Mid-Cycle Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2015005 and 05000323/2015005)
ML15243A583
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/01/2015
From: Troy Pruett
NRC/RGN-IV/DRP
To: Halpin E
Pacific Gas & Electric Co
Ryan Alexander
References
IR 2015005
Download: ML15243A583 (7)


Text

UNITED STATES ber 1, 2015

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR DIABLO CANYON POWER PLANT, UNITS 1 AND 2 (REPORT 05000275/2015005 AND 05000323/2015005)

Dear Mr. Halpin:

On August 11, 2015, the Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Diablo Canyon Power Plant, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014, through June 30, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined the performance at Diablo Canyon Power Plant, Units 1 and 2, during the most recent quarter was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix, effective beginning the fourth quarter 2014, because of one White finding in the Emergency Preparedness Cornerstone, for Units 1 and 2. The specifics regarding the White finding in the Emergency Preparedness Cornerstone and subsequent transition of Diablo Canyon Power Plant, Units 1 and 2, to the Regulatory Response Column was described in our annual assessment letter to you, dated March 4, 2015.

The NRC plans to conduct a supplemental inspection to review the actions taken to address the performance issues associated with the White finding in accordance with Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area.

The NRC will plan this inspection activity when you provide written notification of your readiness for the inspection. This supplemental inspection will provide assurance that the root causes and contributing causes of the risk-significant performance issues are understood, that the extent of condition and extent of cause of risk-significant performance issues are identified, and that your corrective actions for risk-significant performance issues are sufficient to address the root and contributing causes and prevent recurrence.

The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, which requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit has been completed at Diablo Canyon Power Plant, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 2515/191, Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Ryan Alexander at (817) 200-1195 with any questions you have regarding this letter.

Sincerely,

/RA/

Troy Pruett, Director Division of Reactor Projects Docket Nos.: 50-275; 50-323 License Nos.: DPR-80; DPR-82 Enclosure: Diablo Canyon Power Plant, Units 1 and 2 Inspection/Activity Plan

ML15243A583 SUNSI Review ADAMS Publicly Available Non-Sensitive By: RAlexander Yes No Non-Publicly Available Sensitive OFFICE RIV/BC/DRP RIV/D/DRS RIV/D/DRP NAME RAlexander AVegel TPruett SIGNATURE /RA/ /RA/ /RA/

DATE 8/26/15 8/26/15 8/27/15

Letter to Edward from Troy Pruett dated September 1, 2015 SUBJECT: ANNUAL ASSESSMENT LETTER FOR DIABLO CANYON POWER PLANT, UNITS 1 AND 2 (REPORT 05000275/2015005 AND 05000323/2015005)

DISTRIBUTION:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Thomas.Hipschman@nrc.gov)

Resident Inspector (John.Reynoso@nrc.gov)

Administrative Assistant (Madeleine.Ariel-Davis@nrc.gov)

Acting Branch Chief (Ryan.Alexander@nrc.gov)

Senior Project Engineer (Ryan.Alexander@nrc.gov)

Project Engineer (Tom.Sullivan@nrc.gov)

Project Engineer (Matthew.Kirk@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

RIV State Liaison Officer (Bill.Maier@nrc.gov)

Project Manager (Siva.Lingam@nrc.gov)

Acting Team Lead DRS/TSS (Eric.Ruesch@nrc.gov)

Director, DIRS, NRR (Scott.Morris@nrc.gov)

Deputy Director, DIRS, NRR (Allen.Howe@nrc.gov)

Director, DORL, NRR (Anne.Boland@nrc.gov)

Deputy Director, DORL, NRR (George.Wilson@nrc.gov)

Director, NSIR/DPR (Rob.Lewis@nrc.gov)

Chief, PLB IV, DORL, NRR (Michael.Markley@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)

ROPassessment Resource@nrc.gov ROPreports@nrc.gov OEMail Resource@nrc.gov Distribution via Listserv for Diablo Canyon Power Plant

