UNITED STATES NU C LE AR RE G ULATO RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU ITE 400 AR LIN GTON , TEXAS 76011-4125 September 1, 2009 John T. Conway, Senior Vice President &

Chief Nuclear Officer Pacific Gas and Electric Company P.O. Box 3 Mail Code 104/6/601 Avila Beach, CA 93424

SUBJECT:

MIDCYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - DIABLO CANYON POWER PLANT

Dear Mr. Conway:

On August 4, 2009, the NRC staff completed its performance review of Diablo Canyon Power Plant, Units 1 and 2. Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from July 1, 2008, through June 30, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as Official Use Only--Security Information will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at Diablo Canyon Power Plant, Units 1 and 2, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). In addition to baseline inspections, we also plan on implementing Inspection Procedure 71007, Reactor Vessel Head Replacement Inspection, for Unit 2.

In the 2008 annual assessment letter, dated March 4, 2009, the NRC identified a crosscutting theme associated with the corrective action program component of the problem identification and resolution area related to the failure of site personnel to thoroughly evaluate problems

[P.1.(c)]. At the time, the NRC did not identify a substantive crosscutting issue because this theme represented a recent performance trend. Once identified, you placed this issue into your corrective action program and began developing actions to address this issue.

During the current 12-month assessment period, the staff identified more than four Green findings with documented crosscutting aspects in the area of problem identification and resolution associated with the same theme related to the failure of site personnel to thoroughly evaluate problems [P.1.(c)]. Specifically, seven findings with this crosscutting theme were identified during this current assessment period. Although some of these findings were documented in the last quarter of the assessment period, only one was related to an inadequate evaluation that originated in the last quarter of the assessment period. Since the number of

Pacific Gas and Electric Company findings with this crosscutting theme continued to decrease during the assessment period, it appears that the corrective actions you have implemented have begun to show some improvement. As such, we have determined that a substantive crosscutting issue does not exist at this time. We will continue to monitor the progress of your corrective action through the baseline inspection program over the assessment period.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2010. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review. We are also evaluating potential changes to the inspection program in the radiation safety cornerstone. Consequently, some specific inspection procedures and the inspection schedule may be revised for 2010.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 817-860-8141 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Vincent Gaddy, Chief Reactor Projects Branch B Division of Reactor Projects Dockets: 50-275, 50-323 Licenses: DPR-80; DPR-82

Enclosure:

Diablo Canyon Inspection/Activity Plan

Pacific Gas and Electric Company cc w/

Enclosure:

Sierra Club San Lucia Chapter ATTN: Andrew Christie Chief, Technological Hazards Branch P.O. Box 15755 FEMA Region IX San Luis Obispo, CA 93406 1111 Broadway, Suite 1200 Oakland, CA 94607-4052 Nancy Culver San Luis Obispo City Editor Mothers for Peace The Tribune P.O. Box 164 3825 South Higuera Street Pismo Beach, CA 93448 P.O. Box 112 San Luis Obispo, CA 93406-0112 Chairman San Luis Obispo County James D. Boyd, Commissioner Board of Supervisors California Energy Commission 1055 Monterey Street, Suite D430 1516 Ninth Street (MS 31)

San Luis Obispo, CA 93408 Sacramento, CA 95814 Truman Burns\Robert Kinosian James R. Becker, Site Vice President &

California Public Utilities Commission Station Director 505 Van Ness Ave., Rm. 4102 Diablo Canyon Power Plant San Francisco, CA 94102 P.O. Box 56 Avila Beach, CA 93424 Diablo Canyon Independent Safety Committee Jennifer Tang Attn: Robert R. Wellington, Esq. Field Representative Legal Counsel United States Senator Barbara Boxer 857 Cass Street, Suite D 1700 Montgomery Street, Suite 240 Monterey, CA 93940 San Francisco, CA 94111 Director, Radiological Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414

Pacific Gas and Electric Company Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.goV)

DRP Director (Roy.Caniano@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

Branch Chief, DRP (Vincent.Gaddy@nrc.gov)

Senior Project Engineer, DRP (Rick.Deese@nrc.gov)

Senior Resident Inspector (Michael.Peck@nrc.gov)

Resident Inspector (Tony.Brown@nrc.gov)

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Regional State Liaison Officer (Bill.Maier@nrc.gov)

RA Secretary (Lucy.Owen@nrc.gov)

DRA Secretary (Judy.Kilcrease@nrc.gov)

Branch Chief, DRS/EB1 (Thomas.Farnholtz@nrc.gov)

Branch Chief, DRS/EB2 (Neil.OKeefe@nrc.gov)

Branch Chief, DRS/PSB1 (Michael.Shannon@nrc.gov)

Branch Chief, DRS/PSB2 (Greg.Werner@nrc.gov)

Branch Chief, DRS/OB (Ryan.Lantz@nrc.gov)

OEDO RIV Coordinator, Primary (Leigh.Trocine@nrc.gov)

OEDO, TRPS (Tamara.Bloomer@nrc.gov)

Deputy Director, DIRS, NRR (Frederick.Brown@nrc.gov)

