Notification of Site Inspection for License Renewal and Request for Information Inspection (05000323/2024011)
ML24065A366
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 03/04/2024
From: Casey Smith
NRC/RGN-IV/DORS/EB2
To: Gerfen P
Pacific Gas & Electric Co
References
IR 2024011
Download: ML24065A366 (1)


See also: IR 05000323/2024011

Text

March 04, 2024

Paula A. Gerfen, Senior Vice President,

Generation and Chief Nuclear Officer

Pacific Gas and Electric Company

P.O. Box 56

Mail Code 10/46

Avila Beach, CA 93424

SUBJECT:

DIABLO CANYON POWER PLANT, UNIT 2 - NOTIFICATION OF SITE

INSPECTION FOR LICENSE RENEWAL AND REQUEST FOR INFORMATION

INSPECTION (05000323/2024011)

Dear Paula A. Gerfen:

On April 8, 2024, the U.S. Nuclear Regulatory Commission (NRC) will begin a Site Inspection

for License Renewal for your facility. Three inspectors will perform this one-week inspection in

accordance with NRC Inspection Procedure 71013. This inspection focuses on activities

associated with license renewal: implementation of aging management programs, regulatory

commitments, as well as any tests or inspections of structures, systems, or components which

are only accessible at reduced power levels.

To minimize the inspection impact on the site and to ensure a productive inspection for both

parties, we have enclosed a request for information needed for the inspection. It is important

that all these documents are up to date and complete to minimize the number of additional

documents requested during the preparation and/or the on-site portions of the inspection.

Please provide this information electronically to the lead inspector. The information request has

two groups:

The first group lists information necessary for our initial inspection scoping and in-office

preparation activities. During the in-office preparation activities, the team will identify as

much as possible the information and activities to be reviewed during the inspection.

This information should be provided to the lead inspector by March 29, 2024.

The second group includes additional information required for the team to review the

selected activities. This information should be available to the team on April 8, 2024. It is

also requested that corrective action documents and/or questions developed during the

inspection be provided to the lead inspector as the documents are generated.

P. Gerfen

2

The schedule for the inspection is as follows:

Offsite Preparation Week: April 1-5, 2024

Onsite Inspection Weeks: April 8-12, 2024

PAPERWORK REDUCTION ACT STATEMENT

This letter contains mandatory information collections that are subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)

approved these information collections (approval number 3150-0011). Send comments

regarding this information collection to the Information Services Branch, Office of the Chief

Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington, DC

20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of

Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and

Budget, Washington, DC 20503.

PUBLIC PROTECTION NOTIFICATION

The NRC may not conduct nor sponsor, and a person is not required to respond to, a request

for information or an information collection requirement unless the requesting document

displays a currently valid OMB control number.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public

Inspections, Exemptions, Requests for Withholding.

Sincerely,

Chris Smith, Senior Reactor Inspector

Engineering Branch 2

Division of Operating Reactor Safety

Docket No.

05000323

License No.

DRP-82

Enclosure:

1. License Renewal Phase 1 Document Request

cc w/ encl: Distribution via LISTSER

Signed by Smith, Chris

on 03/05/24

ML24065A366

X

SUNSI Review

X

Non-Sensitive

Sensitive

X

Publicly Available

Non-Publicly Available

OFFICE

SRI:DORS/EB2

NAME

CSmith

DATE

03/05/24

Enclosure

License Renewal Phase 1 Document Requests

Inspection Report:

2024-011

Onsite Inspection Dates:

April 8 - 12, 2024

Inspection Procedure:

IP 71013 Site Inspection for Plants with a Timely

Renewal Application

The documents and information requested below should generally be made available to the

inspection team for the team's use both on-site and off-site. Electronic format is the preferred

media, preferably in a searchable format. Electronic media should contain descriptive names

and be indexed and hyperlinked to facilitate ease of use. Information in lists should contain

enough information to be easily understood by someone who has knowledge of light water

reactor technology. If electronic media is made available via an internet based remote document

management system, then the remote document access must allow inspectors to download,

save, and print the documents in the NRC's regional office. Electronic media on compact disc

or paper records (hard copy) are acceptable. At the end of the inspection, the documents in the

team's possession will not be retained.

This document request is based on typical documents that a generic plant might have. As such,

this document request is not meant to imply that any specific plant is required to have all of the

listed documents. In addition, your plant specific document titles may vary from the document

titles listed below. We also request that the information provided be sorted by the list below.

I.

Documents requested prior to on-site inspection (March 29, 2024)

1.

Provide a list of your license renewal commitments associated with appropriate aging

management programs. Include the completion status of each. For those not yet

complete, please provide an estimated completion date. We recognize that the

commitments may be draft given the timely renewal status of your license renewal

application.

2.

Provide a schedule of License Renewal activities associated with the upcoming

refueling outage. If there are no inspections planned, the inspectors will select areas

normally inaccessible that will need to be reviewed.

3.

For aging management programs that are one-time inspection programs, provide a

list of completed work order numbers for inspections that have been completed. This

should include identification of the inspected component.

4.

Provide current management and license renewal organizational charts, electronic

copies of Updated Final Safety Analysis Report, Technical Specifications, Technical

Specifications Bases, and Technical Requirements Manual.

5.

Provide copies of any internal/external self-assessments and associated corrective

action documents generated in preparation for the inspection.

II.

Documents requested for on-site inspection (April 8, 2024)

2

1.

Copies of the work orders requested during the preparation week related to the selected

commitments/aging management programs. This will include work orders of inspections

to be observed and completed work orders to be reviewed by the team.

2.

Contact information to facilitate inspector observation of the selected work activities or

evaluation of inaccessible areas.

3.

Documentation demonstrating completion of license renewal commitments considered

completed as of the inspection date. For example, this may be in the form of a binder for

each commitment that includes the implementing documentation and references.

III.

Documents requested through the inspection

1.

Copies of any corrective action documents generated because of the teams questions

or queries during this inspection.

2.

Copies of the list of questions submitted by the team members and the status/resolution

of the information requested (provide daily during the inspection to each team member).

If you have questions regarding the information requested, please contact the lead inspector.

Inspector Contact Information:

Chris Smith (Lead)

Senior Reactor Inspector

817-200-1095

chris.smith@nrc.gov

Paula Cooper

Senior Reactor Inspector

404-997-4468

paula.cooper@nrc.gov

Andrew Siwy

Senior Project Manager

301-287-9232

andrew.siwy@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Chris Smith

1600 East Lamar Blvd.

Arlington, TX 76011-4511