Page 1 of 3 Diablo Canyon 08/26/2015 14:07:02 Inspection / Activity Plan Report 22 07/01/2015 - 06/30/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP-1 - BIENNIAL EP PROGRAM INSPECTION 1 1, 2 07/20/2015 07/24/2015 IP 7111402 Alert and Notification System Testing 1, 2 07/20/2015 07/24/2015 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 07/20/2015 07/24/2015 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 07/20/2015 07/24/2015 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies EP-2 - EP PERFORMANCE INDICATORS 1 1, 2 07/20/2015 07/24/2015 IP 71151-EP01 Drill/Exercise Performance 1, 2 07/20/2015 07/24/2015 IP 71151-EP02 ERO Readiness 1, 2 07/20/2015 07/24/2015 IP 71151-EP03 Alert & Notification System Reliability RS 24 - RADIATION SAFETY 2 1, 2 07/27/2015 07/31/2015 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 07/27/2015 07/31/2015 IP 71124.04 Occupational Dose Assessment RS 13 PI - RADIATION SAFETY 2 1, 2 10/12/2015 10/16/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/12/2015 10/16/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/12/2015 10/16/2015 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 10/12/2015 10/16/2015 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71111.08 - INSERVICE INSPECTION 1R19 1 1 10/12/2015 10/23/2015 IP 7111108P Inservice Inspection Activities - PWR EB1-21T - DC COMPONENT DESIGN BASIS INSPECTION 6 1, 2 02/08/2016 03/11/2016 IP 7111121 Component Design Bases Inspection EXAM - INITIAL EXAM 3 1 09/19/2016 09/23/2016 X02599 2ND INITIAL EXAM DC U1 (09/2016)

2 09/19/2016 09/23/2016 X02600 2ND INITIAL EXAM DC U2 (09/2016)

1 10/03/2016 10/07/2016 X02599 2ND INITIAL EXAM DC U1 (09/2016)

2 10/03/2016 10/07/2016 X02600 2ND INITIAL EXAM DC U2 (09/2016)

EXAMS - INITIAL OPERATOR EXAM 5 1 03/21/2016 03/25/2016 X02569 INITIAL EXAM DIABLO CANYON UNIT 1 (04/2016)

2 03/21/2016 03/25/2016 X02570 INITIAL EXAM DIABLO CANYON UNIT 2 (04/2016)

1 04/18/2016 04/26/2016 X02569 INITIAL EXAM DIABLO CANYON UNIT 1 (04/2016)

2 04/18/2016 04/26/2016 X02570 INITIAL EXAM DIABLO CANYON UNIT 2 (04/2016)

RS 12 PI - RADIATION SAFETY 2 1, 2 05/09/2016 05/13/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 05/09/2016 05/13/2016 IP 71124.02 Occupational ALARA Planning and Controls This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 3 Diablo Canyon 08/26/2015 14:07:02 Inspection / Activity Plan Report 22 07/01/2015 - 06/30/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RS 12 PI - RADIATION SAFETY 2 1, 2 05/09/2016 05/13/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 05/09/2016 05/13/2016 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71111.08 - INSERVICE INSPECTION 2R19 1 2 05/09/2016 05/20/2016 IP 7111108P Inservice Inspection Activities - PWR TSB 52B - BIENNIAL PI&R INSPECTION 4 1, 2 06/27/2016 07/01/2016 IP 71152B Problem Identification and Resolution 1, 2 07/11/2016 07/15/2016 IP 71152B Problem Identification and Resolution EB1-07T - DC TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 08/01/2016 08/05/2016 IP 7111107T Heat Sink Performance RS 5678 - RADIATION SAFETY - TEAM 4 1, 2 08/08/2016 08/12/2016 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 08/08/2016 08/12/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 08/08/2016 08/12/2016 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 08/08/2016 08/12/2016 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EB2-05XT - TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2 10/03/2016 10/07/2016 IP 7111105X Fire Protection - NFPA 805 (Triennial)

1, 2 10/17/2016 10/21/2016 IP 7111105X Fire Protection - NFPA 805 (Triennial)

EP-2 - EP PERFORMANCE INDICATORS 2 1 10/31/2016 11/04/2016 IP 71151-EP01 Drill/Exercise Performance 1 10/31/2016 11/04/2016 IP 71151-EP02 ERO Readiness 1 10/31/2016 11/04/2016 IP 71151-EP03 Alert & Notification System Reliability EP-3 - BIENNIAL EP EXERCISE INSPECTION 4 1 10/31/2016 11/04/2016 IP 7111401 Exercise Evaluation 1 10/31/2016 11/04/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes INSP-BRQ - BIENNIAL REQUAL INSPECTION 2 1, 2 04/03/2017 04/07/2017 IP 7111111B Licensed Operator Requalification Program RS 13 PI - RADIATION SAFETY 3 1, 2 05/08/2017 05/12/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 05/08/2017 05/12/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 05/08/2017 05/12/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 05/08/2017 05/12/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71111.08 - INSERVICE INSPECTION 1 1 05/08/2017 05/19/2017 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Diablo Canyon 08/26/2015 14:07:02 Inspection / Activity Plan Report 22 07/01/2015 - 06/30/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EB1-17T - DC PERMANENT PLANT MODS & 50.59 3 1, 2 06/12/2017 06/30/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.