Director, DORL, NRR (Joseph Giitter@nrc.gov)

Deputy Director, DORL, NRR (Timothy.McGinty@nrc.gov)

Chief, PLB IV, DORL, NRR (Thomas.Hiltz@nrc.gov)

NRR Project Manager (Alan.Wang@nrc.gov)

RidsNrrDirslpab (Resource@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov) mortensengk@INPO.org ROPreports File located: R:\EOC and Midcycle\Midcycle Assessment Letters\2009\DC.doc SUNSI Rev Compl. 7Yes No ADAMS 7Yes No Reviewer Initials VGG Publicly Avail 7Yes No Sensitive Yes 7No Sens. Type Initials VGG RIV:SPE/DRP/PBB C:DRP/PBB D:DRS CLDRO/PBB RWDeese VGGaddy RJCaniano VGGaddy

/RA/ /RA/ /RA/ /RA/

8/19/09 8/19/09 8/20/09 8/27/09 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Page 1 of 2 Diablo Canyon 08/17/2009 14:25:29 Inspection / Activity Plan Report 22 09/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PBB-RVH2 - UNIT 2 REACTOR VESSEL HEAD REPLACEMENT 2 2 05/10/2009 12/31/2009 IP 71007 Reactor Vessel Head Replacement Inspection EB1-08 - U2 INSERVICE INSPECTION 3 2 10/12/2009 10/23/2009 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 2 10/12/2009 10/23/2009 IP 7111108P Inservice Inspection Activities - PWR EXAM - INITIAL EXAM 6 1 11/30/2009 12/04/2009 X02435 INITIAL EXAM- DC (4/31/2010) 2 11/30/2009 12/04/2009 X02436 INITIAL EXAM- DC 2 (3/31/2010) 2 01/11/2010 01/22/2010 X02435 INITIAL EXAM- DC (4/31/2010) 1 01/11/2010 01/22/2010 X02436 INITIAL EXAM- DC 2 (3/31/2010)

RP-ORS5 - OCCUPATIONAL RADIATION SAFETY - ALARA 1 1, 2 12/14/2009 12/18/2009 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 12/14/2009 12/18/2009 IP 7112102 ALARA Planning and Controls 1, 2 12/14/2009 12/18/2009 IP 71151 Performance Indicator Verification EB1-21 - CDBI 6 1, 2 02/08/2010 02/12/2010 IP 7111121 Component Design Bases Inspection 1, 2 02/22/2010 03/05/2010 IP 7111121 Component Design Bases Inspection PSB2-52B - BIENNIAL PI&R 4 1, 2 03/22/2010 03/26/2010 IP 71152B Identification and Resolution of Problems 1, 2 04/05/2010 04/09/2010 IP 71152B Identification and Resolution of Problems EXAM - INITIAL EXAM 3 1 04/12/2010 04/16/2010 X02435 INITIAL EXAM- DC (4/31/2010) 1 05/17/2010 05/21/2010 X02435 INITIAL EXAM- DC (4/31/2010)

RP-ORS2 - OCCUPATIONAL RADIATION SAFETY-ALARA 1 1, 2 06/14/2010 06/18/2010 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 06/14/2010 06/18/2010 IP 7112102 ALARA Planning and Controls 1, 2 06/14/2010 06/18/2010 IP 71151 Performance Indicator Verification EP-1 - BIENNIAL EP EXERCISE INSPECTION 3 1, 2 08/09/2010 08/13/2010 IP 7111401 Exercise Evaluation 1, 2 08/09/2010 08/13/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 08/09/2010 08/13/2010 IP 71151-EP01 Drill/Exercise Performance 1, 2 08/09/2010 08/13/2010 IP 71151-EP02 ERO Drill Participation 1, 2 08/09/2010 08/13/2010 IP 71151-EP03 Alert & Notification System RP-ORS1 - OCCUPATIONAL RADIATION SAFETY 1 1, 2 10/04/2010 10/08/2010 IP 7112101 Access Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Diablo Canyon 08/17/2009 14:25:29 Inspection / Activity Plan Report 22 09/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RP-ORS1 - OCCUPATIONAL RADIATION SAFETY 1 1, 2 10/04/2010 10/08/2010 IP 7112102 ALARA Planning and Controls 1, 2 10/04/2010 10/08/2010 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 10/04/2010 10/08/2010 IP 71151-PR01 RETS/ODCM Radiological Effluent EB1-08P - INSERVICE INSPECTION - U1 3 1 10/12/2010 11/05/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 1 10/12/2010 11/05/2010 IP 7111108P Inservice Inspection Activities - PWR EB2-07T - TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 12/06/2010 12/10/2010 IP 7111107T Heat Sink Performance RP TEAM - RADIATION SAFETY TEAM INSPECTION 4 1, 2 12/06/2010 12/10/2010 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 1, 2 12/06/2010 12/10/2010 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1, 2 12/06/2010 12/10/2010 IP 7112202 Radioactive Material Processing and Transportation 1, 2 12/06/2010 12/10/2010 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 1, 2 12/06/2010 12/10/2010 IP 7113011 Material Control and Accounting (MC&A)

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.