March 04, 2024
Paula A. Gerfen, Senior Vice President,
Generation and Chief Nuclear Officer
Pacific Gas and Electric Company
P.O. Box 56
Mail Code 10/46
Avila Beach, CA 93424
SUBJECT:
DIABLO CANYON POWER PLANT, UNIT 2 - NOTIFICATION OF SITE
INSPECTION FOR LICENSE RENEWAL AND REQUEST FOR INFORMATION
INSPECTION (05000323/2024011)
Dear Paula A. Gerfen:
On April 8, 2024, the U.S. Nuclear Regulatory Commission (NRC) will begin a Site Inspection
for License Renewal for your facility. Three inspectors will perform this one-week inspection in
accordance with NRC Inspection Procedure 71013. This inspection focuses on activities
associated with license renewal: implementation of aging management programs, regulatory
commitments, as well as any tests or inspections of structures, systems, or components which
are only accessible at reduced power levels.
To minimize the inspection impact on the site and to ensure a productive inspection for both
parties, we have enclosed a request for information needed for the inspection. It is important
that all these documents are up to date and complete to minimize the number of additional
documents requested during the preparation and/or the on-site portions of the inspection.
Please provide this information electronically to the lead inspector. The information request has
two groups:
The first group lists information necessary for our initial inspection scoping and in-office
preparation activities. During the in-office preparation activities, the team will identify as
much as possible the information and activities to be reviewed during the inspection.
This information should be provided to the lead inspector by March 29, 2024.
The second group includes additional information required for the team to review the
selected activities. This information should be available to the team on April 8, 2024. It is
also requested that corrective action documents and/or questions developed during the
inspection be provided to the lead inspector as the documents are generated.
P. Gerfen
2
The schedule for the inspection is as follows:
Offsite Preparation Week: April 1-5, 2024
Onsite Inspection Weeks: April 8-12, 2024
PAPERWORK REDUCTION ACT STATEMENT
This letter contains mandatory information collections that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)
approved these information collections (approval number 3150-0011). Send comments
regarding this information collection to the Information Services Branch, Office of the Chief
Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of
Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and
Budget, Washington, DC 20503.
PUBLIC PROTECTION NOTIFICATION
The NRC may not conduct nor sponsor, and a person is not required to respond to, a request
for information or an information collection requirement unless the requesting document
displays a currently valid OMB control number.
This letter, its enclosure, and your response (if any) will be made available for public inspection
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public
Inspections, Exemptions, Requests for Withholding.
Sincerely,
Chris Smith, Senior Reactor Inspector
Engineering Branch 2
Division of Operating Reactor Safety
Docket No.
05000323
License No.
DRP-82
Enclosure:
1. License Renewal Phase 1 Document Request
cc w/ encl: Distribution via LISTSER
Signed by Smith, Chris
on 03/05/24
X
SUNSI Review
X
Non-Sensitive
Sensitive
X
Publicly Available
Non-Publicly Available
OFFICE
SRI:DORS/EB2
NAME
CSmith
DATE
03/05/24
Enclosure
License Renewal Phase 1 Document Requests
Inspection Report:
2024-011
Onsite Inspection Dates:
April 8 - 12, 2024
Inspection Procedure:
IP 71013 Site Inspection for Plants with a Timely
Renewal Application
The documents and information requested below should generally be made available to the
inspection team for the team's use both on-site and off-site. Electronic format is the preferred
media, preferably in a searchable format. Electronic media should contain descriptive names
and be indexed and hyperlinked to facilitate ease of use. Information in lists should contain
enough information to be easily understood by someone who has knowledge of light water
reactor technology. If electronic media is made available via an internet based remote document
management system, then the remote document access must allow inspectors to download,
save, and print the documents in the NRC's regional office. Electronic media on compact disc
or paper records (hard copy) are acceptable. At the end of the inspection, the documents in the
team's possession will not be retained.
This document request is based on typical documents that a generic plant might have. As such,
this document request is not meant to imply that any specific plant is required to have all of the
listed documents. In addition, your plant specific document titles may vary from the document
titles listed below. We also request that the information provided be sorted by the list below.
I.
Documents requested prior to on-site inspection (March 29, 2024)
1.
Provide a list of your license renewal commitments associated with appropriate aging
management programs. Include the completion status of each. For those not yet
complete, please provide an estimated completion date. We recognize that the
commitments may be draft given the timely renewal status of your license renewal
application.
2.
Provide a schedule of License Renewal activities associated with the upcoming
refueling outage. If there are no inspections planned, the inspectors will select areas
normally inaccessible that will need to be reviewed.
3.
For aging management programs that are one-time inspection programs, provide a
list of completed work order numbers for inspections that have been completed. This
should include identification of the inspected component.
4.
Provide current management and license renewal organizational charts, electronic
copies of Updated Final Safety Analysis Report, Technical Specifications, Technical
Specifications Bases, and Technical Requirements Manual.
5.
Provide copies of any internal/external self-assessments and associated corrective
action documents generated in preparation for the inspection.
II.
Documents requested for on-site inspection (April 8, 2024)
2
1.
Copies of the work orders requested during the preparation week related to the selected
commitments/aging management programs. This will include work orders of inspections
to be observed and completed work orders to be reviewed by the team.
2.
Contact information to facilitate inspector observation of the selected work activities or
evaluation of inaccessible areas.
3.
Documentation demonstrating completion of license renewal commitments considered
completed as of the inspection date. For example, this may be in the form of a binder for
each commitment that includes the implementing documentation and references.
III.
Documents requested through the inspection
1.
Copies of any corrective action documents generated because of the teams questions
or queries during this inspection.
2.
Copies of the list of questions submitted by the team members and the status/resolution
of the information requested (provide daily during the inspection to each team member).
If you have questions regarding the information requested, please contact the lead inspector.
Inspector Contact Information:
Senior Reactor Inspector
817-200-1095
chris.smith@nrc.gov
Senior Reactor Inspector
404-997-4468
paula.cooper@nrc.gov
Senior Project Manager
301-287-9232
andrew.siwy@nrc.gov
Mailing Address:
U.S. NRC, Region IV
Attn: Chris Smith
1600 East Lamar Blvd.
Arlington, TX 76011-4511