks All 11 Network Intrusion detection system documentation for critical systems that have critical digital assets associated with them 11.a.1) 11.a.2) 12 SIEM documentation for critical systems that have critical digital assets associated with them 12.a.1) 12.a.2) 14 List EP and security onsite and offsite digital communication systems All 25 Cyber security assessment and cyber security incident response teams All 28 Copy of current cyber security plan and copy of any 50.54(p) analysis to support changes to that plan All 29 Copy of any licensee identified violations and associated corrective action program documentation to resolve issue(s)
All In addition to the above information please provide the following:
(1) Electronic copy of the updated safety analysis report and technical specifications (2) Name(s) and phone number(s) for the regulatory and technical contacts (3) Current management and engineering organizational charts related to cyber security (4) Cyber security program procedures Based on this information, the team will identify and select specific systems and equipment (e.g., critical systems and critical digital assets) from the information requested by Table RFI #1 and submit a list of specific systems and equipment to your staff by the end of the information gathering visit on August 8, 2019, for the second information request (i.e., Table RFI #2).
3 II. Additional Information Requested to be Available Prior to Inspection As stated in Section I, the team will examine the documents from the initial information request and submit the list of specific systems and equipment to your staff by the end of the information gathering visit on August 8, 2019. This second information request (i.e.,
Table RFI #2) obtains additional documents required to evaluate the critical systems and critical digital assets, defensive architecture, and the areas of the cyber security program selected for the cyber security inspection. The additional information requested for the specific systems and equipment is identified in Table RFI #2. All requested information shall follow the guidance document Reference 1.
The Table RFI #2 information shall be provided on a secure document management service or passive media to the lead inspector by August 26, 2019, or sooner. Please provide four copies of each CD/DVD submitted (i.e., one for each inspector/contractor).
The preferred file format for all lists is a searchable Excel spreadsheet file on a CD/DVD.
These files should be indexed and hyperlinked to facilitate efficient review. If you have any questions regarding this information, please call the inspection team leader as soon as possible.
Table RFI #2 Section 3: Initial Documentation Requests (See Reference 1)
Paragraph Number/Title:
Items 5
Plant computer system block diagram (if plant computer system is selected for inspection)
All 6
Plant security system block diagram (if security computer system is selected for inspection)
All 7
Block diagrams for distributed systems (for systems selected for inspection)
All 10 Host-based intrusion detection system documentation for critical digital assets (for systems selected for inspection) 10.a.1) 10.a.2) 13 List all maintenance and test equipment (M&TE) used on critical digital assets (for systems selected for inspection)
All 15 Configuration management All 16 Supply chain management 16.a 16.b 17 Portable media and mobile device control All 18 Software management All 20 Vendor access and monitoring All 21 Work control All 22 Device access and key control All 23 Password/authenticator policy All
4 Table RFI #2 Section 3: Initial Documentation Requests (See Reference 1)
Paragraph Number/Title:
Items 24 User account/credential policy All 26 Corrective actions since last NRC inspection All 27 Cyber security assessments for selected systems All In addition to the above information please provide the following:
(1) Names and positions of the CSAT and CSIRT members.
(2) Copies of lessons plans and training presented to the CSAT and CSIRT members, continuing technical training for engineers, as well as any general awareness training.
(3) List of dates of CSAT meetings that have occurred.
III. Information Requested to be Available on First Day of Inspection For the specific systems and equipment identified in Section II, provide the following request for information (i.e., Table 1st Week Onsite) on a secure document management service or passive media by September 23, 2019, the first day of the inspection. All requested information shall follow the guidance in Reference 1.
Please provide four copies of each CD submitted (i.e., one for each inspector/contactor).
The preferred file format for all lists is a searchable Excel spreadsheet file on a CD/DVD.
These files should be indexed and hyperlinked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.
Table 1st Week Onsite Section 3: Initial Documentation Requests (See Reference 1)
Paragraph Number/Title:
Items 10 Host-based intrusion detection system documentation for critical digital assets (for systems selected for inspection) 10.a.3) thru 10.a.12) 11 Network Intrusion detection system documentation for critical systems that have critical digital assets associated with them 11.a.3) thru 11.a.15) 12 SIEM documentation for critical systems that have critical digital assets associated with them 12.a.3) thru 12.a.14) 16 Supply chain management 16.c 19 Cyber security event notifications All
5 Table 1st Week Onsite Section 3: Initial Documentation Requests (See Reference 1)
Paragraph Number/Title:
Items 29 Update to licensee identified violations and corrective action program actions taken since the initial request was made All In addition to the above information please provide the following:
(1) Copies of the following documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to them.
- a. Quality Assurance Plan;
- b. Technical Specifications, if not previously provided;
- c. Latest Individual Plant Examination/Probabilistic Risk Assessment Report; and, (2) Vendor Manuals, Assessments, and Corrective Actions:
- a. The most recent cyber security quality assurance audit and/or self-assessment; and
- b. Corrective action documents (e.g., condition reports, including status of corrective actions) generated as a result of the most recent cyber security quality assurance audit and/or self-assessment.
IV.
Information Requested To Be Provided Throughout the Inspection (1) Copies of any corrective action documents generated as a result of the inspection teams questions or queries during the inspection.
(2) Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provided daily during the inspection to each inspection team member).
If you have any questions regarding the information requested, please contact the team leader.
ML19107A515 X SUNSI Review ADAMS:
Non-Publicly Available X Non-Sensitive Keyword:
By: GAP X Yes No X Publicly Available Sensitive OFFICE SRI:EB2 BC:EB2 NAME GPick FRamirez SIGNATURE
/RA/
/RA/
DATE 04/11/19 04/11/19